| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35,654Accepted-AOC | ₹35,654 Quoted ₹2.0 Cr | L1 | Accepted-AOC AGMT |
| 2 | L2₹2.1 Cr+₹2.5 L (1.21%)Rejected-Finance | ₹2.1 Cr+₹2.5 L (1.21%) | L2 | Rejected-Finance Project dropped |
| 3 | Rejected-Technical | - | - | Rejected-Technical L6 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 5 | Rejected-Technical 7513 SL NO 0881 AMB 23 250 | WARDHA | MAHARASHTRA | 442001 | - | - | Rejected-Technical L5 |
| Sl No | Description | Qty | Unit | A. VIJAYAN L6 | L.SELVAN L5 | N A NAJEEB L3 | C B G Thilakan L1 | ANIYAN G S L4 | K. SUNIL DUTH L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00RCC NALLAH BOX CONSTRUCTION AND PLACING | |||||||||
| 1.00 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 576 | cum | 173.72 ₹1,00,062.72 | 167.8 ₹96,650.58 | 162.77 ₹93,755.52 | 159.21 ₹91,707.48 Lowest | 165.03 ₹95,059.58 | 161.04 ₹92,758.12 |
| 1.00 | 15.60 : Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 576 | cum | 166.27 ₹95,771.52 | 160.6 ₹92,505.71 | 155.79 ₹89,737.34 | 155.5 ₹89,569.47 | 157.96 ₹90,982.94 | 154.13 ₹88,780.2 Lowest |
| 1.00 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 95.04 | cum | 6,176.71 ₹5,87,034.52 | 5,966.08 ₹5,67,016.64 | 5,787.58 ₹5,50,051.34 | 5,660.95 ₹5,38,017.14 Lowest | 5,867.87 ₹5,57,682.79 | 5,725.81 ₹5,44,180.98 |
| 1.00 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 6,589.44 | sqm | 267.52 ₹17,62,806.99 | 258.4 ₹17,02,695.27 | 250.67 ₹16,51,748.57 | 245.18 ₹16,15,612.61 Lowest | 254.14 ₹16,74,666.64 | 247.99 ₹16,34,121.82 |
| 1.00 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 91,660.8 | kilogram | 78.07 ₹71,55,958.66 | 75.41 ₹69,11,940.47 | 73.15 ₹67,05,125.01 | 71.55 ₹65,58,436.11 Lowest | 74.17 ₹67,98,160.72 | 72.37 ₹66,33,565.42 |
| 1.01 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 1,366.43 | cum | 8,572.83 ₹1,17,14,197.82 | 8,280.5 ₹1,13,14,743.67 | 8,032.74 ₹1,09,76,203.34 | 7,857 ₹1,07,36,062.3 Lowest | 8,144.19 ₹1,11,28,487.92 | 7,947.01 ₹1,08,59,060.81 |
| 1.01 | od934716/2020_2021 : C.I. Manhole cover with frame ( heavy duty ) 560 mm internal diameter, total weight of cover and frame to be not less than 208 kg ( weight of cover 108 kg and weight of frame 100 kg)<br> | 10 | each | 14,530.91 ₹1,45,309.1 | 14,035.41 ₹1,40,354.06 | 13,615.46 ₹1,36,154.63 | 13,317.58 ₹1,33,175.79 Lowest | 13,804.36 ₹1,38,043.64 | 13,470.15 ₹1,34,701.5 |
| 1.01 | 50.18.9.6.2 : Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 50 mm dia 6 Kgf/cm2 | 307.2 | metre | 189.88 ₹58,331.14 | 183.41 ₹56,342.04 | 177.92 ₹54,656.26 | 174.03 ₹53,460.49 Lowest | 180.39 ₹55,414.58 | 176.02 ₹54,072.98 |
| 1.01 | od929182/2020_2021 : Placing RCC Boxes in Amayizhanjan thodu from the place of casting.(including crane hire) | 20 | Day | 16,730.28 ₹3,34,605.6 | 16,159.78 ₹3,23,195.55 | 15,676.27 ₹3,13,525.47 | 15,333.3 ₹3,06,666.03 Lowest | 15,893.77 ₹3,17,875.32 | 15,508.97 ₹3,10,179.4 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
11 Nov 2020, 5:00 pmClosed
Executive Engineer
Thiruvananthapuram Corporation 695033
755-20-21 Amayizhanjan thodu Slab ettu moodi Gathagatha yogyamakkal
2020_LSGD_397355_1
EE(C)/TENDER/2020-21(12)
Open Tender
Civil Works - Others
Item Rate
180 days
Thiruvananthapuram Corporation
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,500
Yes
₹50,000
Yes
24 Oct 2025
3 Nov 2020
13 Nov 2020
3 Nov 2020
11 Nov 2020
3 Nov 2020
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_565468.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .