Tender Value
₹10.7 L
EMD Value
₹21,340
Closing Date
8 Oct 2026, 3:00 pmClosed
Executive engineer
EE SARYU NAHAR KHAND KHALILABAD
CONSTRUCTION OF OPERATOR ROOM AT SARYU NAHAR KHAND II, KHALILABAD, UTTAR PRADESH
2026_UPIDC_1191913_1
03/EE/2026-27
Open Tender
Civil Works
Item Rate
180 days
SANT KABIR NAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹21,340
Yes
SANT KABIR NAGAR
1 Oct 2026
1 Oct 2026
8 Oct 2026
1 Oct 2026
8 Oct 2026
1 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dry earth work in excavation of foundation including lead upto 30 m & lift upto 1.50 m and its disposal in all type of soil required for proper completion of the work above 10 cumec discharge. | 21.6 | CUM | - | - |
| 2 | Earth work by power Transport for a lead of upto 1Km. including Excavation Loading, Unloading, Stacking & manual compaction and dressing including all lift shall be applicable for lead beyond 630M and upto 1Km, excluding Royalty.Upto 10 km extra lead. | 14.09 | CUM | - | - |
| 3 | Laying P.C.C. in (M10) with 20mm to 40 mm size Dala crushed stone grit and Chopan coarse sand having F.M. not less than 2.0 etc. including cost of all material, labour and T&P etc. required for proper completion of the work.
(b) mechanical mixing + Labour cost | 2.09 | CUM | - | - |
| 4 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8.00Kms. From the site of work including watering, dressing etc. labour & T &P etc. required for proper completion of work saplings of girth upto 30 ground level and removal of rubbish upto a distance of 50m out side the periphery of area cleared. under floor Local Sand | 1.8 | CUM | - | - |
| 5 | Laying C.C. (M25) with 4.75 mm to 20 mm size Dala crushed stone grit and Chopan coarse sand having F.M. not less than 2.0 etc. including cost of all material, labour and T&P etc. required for proper completion of the work.
(b) mechanical mixing and Extra for mechanical vibration with 1% water charges.
Total Concrete work for structure. (5.88+8.63) | 14.52 | CUM | - | - |
| 6Centering and shuttering including strutting, propping etc. and removal of form for | |||||
| 6.01 | Foundations, footings, bases of columns, etc. for mass concrete | 19.4 | SQM | - | - |
| 6.02 | Suspended floors, roofs, landings, balconies and access platform | 40.74 | SQM | - | - |
| 6.03 | Lintels, beams, plinth beams, girders, brassumers and cantilevers | 34.36 | SQM | - | - |
| 6.04 | Columns, Pillars, Piers, Abutments, Posts and Struts
Stairs, (excluding landings) except spiral-staircases | 24.66 | SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.73 MB
BOQ_2249033.xls
BOQ • 0.40 MB
booklet3.pdf
Tender Documents • 5.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .