Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
4 Aug 2026, 6:00 pm3d left
Executive Engineer (O&M)
Tender for ARC for Emergency work of Fault Finding of 11kv/22kv underground XPLE Cable with 11/22kv cable end Termination & Straight Through jointing kit (Supplied by contractor) and erection of u/g cable under Ankleshwar Rural Division.
328300
E-24(2026-27)
Open
Power/Energy Projects/Products/Services
Works
Bharuch
15 documents required · 14 mandatory · 1 optional
₹2,360
DGVCL
₹20,000
28 Jul 2026
28 Jul 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
A. Tender notice, Tender copy and schedule-B & all other tender documents ( Duly
signed and stamped).
B. Tender fee & EMD payment receipts/ Original DD’s
C. PF registration,
D. Xerox copy of PAN card,
E. Partnership deed. (In case of Firm)
F. Electrical Contractor license.
G. Register copy of GST No.
H. Average Annual financial turnover during the last 3 years ending 31 st March of the
previous financial year i.e. FY 2022-23, FY 2023-24 & FY 2024-25 should be at least
30% of the tender value.
I. Experience of having successfully completed similar works during last 7 years ending
last day of month previous to the one in which applications are invited should be
other of the following.
a. Three similar completed works costing not less than the amount equal to
40% of the tender value.
b. Two similar completed works costing not less than the amount equal to
50% of the tender value.
c. One similar completed works costing not less than the amount equal to
80% of the tender value.
ONLY WORK COMPLETION CERTIFICATE (FORM3A) WILL BE CONSIDERED FOR
EXPERIACE CRITERIA.
1. Definition of similar; U/G CABLE LAYING + fault finding work.
J. Copy of Solvency Certificate of 20% amount of tender value
K. Undertaking in regard to Stop Deal / Black List Thereof As per ANNEXURE-A
L. Insurance Copy
M. Labor License
All above documents (A to L) are mandatory.
Seal & Signature of Contractor
Executive Eng. (O&M)
Ankleshwar Rural Division.
TECHNICAL CONDITIONS OF CONTRACT FOR U/G CABLE WORK
1. Laying of 22/11KV U/G cable.
(i) 22/11 KV CABLE will be supplied by DGVCL while outdoor cable kit,
Straight Joint Kit will be supplied by Contractor.
(ii) Contractor has to transport 22/11KV cable drums from store to site
and empty drums from site to store at his risk& cost.
(iii) Contractor has to excavate 1200mm deep trench and cable should
only be laid under DGVCL supervision.
(iv) Before laying of cable 100mm Layer of good sand is to be provided.
(v) Contractor has to provide to lay good quality & specified size of RCC
half round pipes.
(vi) Before laying of cable same should be tested with 5 KV megger in
presence of the I/C engineer.
(vii) Cable ends should be sealed properly whenever cable is cut & laid
before providing straight/end termination to prevent ingress of
moisture/ water/dust etc.
(viii) Contractor has to carryout work in co-ordination with local authority
like Nagar Palika/Gram Panchayat, Telephone and GIDC authority.
2. Fixing of Heat Shrinkable type end termination & straight through joints.
(i) Contractor should clarify the make of heat shrinkable cable end
termination and straight through joint.
(ii) Duel wall molded liabing should be available in straight through joint.
(iii) After competing work of cable laying end terminations. through joints
following test shall be carried out jointly by engineer in charge of
DGVCL and contractor.
(A) Insulation resistance test before & after with 5KV meg
Erection, Testing and Commissioning of 22/11 KV Under
ground Cables (22/11KV Cables tobe supplied by DGVCL) with
cable end Termination, straight through jointing kit of Various
feeders of DGVCL.
(iv) Contractor has to provide CPRl latest amended Test certificate and
satisfactory product performance certificate.
(v) On competent supervisor with skilled knowledge shall have toco-
ordinate the site authority of the joint he has to do all communication
of site with engineer in charge of DGVCL.
(vi) It is essential to have suppliers certificate of training for cable jointing
of cable jointer.
(vii) Jointer has to ensure safety while making joints or other nearby
cables are not damaged.
The bidder shall have to keep their jointer team at Ankleshwar headquarters
at all the time .they have to provide name , contact details and address along
with contract agreement any delay beyond 2 Hrs. to reach at site will attract
1 % penalty of respective location work amount
Ex. Engr. (O&M)
Contractor Ankleshwar
GUARANTEED TECHNICAL PARTICULARS
Heat Shrink outdoor end termination on11 kV (E) XLPE Cable
Particulars Unit Guaranteed Values
1.0 APPLICABLESTANDARDS As per IS:13573
GUARANTEEDPARTICULARS
For the nominal (phase to phase)
System Voltage KV 11 KV
Maximum system voltage KV 12 KV
A.C. withstand voltage Dry (ph/ground)
Time duration Mins 1 Min.
2.2 Partial Discharge at 2 Uo pC <5pC
2.3 Impulse Withstand, 1.2 / 50 / Us kV 75KV
Load Cycle Test
a)Each Cycle Heating Duration Hrs
2.4 Cooling duration Hrs.
b) Number of Cycles
c) Continuous phase to ground voltage Withstand
Thermal Withstand Short circuit current 1 Sec.
2.5 ka AsperIS:13573
2.6 Dynamic short circuit withstand 2.55xlsAsperIS:13573
2.7 DC Voltage kV 48kVfor30Mins.
3.0 KITPARTICULARS
Material of the tubing/ moulded party
3.2 Method of stress control High permittivity Material.
3.3 Method of environmental seal H.S. Black Insulating Tubes.
List of items included in the Kit
a) For Terminations Yes
3.4 b) Allowable Kit storage Temperature ºC
Normal Ambient Temperature
c) Kit shelf life Years Morethan5years
Cable Termination Instruction Manuals
Signature of Contractor Ex. Engr. (O&M)
GUARANTEED TECHNICAL PARTICULARS
Heat Shrink straight through joint on 11 kV (E) XLPE Cable
Particulars Unit Guaranteed Values
1.0 APPLICABLESTANDARDS As per IS:13573
GUARANTEEDPARTICULARS
For the nominal (phase to phase)
System Voltage KV 11KV
Maximum system voltage KV 12KV
A.C. withstand voltage Dry (ph/ground)
Time duration Mins 1 Min.
2.2 PartialDischargeat2Uo pC <5pC
2.3 ImpulseWithstand,1.2/50/Us kV 75KV
Load Cycle Test
a) Each Cycle Heating Duration Hrs
Cooling duration Hrs.
b) Number of Cycles
c) Continuous phase to ground voltage Withstand kV 2.5 Uo
60 Nos. at 2.5 Uo as per above cycles.
Water tightness test KV
Thermal Withstand Short circuit current 1 Sec.
2.5 ka AsperIS:13573
2.6 Dynamic short circuit withstand 2.55xlsAsperIS:135373
2.7 DC Voltage kV 48kVfor30Mins.
3.0 KITPARTICULARS
Material of the tubing/ moulded party
3.2 Method of stress control High permittivity Material.
3.3 Method of environmental seal H.S. Black Insulating Tubes.
List of items included in the Kit
a) For Joints Yes
3.4 b) Allowable Kit storage Temperature ºC
Normal Ambient Temperature
c) Kit shelf life Years Morethan5years
Cable Termination Instruction Manuals
Signature of Contractor Ex. Engr. (O&M)
Ex. Engr. (O&M)
Signature of Contractor Ankleshwar
Ex. Engr. (O&M)
Signature of Contractor Ankleshwar
Signature of Contractor
Ex. Engr. (O&M)
Following Drawing for Earthing to be added and the same is to be used wherever
earthing is needed.
11/22 KV Cable Trench for Single Cable laying drawing
11/22 KV Cable Trench for Double Cable laying drawing
Following Drawing of route marker to be added and the same is to be used for
Route maker for U/G cable.
Sign Board (Caution board)
D.O.D.P Bus bar arrangement drawing.
TECHNICAL SPECIFICATION
CLASS OF TERMINATION:
The XLPE 11/22 KV Link Lineshall be class 1 termination as per IEEE-48-1990.
APPLICABLE STANDARDS:
IS 13573-1992 with latest amendment – Latest Amendment.
IEEE 48-1990. The termination shall be Class
ESI-09-13. Performance specification for high voltage cable accessories. The cable
accessories being supplied in the form of kit which has different components to be
assembled at site.
TECHNICAL SPECIFICATIONFOR 11/22 KV XLPE UNDERGROUND CABLE.
1 This specification lays down the material properties. Performance requirement of
11/22 KV XLPE Cable termination and jointing system for use on electrical systems
operating at voltage 11/22KV (i.e. voltage at which the cable termination kit is meant
2 The term 11/22 KV XLPE Cable refers to extruded or Molded Polymeric. Polymeric
material which are cross linked by gamma radiation to develop elastic memory and
supplied in an expanded or otherwise deformed size and shape. Bidders should submit
the proof that the tubes are cross linked by gamma radiations. However chemically
cross linked, crotch seal and lug seals are permitted. Heat shrink kit should be supplied
in a expanded or otherwise deformed size and subsequent heating in an unconstrained
state to temperature above the shrink temperature results in the material recovering
or shrinking to its original shape. The heat shrink kits should consist of the following:
STRESSCONTROL XLPE SCREEN CABLE:
(a) Required length of stress relief tube should have minimum length of 150mm
having volume resistivity of 108 ohm – cm and permittivity of 25 to give optimum
electrical stress control. The impedance of the tube should not change by
temperature Variation from 5C to 125C. The stress control tubing should be
void free. Tenderer must submit the graph showing the effect of stress,
temperature and aging on the impedance of stress control tubing along with the
NON-TRACKING EROSION AND WEATHERRESISTANTPROTECTIONTO THE
CABLE TERMINATION:
(b) A 11/22 KV XLPE underground Cable flexible tubing preferably colored red silicon
based both ultra violet resistant and possessing non-tracking erosion weather
resistant properties shall be used as external covering for the cable cores for
outdoor and indoor termination. The tubing shall confirm to the requirement
given in List 1 to ESI 09-13 including Atlas weather – O – meter testing non-
tracking performance as per ASTM D2303. Non-tracking performance as per
ASTM D2132 (Dust Fog Test) 1 IEC 112 (Comparative Tracking Index) and VDE
0303 (Tracking and Erosion Resistance Test) shall also be complied with offer.
Also bidder has to submit the test results for non-tracking properties along with
life assessment report.
ENVIRONMENTAL SEALING:
Adhesives and sealants shall be provided in the termination and jointing kits for
environmental sealing against ingress moisture and aggressive gases. The adhesive and
sealant will flow due to heating and heating of heat shrinkable components during
installation and will fill all the voids and adhere to metal connectors and cable sheets. In
short, all adhesives should be anti-tracking type and required sealants and mastics shall
form part of kit.
FOR TERMINATION:
At the end, sealing of the strand between the lugs barrel and cable insulation shall be
(a) Non-tracking, erosion and weather resistant heat shrinkable tubing, pre coated
with non-tracking sealant.
(b) Non-tracking sealants strip.
11/22 KV XLPE underground flexible polymeric tubing, preferably black colored pre coated
with adhesive shall be provided for sealing the exposed metallic sheaths and sheath/earth
PROVISION OF ADDITIONAL CREAPAGEFOR INDOOR/OUTDOOR
Single piece, 11/22 KV XLPE under ground cable weather sheds having non-tracking,
erosion and weather resistant properties shall be supplied with the kits for application
over non-tracking tubing. The quantity of sheds to be supplied shall depend on voltage
grade and indoor/outdoor application and shall be indicated along with offer. Each shed
shall give an additional cripage length of at least 100mm.
INSULATION AND SCREENREINSTATEMENTFOR JOINTS:
The reinstatement of insulation shall be by means of heat shrinkable, flexible, polymeric
tubing made from a discharge resistant polymer, preferably colored red. The tubing after
complete recovery shall have a minimum wall thickness to ensure provisions of adequate
insulation in step.
EARTH&SCREENCONTINUITYFORTERMINATION& JOINTS:
Screen continuity by using tinned copper mesh and earth continuity by using tinned
copper braids of appropriate size shall be provided for transfer of screen/earth in straight
through joints.
In termination, tinned copper braids of appropriate size shall be provided for joints for
the continuity of screen/armor.
LUGS & FARRULES:
The requisite number and type of aluminum lugs/ferrules shall be provided for
termination/joints.
Lugs and ferrules for XLPE cables shall be crimping type suitable for compacted circular
conductor having two nos. of holes.
GI PIPE & HDPE PIPE:
The GI pipe and HDPE pipe shall be provided as per standard of DGVCL.
Ex. Engr. (O&M)
Contractor Ankleshwar
COMMERCIAL TERMS & CONDITION
1. TENDER SPECIFICATIONS:
All technical specification should be ISS/ISI/BIS. Specification framed out by the
Company is separately brought out in the tender documents. No deviation in
specification shall be allowed and Company’s decision shall be final. The Company
also desires that all the suppliers should possess high quality ISO 9001 / ISO
certificate within 2 years from 1/1/2001 and other things being equal, suppliers who
possess ISO 9001 / ISO 9002 certificate will be given preference in quantity
LATE / DELYAED TENDER SHALL NOT BE CONSIDERED.
Incomplete bids and amendments and additions to bids after opening of the bids will
be ignored out rightly.
2. The Tenderer must give in his offer, the full name and address with phone, Fax
&mobile numbers of the Representative who has been authorized by the Tenderer to
do work with the Corporation on their behalf.
3. The tenderers should invariably write the name and address of the Company, on
sealed covers of EMD. Otherwise the tender covers without the name and address will
not be opened which may please be noted.
4. The tender should be sent by R.P.A.D./Speed post only and addressed to The
Executive Engineer (O&M), D.G.V.C.L., Rural Division, Ankleshwar-
393001.(No Courier service will be accepted). Hand delivery of tenders will not be
DELAYED AND LATE TENDERS
No tender shall be accepted/opened in any case which are received after due date
and time of the receipt of tender irrespective of delay due to postal services or any
other reasons and company shall not assume any responsibility for late receipt of
tender. Any correspondence in this matter will not be entertained.
5. Tender fee (Non-refundable)
Tender fee (Non-refundable) plus GST as applicable notified in the tender notice
should invariably be paid by way of Demand Draft/ Bankers Cheque or cash otherwise
offer will be ignored out rightly. Indian Postal Orders (IOP’s) & Cheques are not
acceptable. Demand Draft/ Bankers Cheque should be in the “Name of Company.”,
Payable at Ankleshwar.
The Tender Fees is Non-Refundable under normal circumstances. However, if
purchaser company decides to scrap/ cancel the tender, by one or another reason, in
which bidders are not responsible for cancellation/ scrap of tender, in such case tender
fee may be refunded to bidder(s), at sole discretion of the purchaser company.
6. EARNEST MONEY DEPOSIT:
E.M.D. at the rate of 1% of the value of the Tender is payable. The EMD is
payable either in Cash or by Demand Draft in favour of The Dakshin Gujarat Vij
Company Ltd. Drawn on any Scheduled / Nationalized Banks payable at Ankleshwar.
7. SECURITY DEPOSIT:
Security Deposit should be paid within one week after receipt of the order. The
successful tenderers will be required to pay an amount equivalent to 5 % of the value
of the order as a Security Deposit for satisfactory execution of the contract. Such
Security Deposit will be payable in Cash / D.D.
Prices quoted should be FIRM and inclusive of all taxes, nothing will be paid ex
Prices quoted should be FIRM and or F.O.R. Destination basis (i.e. any of the stores
of COMPANY in Gujarat. However, the Tenderer should indicate in the Schedule-B
(i.e. Price Bid), the break-up of Total Unit F.O.R. Destination Prices and Total Unit End
Cost with GST and Cess as applicable stating the Unit Ex-works price, freight, packing
& forwarding charges, insurance charges, GST and Cess as applicable separately in
price bid, which is a must.
If the Supplier/Contractor has opted for the composition scheme of GST, the same
must be clearly specified with valid Declaration & self-certified Certificate from
Department. In the event of withdrawal/cessation of the Supplier from composition
scheme during the tenure of the contract, the rate (i.e. price) mentioned in the price
bid shall be final and any additional GST will have to be borne by the tenderer himself.
In no case additional amount towards GST or otherwise will be paid / reimbursed to
supplier/contractor. Further statutory variation clause will not be applicable in case
of Supplier/Contractor has opted for Composition Scheme under GST.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess
as applicable for each item of Goods/Service. If not specifically mentioned then
COMPANY will have the option to take the prices as exclusive of taxes and duties at
maximum higher slab rates for the evaluation of the tenders.
The Tenderer should invariably indicate the total unit end cost price considering all
their costs / calculations in the Price bid itself for each item and all sub-items if any.
This is a must. Cost components hidden / furnished elsewhere will not be considered
and will be ignored out rightly.
Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the
bidder intends to supply the goods / services, meaning there by the bidder has to
supply the goods / services from the relevant declared / registered place of supply
9. VALIDITY OF THE OFFER:
The offer will have to be kept valid for a period of 120 days from the date of opening
of technical bids. In case of finalization of the tender is likely to be delayed, the
tenderer’s will be asked to extend the same without change in the prices or any terms
and conditions of the offer. If any change is made, original or during the extended
validity period, the offer will be liable for outright rejection without entering into
further correspondence in this regard and no reference will also be made.
10. PRICE EVALUATION:-
No price preference shall be given on any account. All tenders will be evaluated
on firm price basis. Company may go for the price L-2 depending upon the
exigency. If Company feels that there is lack of serious competition or any other
reasons, Company may negotiates with the L-1 party. Company’s decision shall be
final and binding to all the parties.
No price preference shall be given on any account. All Tenders shall be evaluated
on firm price End Cost (with GST and Cess as applicable) basis unless otherwise
mentioned in the Tender documents.
If the Tender is invited with Total Owning Cost (TOC) clause, the evaluation shall
be done accordingly. For the same, the Bidders have to give the detailed breakup
of the End Cost.
11. QUANTITIES:-
The quantities mentioned in the schedule attached herewith are tentative and tobe
procured / executed by the successful contractor the same rates accepted by the
DGVCL in various A/T and all the terms and conditions of the order.
However payment shall be made only for the actual quantities utilized / executed
to complete the work. The work is to be carried out in piecemeal, looking to its
nature and requirements, as per decision of the in-charge engineer.
12. PACKING AND FORWARDING CHARGES:-
The prices shall be inclusive of packing & forwarding charges. The stores should
be strongly and adequately packed to ensure safe arrival at destination.
13. PAYMENT TERMS:
Payment shall be made by the Rural Division Office, Ankleshwar on completion of
the job and production of work completion certificate of the Sub Division Office In-
charge, after following the procedures of D.G.V.C.L. R. A. Bill will be passed as per
Company’s Rules and Regulation.
14. REPEAT/ADDITIONAL ORDERS:-
The Company reserves the right to place repeat orders / additional orders on the
successful tenderer up to 50% of the original quantity of the A/T at the same
prices terms and conditions stipulated in the original order mutually agreed upon.
15. COMPLETION PERIOD:-
The Tenderer should agree with activity wise time bound program for completion
of supply and erection work in all respect as per terms and conditions of this
16. POST TENDERCORRESPONDENCE / ENQUIRIES:-
Any correspondence or enquiry subsequent to opening of Technical and
Commercial bids is not desirable, if the same is indulged into, it will be considered
for disqualifying the tender. The Tenderer will be required to abstain from pursuing
/ canvassing the matter, directly or indirectly with any Officers of the DGVCL, as
otherwise the same would also amount to disqualification of the tender.
17. The purchaser (i.e. Company) shall have the right to make any changes, additions
/ deletions or modifications in any terms / conditions of the tender and / or
specifications as may be deemed necessary by the Corporation at its sole discretion
at any time before the due date of opening of the tender.
18. TYPE TESTS:-
All the necessary Type tests will have to be carried out before submission of the
tender and to be submitted along with the Tender. The Type Tests which are more
than 05 (Five) years old (from the date of opening of the tender) will not be
considered (except otherwise specifically mentioned in the Guaranteed Technical
Particulars (i.e. GTP’s.) and such tenders will be rejected. All the required type
tests should not be older than 5 (five) years. All the required type tests on
one particular item must have been conducted in the span of one year
only. If the type tests for the tendered items are not carried out before the
submission of the tender, then it will at Company’s sole discretion to accept them
or NOT. However, depending upon Company’s requirement, if the Letter of Intent
(LOI) is placed subject to submission of type tests, then in such cases all the
necessary Type tests will have to be carried out by the firm within 30 (Thirty) days
of the issue of LOI or at Company’s discretion, failure to do so the LOI stands
cancelled and the detailed purchase order will not be placed and no further
correspondences in this matter will be entertained at any cost and will be out
rightly ignored.
19. Company does not accept the printed conditions of any Tenderer. It will be ignored
without any reference; hence tenderers should withdraw such printed conditions
if they have any.
20. Tenderer should furnish a list of orders for similar works executed by them
indicating the name of the party and their order reference to whom they have
worked to be furnished. Failure to do this will result on suppliers tender being
rejected without any reference. In case of bought out items they should furnish
the backup guarantee from their principals.
21. The materials should be offered strictly confirming to ISS / BIS / Tender
specifications given in the tender. If the tenderer’s desires to quote with any
technical deviations they should specifically quote the deviation & the ISS or BIS
Nos. in the body of the tender itself under the respective Annexure of this tender
document. If technical deviations furnished by the Tenderer are not agreeable to
the Corporation, the offers may be ignored. However it will be solely at Company’s
discretion to consider the technical deviations OR not for considering the Tenderer.
No correspondences of the Tenderer after opening of the bid will be entertained
in this matter.
22. Revision of prices or any commercial terms affecting the price after opening of
technical bids shall not be considered and will be ignored.
23. Please give suitable declarations as under: I / We declare that we are Authorized
Distributor OR Dealer for all the tendered items.
24. Tenderer should specifically mention in the offers and should indicate in Block
letters the name of the Partners / Proprietor / Directors who is / are the signing
25. GUARANTEE:-
If the goods, stores and equipments found defective due to bad design or
workmanship the same should replaced by you free of charge if reported within
60 months (5 years) of their installation at site. You will be responsible for the
proper performance of the equipments / materials for the respective guarantee
26. OTHER CONDITION OF SUPPLY:-
The Company’s General Conditions of contract will apply to all contracts and
supplier will be deemed to be fully aware of the Company’s general conditions of
contract for the supply of plant equipment and materials except the conditions
modified in this commercial terms and conditions and any ignorance of these
Conditions, will not exempt supplier from their liability to abide by the same. Copies
are available from the Division Office
27. Although the materials have tobe supplied as per ISS and or as per the tender
specifications, the Company will take random samples from the materials supplied
and subject them to tests according to ISS in approved laboratories. The materials
should stand these tests and if the materials do not stand these tests, they will be
summarily rejected and the supplier should make immediate arrangement to
replace them with standard materials and after getting them duly inspected and
28. If in any company, the interest of any employee of the DGVCL or his relative as
defined in Section VI of the Company’s Act. 1956, is 10% or more, DGVCL will not
deal with such company at all. Tenderer therefore, must specifically is closet is fact
in his technical Bid. Non-disclosure of such facts would disqualify the Tenderer for
further dealing with DGVCL.
29. ARBITRATION:-
(1) Amicable Settlement:-All disputes, differences controversy or claim between the parties
arising out of or in relating to this contract with reference to the construction
interpretation breach, termination or validity thereof(hereinafter referred as “the
Dispute”) shall upon the written representatives of the disputing parties for resolution.
The authorized representatives shall promptly meet and attempt to negotiate in good
faith a resolution of the Dispute within thirty days of the service of the request.
(2) Arbitration:- If the parties fail to amicably resolve the disputes or differences
controversy or claims as indicated herewith in sub clause(1) of clause 9,arising under or
in connection with the present works contracts, whether pertaining to works contracts
alone or works and procurement both, the same shall be referred to arbitration under the
Gujarat Public works Contracts Disputes Arbitration Tribunal Act,1992.”
30. JURISDICTION:-
All questions, disputes or differences arising under out of or in connection with the
Tender / Contract if concluded shall be subject to the exclusive jurisdiction of the
court under whose jurisdiction the place from which the tender / Acceptance of
tender is issued, is situated i.e. DGVCL, RURAL DIVISION, ANKLESHWAR.
31. SUBMISSION OF OFFERS:-
The firm having single legal entity and having two or more works / factory and
submits offers from two or more different works / factory, in such case Company
will consider only ONE lowest offer for allocation of quantity. Many of the
tenderers are submitting their offers with the conditions of advance
payment along with the order; such conditions are not acceptable by the
32. The Tenderer if being an agent, who submits its offer to Company, will have to
give information and declare the name of the principle from which he will procure
the materials and supply to Company along with company’s written confirmation
about quality and backup performance guarantee. Only on getting complete
information from Agent, such offer if found suitable shall be taken in consideration.
33. Company reserves the right to cancel any or all the offers / bids or to accept any
offer without assigning any reasons. Also in case Company finds that there is an
attempt of curtail in the prices, Company reserves the right to consider or reject
any or all the parties offers without assigning any reasons thereof.
34. Company reserves the right to increase or decrease the quantity against each
item/s while placing the order.
35. All the suppliers / manufacturers should possess high quality ISO 9001 / ISO
Certificate within 2 years. Other things being equal the company possessing the
ISO 9001 / ISO 9002 license will be given preference if other requirements match.
36. The tenderers are required to furnish the technical information and the guaranteed
technical particulars (GTP) along with company seal and signature of the Tenderer
on each and every page / papers of the tender documents.
37. All the costs of the stamp papers are tobe borne by you as per the Govt. Of India’s
latest guidelines.
38. Tenderer should invariably fill up all the details of all the Annexure including the
prices in the Price Bid Annexure of this tender document. This is mandatory. Also
all the Annexure should be duly signed by authorized signatories with their rubber
stamp and along with Company’s Rubber (Round) seal / stamp affixed on each
39. If the Tenderer fails to pay the Security Depositor defaults in execution of the
orders placed or if Company suffers any financial loss due to this, then Company
will be at liberty to adjust the amount from other orders of the same firm or by
encasing the Bank Guarantee.
40. LABOUR LAWS:-
Persons below the age of 18 years shall not be employed for the work. No female
workers shall be employed in the night shift between 07.00 P.M. and 6.00 .A.M.
Contractor shall maintain a valid labour license under the Contract
Labour(Regulation and abolition) Act for employing necessary man power required
by him. In the absence of such a licensee, the contract shall be liable to be
terminated without assigning any reason thereof. Contractor should also employ
qualified and experiences persons as per requirement of Electricity Act and rules
for carrying out supply and erection work under this contract.
The Contractor shall at his own expenses comply with all labour laws and keep the
DGVCL indemnified in respect thereof. Some of the major liabilities under various
labour and Rural laws which the Contractor shall comply which are as under:
Payment of contribution by way of Employer’s Contribution towards Provident
Fund. Family Pension Scheme Deposit Linked Insurance Scheme, Administrative
charges etc. at the rates made applicable from time to time by the Government of
Gujarat / Government of India or others Statuary / Authority.
Payment of Deposition respect of each contract labour with the Office of
Commissioner of Labour as per the Contract Lab our (Regulation and Abolition)
License fee as prescribed under the Contract Labour (Regulation and Abolition) Act
and Rules framed there under depending upon the number of workmen.
Paid leave facility and wages as per the provision of the Factories Act., at the rate
of one day for every 20 days of working. Identify Cards as prescribed under the
Factories Act., with photo affixed thereto for identification.
Payment of retrenchment compensation, Notice Pay and other liabilities as per
Rural Dispute Act., Any payment to the Contractor’s employee arising out of any
claim of dispute under the Rural Disputes Act,1947 or any other Labor Laws.
Payment of compensation in case of accidental injury.
Provision of crèche if the female laborers employees are more than
Maternity leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other
liabilities prescribed under the various labor laws, in force from time to time, from
Statutory Authorities like State Government / Government of India, which the
Contractor shall have to comply with.
41. PROVIDENT FUND AND FAMILIY PENSION SCHEME:-
The Contractor shall submit along with his bills (Month wise ) a Statement
regarding deduction against employees Provident Fund and Family Pension
Scheme in respect of each concerned employees. The contractor’s contribution and
the workers’ contribution towards Provident Fund and Family Pension Scheme shall
be done at the rate made applicable by the Government from time to time and
deposited by the contractor with Regional Provident Fund Commissioner SURAT.
42. DEPOSIT LINKED INSURANCE SCHEME:-
The contractor shall have to deposit1.2% of the wages in respect of employees
who are members of the Provident Fund as the contribution to the Deposit Linked
Insurance Scheme with Regional Provident Fund Commissioner.
43. ADMINISTRATIVE CHAGES:-
Administrative charges for maintaining Provident Fund Account shall be deposited
by the Contactor with Regional Provident Fund Commissioner, SURAT at the rates
44. PAID LEAVE FACILITY:-
Paid Leave Facility at the rate of one day for every twenty days worked by the
Contract Labour shall be provided by the Contractor to his workers. He shall
maintain Leave Records, Leave cards for individual labourer which shall be duly
verified approved and certified by the authorized Officer of the DGVCL.
45. WORKMEN’S COMPENSATIONACT AND EMPLOYER’S LIABILITY
The Contractor shall cover all his employees under workmen’s compensation act
and under its liability insurance. The DGVCL shall not be responsible for any
payments of compensation to the workers / supervisor of the contractor for fatal
or non fatal accidents during the tendency of the contract.
The contractor shall employee adequate number of qualified and experienced staff
at site for daily supervision and for maintenance of various registers and records
rejected under the law and contract. No payment for supervision shall be
admissible. The list of names of such persons with their qualification and
experience should be furnished with the tender.
46. CONTRACTOR TO INDEMIFY THE DGVCL:-
The Contractor shall indemnify the DGVCL and every officer and employees of the
DGVCL including, Engineer – In-charge and his staff against all actions,
proceedings, claims, demands, cost and expenses whatever, arising out of or in
connection with the matter referred herein above and elsewhere and against all
actions, proceedings, claims demands, cost and expenses which may be made
against the DGVCL or Government for or in respect of performance of the
obligation under the contract documents. The DGVCL shall not be liable for or in
respect of or in consequence of any accident or injury to any workman or other
person in the employment of the contractor or his sub-contractor and the
contractor shall indemnify and keep indemnified the DGVCL against all claims,
demands, proceedings, cost, charges and expenses whatever in respect thereof or
in relation thereto.
47. WORKMEN’SCOMENSATION AND EMPLOYEES LIABILITY INSURANCE:-
Insurance shall be effected for all the Contractor’s employees engaged in the
performance of this contract. If any of the work is subject, the Contractor shall
require the Sub-Contractor to provide workmen’s employer’s liability insurance for
the latter’s employees and ensure that such employees are covered under the
Contractor’s Insurance.
48. WAGES TOBEPAID&TIME OF PAYMENTETC. BY THE CONTRACTOR:-
The Contractor shall pay minimum wages per day to his Labours / Workers as per
rates fixed under the minimum wages Act. The wages of every Contract Labour
employed by him under this contract shall also be paid by him before the expiry of
7th day from the last day of the month in respect of which the wages are payable
( i.e. wages of a month have to be paid by him in the first week of the next month).
Any default will result in cancellation of contract work with or else the Contractor
shall be punishable to the extent of Rs. 100/- for each day of default.
The Contractor shall give his Addresses, Telephone Number and etc. to the
DGVCL, so that, in case of labour trouble etc. the Contractor can be contacted.
The Contractor shall arrange to have his office within working area and the
contractor keep himself present throughout the working hours.
The contractor who are having separate P.F. Code No. from RPFC, it should be
ensured that all the contract labourers are covered under the Provident Fund
scheme, and employees’ pension scheme and their contributions are remitted
regularly to the concerned Xerox copies of the challans in this regard be collected
from the concerned contractor and kept in the file of the concern contractor
49. INCOME –TAX:-
Income-tax at source at the prevailing rate will be deducted from your bill in
accordance with the provision of Income-Tax Law sand to that effect a certificate
will be issued to the contractor.
As the material is to be procured by the successful bidder, the contractor shall
make its own arrangement to avoid breakage, losses and wastages of material etc.
And no wastage on this account shall be considered payable by the DGVCL.
DGVCL reserve the right to check all the activities carried out by the successful
bidder at each stage or during execution to see that the work is executed as per
the various drawings, standards, norms, rules and the regulations of the DGVCL.
51. PRESENTATION OF BILLS:-
The bills in serially numbered for the work executed including cost of material
consumed is to be prepared in Triplicate and submitted to the E.E. (O&M) Rural
Division, Ankleshwar through concerned Sub Division.
The contractor may note that no payment shall be released for the additional
quality supplied which is not required for completion of line.
The Contractor has to submit the final bill along with the material consumption
statement along with other required data’s of the work carried within 3 months
from the date of completion of work.
For non-submission of part submission of above information, no bills shall be
52. WAY LEAVE /ACCESS TO LOCATION / RIGHT OF WAY:-
The successful bidder shall have to arrange for right of way and for tree clearance
It will be the contractor’s sole responsibility to take the materials up to the
location. Any path way, temporary road, temporary bridge required will have to
be provided by the contractor at his cost. If for any reasons the above is not
feasible, the contractor at his own cost shall have to arrange transportation by
The contractor will be deemed to be very well familiar with the route of the
Distribution line before giving the offer. No with standing the difficulties of terrain
location approaches way leave and other obstructions the price quoted for all the
items of erection I the Schedule of Section shall not undergo or any change at
any stage or granted by DGVCL for any special rates / consideration.
53. The enclosed List of Annexure and Documents should be invariably submitted
along with the tender:
54. Please note that any additional conditions / deviations, if any, found in the
Commercial terms & conditions then the Price Bids of such tenderers will not be
opened and no further correspondences in the matter will be allowed.
55. All the tenderers must ensure that all the relevant documents / papers submitted
with the tender should be serially numbered, properly bounded / tied together and
properly documented. This must be adhered to.
56. All the above points should be complied by the Tenderers. If not, tenders are
likely to be ignored without making any further reference.
Ex. Engr. (O&M)
Contractor Ankleshwar
SPECIAL TERMS AND CONDITIONS:
1. The work is to be executed in the area of DGVCL in all respect as per the instructions
of Engineer-in-charge by arranging all required materials tools, tackles equipment
including labors, transportation etc. DGVCL will not pay anything extra on this account.
2. The DGVCL reserves the rights of retrenching and dismissing any person employed
for the work if there is complaint against his misbehavior, misconduct or disloyalty
3. Terms and conditions regarding rural laws and other related matters shall be complied
by the contractor in all respect.
4. No part of the contract nor any share of interest there in shall in any manner of degree
be transferred/assigned or subject by the or indirectly to any person/firm or
Corporation whatsoever.
5. The contractor shall ensure that all persons are provided with the safety tools, shoes,
etc. as may be required from safety point of view and all his persons shall follow the
instructions issued by the DGVCL from time to time related with the safety and security
to carry out the work.
6. DGVCL shall not be liable for any damages or compensation for any injury or for any
accident occurred to any person engaged by the contractor. The contractor shall keep
the DGVCL indemnified thereof.
7. The contractor shall be liable for making good all damages/losses arising out of
workmanship, breakages, pilferage, etc. to the DGVCL.
8. Contract period:
1) The contract period will be Twelve Months from the date of issue of the
2) If during the contract period, execution of work is not found satisfactory in
any respect, job will be got executed through other agency at the risk and
cost of the contractor. DGVCL reserves the right to terminate your order
without assigning any reason.
9. The rates agreed herein shall remain firm till the expiry of contract. The contractor
shall not be entitled to any increase or revision (Statutory or otherwise) or any other
right or claim. Whatsoever by way of representation, explanation statement or any
undertaking or promise given or alleged to have given by any employee of the
company or due to contractor’s own ignorance on account of any difficulties or
hardships faced by him. The rates as such are all inclusive of all.
10. The rates should be quoted in percentage in enclosed schedule only, both in words
and in figures, as specified therein. In case of any discrepancy between the
rates/amount quoted in words & figure, the rates/amount most favorable to the
DGVCL shall be considered.
11. Conditional tender will not be accepted and likely to be rejected.
12. The DGVCL do not bind themselves to accept lowest or any tender.
13. The DGVCL reserves all rights to accept orreject any or all tenders without assigning
14. The quantity given in Schedule ‘B’ is approximate. There will be increase or decrease
in the quantities. Please note that within the estimated cost quantities of item may
very as per the requirement of the Board. In such event, payment will be made on
the basis of actual quantities executed.
15. Successful bidder shall submit monthly report for work executed by them giving
details of Name of s/s, Name of feeder, type of kit used ,date of providing kit, sub
order no.etc. utilized by them to The E.E (O&M), DGVCL, Rural Dn, Ankleshwar.
16. Proprietor/Partner /Director of bidder/firm is not stop deal/Show cause/banned for
business dealing and /or black listed by GUVNL and / or their any subsidiary company
Viz. MGVCL/PGVCL/UGVCL/GSECL/ GETCO/DGVCL. If found during Tender procedure
DGVCL has rights to disqualify/reject at any stage of tender.
17. BIDDER TO SATISFY THE ENTIRE FOLLOWING PRE-QUALIFIYING
1. The bidder should have experience in erection, commissioned and
tested(11/22 KV or above voltage class) of HT cable laying works successfully
in last three years in electricity utility.
2. The same should have been in successfully commissioned and in working
condition in electricity utility.
3. All the Equipment proposed to be supplied shall have valid type test certificates
of relevant IS from Government approved/NAB Laboratory not older than
3 years & must be valid up to the expiry of validity of offer.
4. Average annual financial turnover during the last 3 years ending 31 march of
previous financial year should be at least 30% of the individual estimated cost.
5. Experience of successfully completion of similar type of work during last 7 years
i.e. ending last day of month previous to the one in which application are invited
should be either of following:
a. Three similar completed works costing not less than the amount equal to
40% of the tender value.
b. Two similar completed works costing not less than the amount equal to
50% of the tender value.
c. One similar completed works costing not less than the amount equal to 80%
of the tender value
5.1) Liaison charges with utilities, Electrical inspector & other local utilities like telecom,
GAS, & networking etc. Preparation of site drawing and approval of Railway for cable
laying is in scope of contractor, Insurance & liabilities arisen thereupon shall be borne by
5.2) Definition of “similar type of work” is the criteria regarding satisfactory
performance of works, personnel, establishment, plant, equipment and the
execution of work as per the specification and norms mentioned in work schedule
within stipulated time period of respective work order etc. shall be in corporate
according to the requirement of the project.
The bidder shall have valid Electrical Contractor License of Gujarat and registered
under GST Act, should have PF Registration Certificate.
18. Bids with Consortium Members Joint Venture are not allowed. All supporting
documents are required to be attached for verifying & confirming the all the
(Five) pre-qualifying conditions. The owner may assess the capacity & capability
of the bidder, to successfully execute the scope of work covered under the work.
19. The bidder/EPC contractor should provide authorization letter/vendor
registration of materials/equipment’s (e.g. CSS, cable etc.) of OEM (Original
Equipment Manufacturer).
20. The owner may assess the capacity & capability of the bidder, to successfully
21. Goods and Service Tax (GST) :
The F.O.R. Destination prices are including GST and Cess as applicable which will
be paid extra on a given taxable goods and/or services within the original
contractual delivery period. The amount of GST and Cess as applicable should
clearly be indicated separately. (FST/Cess means all applicable Tax/Cess under
GST Laws. GST Laws means IGST Act, GST (Compensation to the State for Loss
of Revenue) Act, CGST Act, UTGST Act and SGSCT Act, 2017 and all related
ancillary legislations).
It the Supplier/Contractor has opted for the Composition Scheme of GST, the same
must be clearly specified with valid Declaration & Certificate from department. In
the event of withdrawal/cessation of the Supplier from Composition Scheme during
the tenure of the contract, the rate mentioned in the price bid shall be final and
any additional GST will have to be borne by the tenderer. In no case additional
amount towards tax or otherwise will be paid / reimbursed to supplier/contractor.
Further Statutory Variation clause will not be applicable in case of Supplier /
Contractor has opted for Composition Scheme under GST.
Supplier/Contractor should charge GST in Invoice at the rate as agreed to /
mentioned in acceptance of tender only and any deviation in the same shall not
be accepted. Further, any additional liability of GST (later on due to wrong
mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.) over and above
as charged in the invoice shall be borne by the Supplier/ Contractor. However,
any refund received by the supplier / contractor on account of GST charged from
the company; such refund shall have to be passed on to the company, along with
interest if any. Such refund along with interest needs to be passed on suo-moto
by the supplier / contractor.
In case, Govt. revised the rate of GST rate / Code during the tenure of the contract,
the provision of GUVNL’s statutory variation clause shall apply.
22. INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due
to inclusion of any other additional item of their inputs / input services under the
ambit of the Input Tax Credit provisions under the GST Act, subsequent to the
date of submission of the offer, the same should be passed on to COMNPANY
and you should inform such changes to COMPANY from time to time.
23. STATUTORY VARIATION:
Any statutory increase or decrease in the taxes and duties including GST and Cess
as applicable or in the event of introduction of new tax/cess or cessation of existing
tax/cess subsequent to suppliers offer if it takes place within the original
contractual delivery date will be to COMPANY’s account subject to the claim being
supported by documentary evidence. However, if any decrease takes place after
the contractual delivery date, the advantage will have to be passed on to company.
Statutory Variation clause shall not be applicable in case of Supplier / Contractor
has opted for Composition Scheme under GST.
The terms and conditions stated above are carefully read by me/us and are
acceptable to me/us.
Ex. Engr. (O&M)
Contractor Ankleshwar
In connection with the above subject and reference I/ We confirm the following:
1. I / We, the under signed have read and examined the Tender Specifications in
tender mentioned under reference along with the Commercial terms and
2. I / We, declare that our Technical Bid is strictly in line with the Tender
specifications (except the deviations shown in Annexure of Technical Deviations
as per clause no.22 of this tender document).
3. I / We also agree that additional conditions that I/We (proprietor/Partner
/Director) of bidder/firm is not stop deal/Show cause/banned for business dealing
and /or black listed by GUVNL and / or their any subsidiary company Viz.
MGVCL/PGVCL/UGVCL/GSECL/ GETCO/DGVCL. If found during procedure DGVCL
has rights to disqualify at any stage of tender.
4. Further, I / We also agree that additional conditions / deviations, if any, found in
the Commercial terms & conditions (except reference under clause no.22 of this
tender document), our offer shall be out rightly rejected without assigning any
reason thereof.
Ex. Engr. (O&M)
Contractor Ankleshwar
DAKSHIN GUJARAT VIJ COMPANY LTD.
O & M DIVISION ANKLESHWAR
TERMS & CONDITION
1) DE will give the programme to the contractor under intimation to the Division Office, with
the details of work under each item with quantity feeder wise and location wise and
accordingly on receipt of such intimation the contractor shall have to start the work within
10 days, failing which the particular work shall have to be got completed by the DE
concerned through sources at the cost and risk of the contractor. The expenditure incurred
in excess in such cases, then the tendered rates shall have to be recovered from the amount
due to the contractor.
2) According to the contractor, if he feels more errection work than actually intimated to him
by the DE concerned through sub-work order he should not carry out such work at his own
accord but he should point out the same to the DE and only if he agrees to the same and
issued supplementary sub-work order, than only such work should be carried out. For the
work carried out without such sub-work order will not be paid to the contractor.
3) The contractor should prepare a detailed list of work carried out by him location wise as per
sub-work order and he should obtain the signature there on of the DE OR JE of the S/dn
and the same should be presented to the DE for preparation of bill.
4) Whenever any material is required to be replaced the contractor shall be given such material
from the sub-division office and for the same he will have to send full account to the S.D.O.
similarly any broken or scrap material gathered from such work should be credited to sub-
division office. If no such old scrap material is available on line, he should obtain clear
certificate to that effect from the DE OR JE concerned.
5) What so ever material is required to be use by the contractor as per schedule of the tender,
he will have to bring the same to the notice of the DE OR JE and the same should be utilized
as per there instruction, only when such materials are approved by them.
6) For Tools, Tackles, Hand Carts etc. the contractors shall to make their own arrangement.
7) The contractor should obtain insurance policy in respect of his lab ours towards accident risk
and the Xerox copy thereof should be produced to the Division Office along with the contract
documents executed.
8) Before starting the work on any line the contractor shall have to obtain shut down on that
line through the DE/JE concerned and regarding the shut down obtained he should get such
shut down order. If the contractor fails to obtain such order from the DE/JE concerned,
them in cases of any event of accident or otherwise, the contractor will be only responsible.
9) Carryout the work as per R.E. norms.
10) The painting works to the fabricated material is must.
11) The numbering work is must.
12) You will have to carry out the work under any s/dn office under control of Ankleshwar
(O&M) division if required with same rate & same terms & condition.
13) As these works of project works under scheme and works shall be executed in equated
monthly portion with ref. to total cost of tender failing which action shall be taken in
conformation with the prevailing rate of company.
14) Security Deposit amount will be refunded after six month from the completion of last Job
15) Rates are inclusive of PF and work contract tax or GST whichever is applicable.
16) I/We declare that I/We am/are not black listed / stop dealing in any organization.
17) DGVCL has all right reserve to black list/ stop dealing if the contractor is found defaulter/non
satisfactory work or violation of condition of contract.
18) Following documents are mandatory for physical submission along with tender at office of
Executive Engineer (O&M), Ankleshwar Rural Division, Ankleshwar only through Speed-
Signed Copy of Tender along with terms and conditions
PF Registration
ST/GST Registration Certificate
PAN Card Copy
Experience Certificate
Solvency certificate
Other related documents
You are fully agreed to and abide by to the above terms and conditions.
19) The sample of HDPE pipe shall be getting approved at concern (DIVISION level prior to commence
supply of HDPE pipe. The testing certificate & type test certificate of HDPE pipe shall be submitted at
the time of passing of bills.
20) The lot wise inspection of sample randomly selected from the lot of HDPE pipe is to be carried out at
NABL approved testing LAB/CIPET prior to supply of HDPE pipe and then work for HDPE vertical
laying/HDD work is to be executed.
21) Erection, Laying, Testing, Commissioning and satisfactory operation of the Distribution lines
are deemed to be included in the scope of the specification unless specifically excluded.
1.Bidder will have to submit inquiry in CBUD ( Call Before U Dig ) before execution of work and
will have to sent snapshot of raised inquiry to Engineer Incharge. Bidder will also carry out joint
survey with concerned underground utilities before starting HDD/Open excavation work in all
2.Excavation, Drilling and Cable laying should be done with all road safety measures such as hard
barricading, displaying “DANGER” sign and “DGVCL - Work in Progress” on it with light reflective
strips or paint.
3.Trail pit excavation and De-excavation should be done simultaneously so that any chance of
road accident can be prevented.
4. Issues regarding ROW on field should be resolved by contractor itself.
5.Testing & measuring equipment: - 5 KV Digital insulation testers, Digital Earth clamp meter for
measurement of Earthing and leakage current, Digital Rodometer with NABL accredited agency
valid test certification.
6. Depth chart should be provided at every 100 meter with mentioning landmark.
7.Partial Discharge test to be carried out on sample part of cable before charging as decided by
incharge engineer.
8.Qualified cable jointer with Minimum five years of experience required with necessary
certification regarding qualification and specific experience.
9.End termination and straight joint kit should be of premium quality .Technical specifications
for the same to be submitted along with bid.
10.Cable straight joint should be done with mid span joint instead of long barrel Lug.
11 In case of Damage to government/Utility assets due to Non-Usage of CBUD Application
before execution of any excavation/digging activity recovery and penalties must be imposed
on the contractor/agency.
Seal and Executive Engineer (O&M)
Signature of the Contractor Ankleshwar
DAKSHIN GUJARAT VIJ COMPANY LTD.
TECHNICAL & COMMERCIAL CONDITIONS OF CONTRACT FOR O/H LINE
a) The work entrusted as per the contract should be speedily executed in accordance
with the best practice & should be present neat appearance when completed. All the
works have to be carried out according to the drawing and specifications and as per
the instructions of Engineer-in-charge. There should not be any damage to DGVCL's
material or to other's property during transport or erection otherwise damages will
be at the cost of contractor & decision of the Ex.Engr. will be final.
b) Before commencing erection of lines the contractor will provide with the pole
schedule and layout map of the area, which will give one of the location marked in
the layout map. The pole, guy and earthling locations will be shown by Engineer-in-
charge. Other drawings referred to the pole schedule will be available for consultation
with the DGVCL's staff at the site or at the S/Dn. office. Cutting of tree branches
which come in the way of the line will be arranged by the DGVCL.
c) Marshy or water logged locations must be avoided as far as possible. If it becomes
inevitable to locate poles at such point, special precautions about foundations will
have to be taken and work carried out as per instructions of the Engineer-in-charge
by the contractor at the tendered rate.
d) The spans shall be as specified in the pole schedule and the minimum spacing
between the power conductors and neutral shall be as shown in approved drawing.
2. SUPPLY OF MATERIAL:
All material such as rails, RS joints, or other poles [except PSC] fabricated material,
copper aluminum, or ACSR conductor, VIR wire insulators guy wire, etc. required for
erections will be supplied at DGVCL's store at Ankleshwar. PSC poles for line supports
will be transported and stacked by the DGVCL along road side for HT/LT line and at
one place near the site of work within a range of 2kms.The line supports may be Rail,
PSC or any other type and be 28 to 36 feet in length and weight40 to 100 lbs/yds.
The conductor will be either aluminum or ACSR and vary in size from 13mm2to
30mm2 area. The conductor will be supplied in coils or in drums as per standard
packing received from suppliers. The rolls should be returned to the Store and
stacked at the directed place. For damaged or lost empty crates/drums of conductor
recovery @ Rs.125/- for each will be effected. Anti-climbing device like GI barbed
wire & Danger DGVCL should be supplied by the contractor. Lugs will be supplied by
3. POLE ERECTION:
The work includes shifting of supports particularly PSC poles from the stacking place
as mentioned in Clause No.2, to the site of actual work excavation of pit, fixing of top
insulator fitting, cross arms, clamps numbering etc. complete inclusive of painting,
fixing of danger DGVCL caution plates and fitting anti-climbing devices for double or
four pole structures Railway or River crossing or transformer structures etc. The work
further includes fixing cross arms packing, cross bracing etc., mounting of AB switch,
DO or HG type fuse units. Poles must not be erected along the edge of cutting or
embankments or where the soil is liable to be washed away Unless special precautions
are taken to ensure durable foundation when setting the pole. The pit shall be ample
size to allow easy entrance of the pole and base plate with out any damage to it.
After the pole is erected vertically the pit is to be refilled with the excavated earth
and properly rammed. The erection cost of single or double pole structures, stay sets
and pipe or plate type earthing is inclusive of excavation of pit refilling of excavated
earth and cost of coke & salt in earthing arrangement as specified. All the poles must
be in plumb, fabrication fitting on pole must be tight.
4. PAINTING AND NUMBERING:
RAIL Poles, RSJ, Steel tubular poles or all the steel mounting shall be given one coat
of approved red oxide paint and two coats of approved aluminum paint. There should
be sufficient interval between every coat of paint. The bolts and nuts shall be dipped
in anti-corrosive liquid before insertion and shall overlapping surface of steel should
be given a fine coat of red oxide paint before bolting. For the rails and RSJ/Steel
tubular poles the lower portion upto three feet above ground level shall be cleared of
rust. Where concreting is not to be done, this ground surface should be given a base
coat of red oxide and an additional coat of black bitumen paint which should extend
up to 3ft. above ground level of muffing before inserting in ground. The rest of the
surface of the rails of RSJ/Tubular pole shall be cleaned of all rust and painted with
one coat of red oxide and two finishing coats of approved aluminum paint. The paint
which should be ISI marked should be got approved by the Engineer-in-charge before
using on works and will have to be arranged by the tenderers, as painting is included
in the offer. Every pole after erections shall be numbered in bold black figures both
in English and Gujarati at a height of about 8ft. from the ground level as per
instruction of Engineer-in-charge. PSC poles need not be painted but they should be
properly cleaned and fabrication on PSC need be only painted as specified above.
5. CONCRETING/MUFFING:
The proportion of concrete mixture and the quality of the sand metal should asunder:
a) Cement concrete proportion for concreting of Rail/RSJ/Tubular steel poles should
be cement one part, sand three parts 1 ½" metal six parts [1:3:6].
b) The sand shall be clean, grippe and composed of hard, strong & durable grains, it
shall be free from clay or organic matter. If there is any trace of earthy matter, the
sand must be washed, before using sand for concreting work it should be got
approved from the Engineer-in-charge.
c) Metal should be hard and durable stone, to pass through a mesh of 1½" as far as
Possible. All metal must be perfectly clean, being washed, necessary and free from
any Sculpture. Size of metal must be got approved from the Engineer-in-charge.
d) Unless otherwise specified the concrete shall be mixed in the above proportions
and should be thoroughly mixed at least three times in a dry state before water is
added, and finally wet mixture be used. All concrete must be mixed on a water-tight
platform. In vessel any case, finished work, must be absolutely true inline and level
and finished-off smooth. One finishing coat of cement paste should be applied on
outer surface of the muffing. The concrete block must be kept wet continuously for a
period of seven days.
e) If the Engineer-in-charge of the works or the Supervisors, finds that cement
concrete is not of the quality and as specified, the same will be rejected.
f) The contractor should procure metal, and sand himself as specified above. Only
steel poles are to be muffed and the size of muffing far steel poles should be 12" dia
X 24"total height [12" below 12" above ground level] or as per instruction of
Engineer-in charge.
6. STRINGING OF CONDUCTOR:
Stringing of stranded ACSR/Aluminum/Al.Alloy conductor include the erection of
necessary HT < strain and pin insulators, jump ring& binding wire, jointing etc. The
rate quoted should be per conductor route kilometer inclusive of the above.
Appropriate tools should be used and proper scientific methods are to be applied to
protect against cuts, scratches or kinks. He should particularly follow the instructions
of Engineer-in-charge while making jumpers, joints and bindings. While executing
this work equipment& tools like turn table or draw-wise etc., should be arranged by
the contractor. For stringing of aluminum or ACSR conductor, aluminum or wooden
pulley must be used for supporting contact on poles. Generally 30-40 meter span
should be kept on HT/LT line.
7. ERECTION OF STAY SET:
The erection of stay set may be completed with stay clamp, binding of GI stay wire
at either end turn buckle, anchor plate with rod. The binding of stay wire for guy
insulator at both the end should be done properly. The stay shall be erected suitably
for local conditions. The rate should quoted for erection of complete set inclusive of
excavation of pit and refilling of earth and painting. Stay Rod pit must be as per
The earthing device shall be of the coil type or pipe type or plate type as indicated in
the pole schedule. The work of earthing must be carried out as per instructions of
Engineer-in-charge and at the places selected by the field Engineer. The coke or
charcoal powder and salt will have to be procured by the contractor should preferably
use earth auger excavation of earth pit. The contractor should satisfy himself as well
as to supervisor for satisfactory earthing by carrying out
test using earth tester. All earthing is to be covered upto 2.5mtr. [8feet] from ground
level by earthing sleeves which will be provided by the DGVCL. The earthing to be
provided in a separate pit i.e. other than that of pole. All conductors, earth wire and
stay sets must be tight.
Guard cradle will be provided below HT line/LT line. The guarding must also be
provided where railway tracks, telephone line, and licensees HT, LT lines are passing
below DGVCL's HT lines. The guarding for the above comprises of GI main bearer
wire GI lacing wire and GI binding wire etc. complete. The work has to be carried out
as per instruction of Engineer-in-charge. The cradle guard consists of 2nos. of SWG
No.8 GI wire for binding, guarding for railway crossing is to be carried out as per
instruction of the Engineer-in-charge.
10 ERECTION OF TRANSFORMER SUB-STATION:
Transformer sub-station will be of the outdoor type & will consist of the following
a) 25 to 200KVA transformer complete with its accessories.
b) One set of HT distribution type lightning arrestors.
c) One distribution box with necessary wiring.
d) The contractor should lay the cable as per instruction of Engineer-in-charge & use
crimping lugs for termination of cable as per requirement and the crimping tools to
be arrange by contractor. Pipe earthing to be provided on either side of the
transformer center providing earth wire for lightning arrestor, transformer tank and
Dist. box and two separate wires of distinct earthlings for neutral with T/c SWG-8
copper or GI wires. The rate should be quoted inclusive of painting of structure &
transportation from the DGVCL's Store to the site of erection.
Executive Engineer (O&M)
Seal & Signature of contractor Ankleshwar Rural Division.
GENERAL CONDITION OF CONTRACT:
1) DELAYED AND LATE TENDERS
No tender shall be accepted/opened in any case which are received after due date
and time of the receipt of tender irrespective of delay due to postal services or any
other reasons and company shall not assume any responsibility for late receipt of
tender. Any correspondence in this matter will not be entertained.
2) Tender fee (Non-refundable).
Tender fee (Non-refundable) plus GST as applicable notified in the tender notice should
invariably THROUGH Online NEFT/RTGS mode only ( In bank account as mentioned in
the tender notice copy of receipt must be uploaded online in pre-qualification stage)The
Tender Fees is Non-Refundable under normal circumstances. However, if purchaser
company decides to scrap/ cancel the tender, by one or another reason, in which bidders
are not responsible for cancellation/ scrap of tender, in such case tender fee may be
refunded to bidder(s), at sole discretion of the purchaser company.
Each tender must be accompanied by Earnest money equivalent to 1% of the
estimated value and it must be paid online through NEFT or RTGS mode only copy of
receipt must be attached online in prequalification stage. Earnest Money deposits
paid shall be liable to be forfeited in the event of failure accept the contract by
successful tenderers, EMD will be refundable to all unsuccessful tenderers on demand
and upon submission of original money receipt and after finalization of contract. The
successful tenderers will be eligible for refund of EMD after payment of security
4) DESCRIPTION OF WORK: As mentioned in the Schedule ‘B’.
The quantities mentioned in the accompanying Schedule are only approximate.
Actual quantities may increase or decrease according to the requirements. The
company reserves the right to revising or deleting any of the quantities actually
executed by the contractor will be calculated and paid at the rate given in contract
schedule of rates.
6) PERIOD OF CONTRACT:
The contract will remain in force for 1 Year. The contractor shall on completion of
the work, prepare and render the final detailed material account of the material
received by him from the company store within one month from the date of
completion of work. If however, the contractor does not render the material account,
Regd. A.D. Notice will be issued to the contractor to render the material account
within 10 days from the date of Notice, failing which the material account, will be
finalized and recoveries will be made as per the company’s procedure which shall
have to be accepted by the contractor and dispute if any raised shall not be
For delay in work the contractor will be liable for penalty at a rate of 1/2% per week
(7 Days a week) subject to maximum 10% of value of uncompleted work.
In case of Damage to government/Utility assets due to Non-Usage of CBUD
Application before execution of any excavation/digging activity recovery and
penalties must be imposed on the contractor/agency.
8) JURISDICTION: For any disputes the jurisdiction shall be circle office and the
decision of CEO & SE (O&M) shall be final.
9) SECURITY DEPOSIT:
The successful tenderer will have to pay security deposit equivalent of 5% of the
order value. This amount will be payable either in cash or through demand draft on
any Schedule bank drawn in favor of DGVCL. This amount will be refundable after
completion of work and/upon submission of NOC of engineer-in-charge. Order will be
issued to successful bidder after payment of security deposit.
If during 12 calendar months from the date of handing over charge after completion
of work, the erected lines are found defective in any way the same should be made
good by the contractor free of cost.
11. INDEMNITY BOND:
The contractor will have to execute an indemnity bond on stamp paper of Rs.300/-
at his cost before commencement of work stating that for any accident to the
contractor’s staff/equipment of any person or any other fatal or non-fatal due to non-
observing of safety measures, DGVCL shall not be held responsible.
12) SOLVENCY CERTIFICATE:
He shall have to produce the solvency certificate as per the company’s rules if the
order value exceed Rs.15000/-.
The contractor will also have to execute an agreement on a non-judicial stamp paper
of Rs.300, in line of acceptance of contract.
14) CONTRACTOR’S LIABILITY:
For any accident either fatal or non-fatal to the workers due to non-observance of
the safety measures and line clearance procedure, company shall not be held
15) GENERAL TERMS & CONDITION OF THE CONTRACT:
All other terms & condition as specified in tender & contract booklet of DGVCL shall
be binding to the contractor.
16) UNDERTAKING BY CONTRACTOR:
Should this tender be accepted I/We hereby agree to abide by and fulfill all the terms
and conditions/provisions of the ‘Tender’ and contract for works as applicable and in
default there of to forfeit and payable to the company the sum/s of money as may
16) INCOME TAX:
Income tax will be deducted from contractor’s bills.
GST is applicable as per the finance Act-2017 or latest revision. The registration with
government for GST is must. Otherwise it is mandatory to submit letter head on
which bidder has to clearly mention whether GST to be paid is eligible or not.
18) Goods and Service Tax (GST) :
The F.O.R. Destination prices are excluding GST and Cess as applicable which will be paid
extra on a given taxable goods and/or services within the original contractual delivery
period. The amount of GST and Cess as applicable should clearly be indicated separately.
(FST/Cess means all applicable Tax/Cess under GST Laws. GST Laws means IGST Act,
GST (Compensation to the State for Loss of Revenue) Act, CGST Act, UTGST Act and
SGSCT Act, 2017 and all related ancillary legislations).
If the Supplier/Contractor has opted for the Composition Scheme of GST, the same must
be clearly specified with valid Declaration & Certificate from department. In the event of
withdrawal/cessation of the Supplier from Composition Scheme during the tenure of the
contract, the rate mentioned in the price bid shall be final and any additional GST will
have to be borne by the tenderer. In no case additional amount towards tax or otherwise
will be paid / reimbursed to supplier/contractor. Further Statutory Variation clause will
not be applicable in case of Supplier / Contractor has opted for Composition Scheme
Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in
acceptance of tender only and any deviation in the same shall not be accepted. Further,
any additional liability of GST (later on due to wrong mentioning of GST rate, mis-
interpretation of HSN/SAC Code, etc.) over and above as charged in the invoice shall be
borne by the Supplier/ Contractor. However, any refund received by the supplier /
contractor on account of GST charged from the company; such refund shall have to be
passed on to the company, along with interest if any. Such refund along with interest
needs to be passed on suo-moto by the supplier / contractor.
In case, Govt. revised the rate of GST rate / Code during the tenure of the contract, the
provision of GUVNL’s statutory variation clause shall apply.
19) INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to
inclusion of any other additional item of their inputs / input services under the ambit of
the Input Tax Credit provisions under the GST Act, subsequent to the date of submission
of the offer, the same should be passed on to COMNPANY and you should inform such
changes to COMPANY from time to time.
20) STATUTORY VARIATION:
Any statutory increase or decrease in the taxes and duties including GST and Cess as
applicable or in the event of introduction of new tax/cess or cessation of existing tax/cess
subsequent to suppliers offer if it takes place within the original contractual delivery date
will be to COMPANY’s account subject to the claim being supported by documentary
evidence. However, if any decrease takes place after the contractual delivery date, the
advantage will have to be passed on to company.
Statutory Variation clause shall not be applicable in case of Supplier / Contractor has
opted for Composition Scheme under GST.
21) PRICE EVALUATION:
No price preference shall be given on any account. All Tenders shall be evaluated on firm
price End Cost (with GST and Cess as applicable) basis unless otherwise mentioned in
the Tender documents.
If the Tender is invited with Total Owning Cost (TOC) clause, the evaluation shall be done
accordingly. For the same, the Bidders have to give the detailed breakup of the End Cost.
The SOR rates shown under schedule- B are excluding of GST in case of erection
of HT/ LT line & T/C work, whereas in case of underground cable work, the SOR
rates under schedule-B are inclusive of GST.
The terms and conditions stated above are carefully read by me/us and are
acceptable to me/us.
1. Successful bidder shall submit monthly report for work executed by them
giving details of Name of s/s, Name of feeder, type of kit used ,date of
providing kit, sub orderno.etc. utilized by them to The E.E (O&M), DGVCL,
Rural Dn, Ankleshwar.
2. Proprietor/Partner /Director of bidder/firms not stop deal/Show cause/banned
for business dealing and /or black listed by GUVNL and / or their any
subsidiary company Viz. MGVCL/PGVCL/UGVCL/GSECL/ GETCO/DGVCL.
If found during Tender procedure DGVCL has rights to disqualify/reject at any
stage of tender.
If the Supplier/Contractor has opted for the composition scheme of GST, the same must
be clearly specified with valid Declaration & self-certified Certificate from Department. In
the event of withdrawal/cessation of the Supplier from composition scheme during the
tenure of the contract, the rate (i.e. price) mentioned in the price bid shall be final and
any additional GST will have to be borne by the tenderer himself. In no case additional
amount towards GST or otherwise will be paid / reimbursed to supplier/contractor.
Further statutory variation clause will not be applicable in case of Supplier/Contractor has
opted for Composition Scheme under GST.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as
applicable for each item of Goods/Service. If not specifically mentioned then COMPANY
will have the option to take the prices as exclusive of taxes and duties at maximum higher
slab rates for the evaluation of the tenders.
The Tenderer should invariably indicate the total unit end cost price considering all their
costs / calculations in the Price bid itself for each item and all sub-items if any. This is a
must. Cost components hidden / furnished elsewhere will not be considered and will be
ignored out rightly.
Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the bidder
intends to supply the goods / services, meaning there by the bidder has to supply the
goods / services from the relevant declared / registered place of supply only.
Executive Engineer (O&M)
AnkleshwarRural
Signature of contractor
SPECIAL TERMS AND CONDITIONS OF CONTRACT
1. For any damage to the equipment or persons working for the job, DGVCL will not
be responsible for the same.
2. The contractor should fulfill the conditions of contract of Labor Regulations and
Abolition Act 1970 and will have to furnish records failing which payment will not be made.
The contractor should specify License No. Contractor should possess the GST& should also
intimate PF Code No. & contractor are also bound to fulfill all the conditions as per the provision
of EPF and MP Act 1952 & Schemes framed the render otherwise Tender will be liable
for termination.
3. Any liabilities arising in connection with GST will be of contractor.
4. The rates are asked for only on percentage basis against estimated amount i.e. item wise rates
stated in the Schedule ‘B’ The tender offer must be specify the percentage either above or
below to the estimated amount. And it should be clearly specified both in figures and words.
5. No conditional offer will be accepted in any circumstances.
6. The contractor should sign all the tender documents wherever necessary, failing which the
offer is liable to be ignored.
7. In case of any mistake, in writing the percentage offer between the figures and words, the
DGVCL will consider the most beneficial at its discretion and that will be binding to the
8. In case of any mistake, in writing the derived net amount of the offer, the actual calculation
as per percentage offer of the tenderer will be taken in to consideration of comparison and
shall be binding to the contractor.
9. The rates so accepted will be applicable, during the contract and no any price variation will be
considered during contract period.
10.The percentage rate offer must be offered in our tender documents only. These should not
be any overwriting. If any correction must be made initial with signature of the tenderer.
11. The tenderer should not change the estimated rate.
12. The Tender documents where signed must be affixed with Rubber-stamp of
Firm/Company/Individual with address.
13. In case of any ambiguity, discrepancy or dispute the decision of Executive Engineer(O&M)
Ankleshwar Rural Division DGVCL will be final and shall be binding to the tenderer.
14. Against the approved rate contract engineer-in-charge will issue detailed work order T.S.wise
during the validity period of contract. The actual quantity may vary according to the quantum
of work to be executed during contract period.
15. Wherever, there is an excess work carried out by the contractor, beyond the Technically
sanctioned amount against the work order, approval for the excess quantity of work done
should be obtained from the competent authority as per DGVCL’s rules.
16. The work will be carried out as per program laid by the DGVCL and the DGVCL and the
contractor should thoroughly supervise the execution of work throughout by being present
on the work site throughout.
17. No tools will be supplied by the DGVCL and the contractor should make his own
Arrangement to get adequate quantities of all tools in order to complete the job within the
prescribed period.
18. The contractor shall be responsible for breakage, loss or theft of material during transit or
erection, issued to him from stores, till the time the work is handed over and taken over
19. Starting of works and completion period: The erection work should be commenced
within seven days from the date specified in the offer to commence work, issued by the
Deputy Engineer (O&M) and should be completed within the prescribed period for each work.
20. Bills be prepared once month looking to the progress of the work and payment will be made
A] Running bill may be paid on the progress of work carried out and measurement recorded
up to 80% on submission of material account.
B] Final bills for contracts will be paid after completion of works &recording measurements
submitting material Account. If contractor proceed further and finalize the bill.
21. No material of the DGVCL should be left on the line without supervision.
22. For stringing of aluminum or ACSR conductor, aluminum or wooden pulley must be used for
supporting contact on poles.
23. All conductors, earth wire & stay sets must be tight.
24. All the poles must be in plumb.
25. Fabrication fittings on poles must be light and painted.
26. Stay Rod pit must be as per instruction.
27. Generally 30-40mtr. Span should be kept on HT/LT line.
28. All road crossings must be provided with guarding arrangement and minimum 22 feet
clearance must be kept between conductor and road level.
29.Contractor must get the requisition, three days well in advance before they require the material
on site, from Engineer-in-charge.
30.The payment to the contractor through RA bill be to the extent of 100% of the value of the
work done provided the contractor furnishes the material account in respect of the previous
RA bill before the next RA bill is paid. If this is not complied with by the contractor the
payment through RA bill shall be made only to extent of 80% of the total value of the work
done, the amount so withheld will be released on furnishing by the contractor the material
account of the relative RA bill.
31.The contractor shall on completion of work prepare RA bill and render the final detailed
material account of the material received by him from the DGVCL’s store within one month
from the date of completion of work. If however, the contractor does not render the material
account, a Regd. A.D. Notice will be issued to the contractor to render the material account,
within 10 days from the date of Notice, failing which the material account will be finalized
and recoveries made as per the DGVCL’s account which shall have to be accepted by the
contractor and disputes if any raised shall not be entertained.
32. The contractor is bound to complete the work within the specified period from each, work
given by the Engineer-in-charge.
33. Priority of works would be decided by the engineer in charge and the contractor shall carry
out the work within stipulated time for order issued by Engineer in charge.
34. The contractor must have adequate resources and gang of unskilled & skilled personnel to
undertake the work at the different places.
35. For rate contracts, the contractor will be given separate order for each work on the basis of
the rate contract order. The date of commencement and date of completion of work will be
stipulated in order which the contractor has to agree otherwise the penalty will be levy able
for late completion of work as per DGVCL’s standard conditions.
36. The contractor will be governed by the following clauses and to be signed by him:
a) Should this tender be accepted I/We hereby agree to fulfill all terms and provisions of the
Tender & Contract for works as applicable and in default thereof to forfeit and pay to the
DGVCL the sum/s of money as may become due.
b) The full value of the ‘Earnest Money Deposit’ paid herewith shall be absolutely forfeited to the
DGVCL should I/WE not deposit the full amount of specified Security Deposit in time.
c) The competent authority will delete any item in Schedule ‘B’ in the Tender.
d) The contractor will have, to produce a solvency certificate before commencement of work.
e) For any accident either fatal or non-fatal to the workers due to non-observance of safety
measures & line clearance DGVCL shall not be responsible.
f) Any loss sustained due to this will have to be borne by the contractor.
g)Contractor has to provide separate PF Code No. from the RPFO for their employee/s it is to be
ensured that any contractor who do not posses separate PF code should not considered for
acceptance of tender.
h) Contractor shall pay minimum wages to each laborer as per the minimum wages act 1948and
rules therein, as applicable from time to time in pursuance to the Govt. Notification and
compensation Act applicable Workmen Compensation Act.
i) Contractor will have to carry out works in any area of Ankleshwar Rural [O&M] Division if need
be as per the instruction of Executive Engineer (O&M) Ankleshwar Rural Division.
j) Executive Engineer (O&M) Ankleshwar Rural Division can discontinue contract at any time with
out assigning any reasons/can take, further actions as per DGVCL’s rules against the
k) All RSJ poles should be painted, concreted and muffing done as per DGVCL norms.
Work contractor should complete geo-mapping of new infrastructure erected by
him before submission of respective bill.
The above conditions are applicable to this tender in addition to the specifications mentioned in
the Tender and Contract Booklet of DGVCL.
Executive Engineer (O&M)
Ankleshwar Rural Division
Signature of contractor
Seal with Address of the Firm[Rubber Stamp]
In connection with the above subject and reference I/ We confirm the following:
5. I / We, the under signed have read and examined the Tender Specifications in tender
mentioned under reference along with the Commercial terms and conditions.
6. I / We, declare that our Technical Bid is strictly in line with the Tender specifications
(except the deviations shown in Annexure of Technical Deviations as per clause no.22 of
this tender document).
7. I / We also agree that additional conditions that I/We (proprietor/Partner /Director) of
bidder/firms not stop deal/Show cause/banned for business dealing and /or black listed
by GUVNL and / or their any subsidiary company Viz. MGVCL/PGVCL/UGVCL/GSECL/
GETCO/DGVCL. If found during procedure DGVCL has rights to disqualify at any stage of
8. Further, I / We also agree that additional conditions / deviations, if any, found in the
Commercial terms & conditions (except reference under clause no.22 of this tender
document), our offer shall be out rightly rejected without assigning any reason thereof.
9. If in any Bidder company/firm, the interest (i.e. Shareholding in company and share in
partnership firm) of any employee of the tendering company or his/her relative as defined
in section 2(77) of the company’s Act.2013 is 10% or more, the tendering company will
not deal with such company/firm at all.
Ex. Engr. (O&M)
Contractor Ankleshwar
DAKSHIN GUJARAT VIJ COMPANY LTD.
O & M DIVISION ANKLESHWAR
TERMS & CONDITION
22) DE will give the programme to the contractor under intimation to the Division Office, with
the details of work under each item with quantity feeder wise and location wise and
accordingly on receipt of such intimation the contractor shall have to start the work within
10 days, failing which the particular work shall have to be got completed by the DE
concerned through sources at the cost and risk of the contractor. The expenditure incurred
in excess in such cases, then the tendered rates shall have to be recovered from the amount
due to the contractor.
23) According to the contractor, if he feels more erecting work than actually intimated to him by
the DE concerned through sub-work order he should not carry out such work at his own
accord but he should point out the same to the DE and only if he agrees to the same and
issued supplementary sub-work order, than only such work should be carried out. For the
work carried out without such sub-work order will not be paid to the contractor.
24) The contractor should prepare a detailed list of work carried out by him location wise as per
sub-work order and he should obtain the signature there on of the DE OR JE of the S/dn
and the same should be presented to the DE for preparation of bill.
25) Whenever any material is required to be replaced the contractor shall be given such material
from the sub-division office and for the same he will have to rend full account to the S.D.O.
similarly any broken or scrap material gathered from such work should be credited to sub-
division office. If no such old scrap material is available on line, he should obtain clear
certificate to that effect from the DE OR JE concerned.
26) What so ever material is required to be use by the contractor as per schedule of the tender,
he will have to bring the same to the notice of the DE OR JE and the same should be utilized
as per there instruction, only when such materials are approved by them.
27) For Tools, Tackles, Hand Carts etc. the contractors shall to make their own arrangement.
28) The contractor should obtain insurance policy in respect of his lab ours towards accident risk
and the Xerox copy there of may should be produced to the Division Office along with the
contract documents executed.
29) Before starting the work on any line the contractor shall have to obtain shut down on that
line through the DE/JE concerned and regarding the shut down obtained he should get such
shut down order. If the contractor fails to obtain such order from the DE/JE concerned,
them in cases of any event of accident or otherwise, the contractor will be only responsible.
30) Carryout the work as per R.E. norms.
31) The painting works to the fabricated material is must.
32) The numbering work is must.
33) As these works are under TASP scheme and to be executed in specified time limit therefore
time limit of work shall be four months and works shall be executed in equated monthly
portion with ref. to total cost of tender failing which action shall be taken in conformation
with the prevailing rules of the company.
34) You will have carry out the work any S/Dn. office under control of Ankleshwar (O&M)
Division if required with same rates & same terms & conditions.
35) Security deposit amount will be refunded after six months from the completion of last job
36) Rates are inclusive of PF and work contract tax exclusive of GST whichever is applicable.
37) I/We declare that I/We am/are not black listed / stop dealing in any organization
38) DGVCL all rights reserve to black list/stop dealing if the contractor is found defaulter/non
satisfactory work or violation of conditions of contract.
39) It is mandatory for all bidders to submit their tenders documents by both forms of oneline
(e-tendering) and physical in schedule time. If tender is submitted in any form, i.e. either
by online OR physically, the bid shall not be considered.
40) Following documents are mandatory for physical submission alongwith tender at office of
executive Engineer (O&M), Ankleshwar Rural Division, Ankleshwar only through Speed-
Signed copy of tender along with terms and conditions.
PF Registration
GST Registration copy
PAN card copy
Experience Certificate
Solvency certificate
Other related documents.
You are fully agree to and abide by to the above terms and conditions.
Seal and Executive Engineer (O&M)
Signature of the Contractor Ankleshwar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER E -24(2026-27)F.pdf
SCH B E-24 (2026-27) FOR UG AND FAULT FINDING.pdf
E NOTICE E-24.pdf
TENDER NOTIOCE MASTER E-24.pdf
Corrigendum-1_REVISE SCHEDULE B and DESCRIPTION OF WORK.pdf
CORRIGENDUM
Revise Tender copy E-24(2026-27).pdf
CORRIGENDUM
REVISE SCH B FOR UG AND FAULT FINDING.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].