Loading…
Loading…
Tender Value
₹4.3 L
EMD Value
₹4,320
Closing Date
8 Sept 2026, 6:00 pm
Executive Engineer, P. H. Works Division, Tharad
Bypass Arrangement for Benap & Benap Dhoriyo SHW Group Villages & Connection work for boosting to kanothi SHW from Bhatasana SHW of BK-4 Ph 2A RWSS. Ta. Suigam Dist:- Vav-Tharad. Under, M & R to BK-4 Ph 2A RWSS-2026-27
338336
07/2026-27
Open
Civil Works - Water Works
Works
Banaskantha
3 documents required · 3 mandatory
₹600
Executive Engineer, P. H. Works Division, Tharad
₹4,320
25 Aug 2026
25 Aug 2026
25 Aug 2026
8 Sept 2026
25 Aug 2026
Estimated Cost : Rs.
Executive Engineer
Gujarat Water Supply & Sewerage Board
Public Health Works Division
Tharad-385565, Gujarat
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
Bid Documents for Design, Build & Operate Contract for
BREAK UP FOR INTERIM PAYMENTS .................................................
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
Name of Work:- Bypass Arrangement for Benap & Benap Dhoriyo SHW Group
Villages & Connection work for boosting to kanothi SHW from Bhatasana SHW of
BK-4 Ph 2A RWSS. Ta. Suigam Dist:- Vav-Tharad. Under, M & R to BK-4 Ph 2A
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
(1) The rates and prices shall be submitted in the electronic formats given by n-
procure which is called Schedule-B. Rates and prices received in any other
formats will be rejected and the Bids will be disqualified.
(2) It will be entirely at the discretion of the Employer to accept or reject the
bidder’s proposal, without giving any reasons whatsoever and the bidder shall
not be permitted to withdraw his bid on this account.
be free supplied from the by client.
(4) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit
rate as called for against the BOQ item.
in Schedule-B only will be considered for price evaluation & shall form a part of
the Contract Agreement.
and evaluation.
(7) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C.
Bidder shall give year wise break up of cost for 5 years O&M in Schedule-C/1 to
Schedule-C/5 separately for Schedule-C. The total shall be in line to the price
quoted in Schedule-C. The total shall be carried forward to Schedule-B for
comparison and evaluation.
(8) Wherever for a particular item the quantities have been specified payment
shall be on unit rate basis and unit variation in quantity will be paid with pro
(9) Each item is to be individually priced online and the amounts shall be added up
prices shall be left blank except where the item description requires the item
to be priced on "as applicable” basis. The item shall not be priced if it is “not
applicable” to the bidder’s design, in which case the bidder shall add the
words “NOT APPLICABLE”. The wording in the item description is for subject
matter guidance only; clause references are indicative only and all other
relevant clauses shall also be referred to. The prices shall allow for all the
works covered under the bid and all liabilities and contractual obligations
whether separately specified or not. Items against which no prices are quoted
shall not be separately paid for and the bidder shall be deemed to have
covered the cost of execution of such items (according to the requirements of
the bid document) in the prices quoted for other items.
for satisfactory working/safety of the system as specified, will not be
separately paid for by the Employer when executed and shall be deemed to be
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
already covered by other items and rates listed in the price sheets No extra
payment shall be given for any item which is required to complete and perform
fixed, during the pendency of the Contract. In case of any discrepancy noted in
carried over and arithmetic corrections if any will be considered for financial
evaluation of the bid.
(12) Schedule ‘D gives the basis of interim payment for construction of works.
(13) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for construction including temporary bunds, diverting water,
pumping, de-watering etc. for the proper execution of works. The rates shall
also be deemed to include any works and setting out that may be required to
be carried out for laying out of all the works involved.
(14) Prices shall be filled online only.
Contract, the Specifications and other sections of these bid documents and
these documents are to be taken as mutually explanatory of one another.
(16) The bidder shall interpret the data furnished and carry out any additional
survey work, or investigation work required at his own cost.
(17) The prices quoted shall also include the cost of materials utilized for testing.
(18) The bidder should acquaint himself with the site conditions including the
access to Work site. The successful bidder shall have to make suitable access
to work sites at his own cost. These accesses will be used by the other
contractors working for GWSSB.
and the prices shall include all the equipments / materials / accessories and
services required as per the specifications. The bidder shall fill in the price
schedule furnished.
(20) The amount to be quoted for O & M / year shall be as per Volume-IB, General
Conditions of Contract, Clause No. 1, Security Deposit.
(21) 1% of the value of work will be deducted from the Running bill against labour
cess which is non refundable.
(22) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of
the same will be borne by GWSSB.
(23) Any expenditure incurred by inspection/ CSC agency for the work misinformed
by the contractor and charges of inspection/ CSC agency without any work due
to misinformation shall be recovered from the contractor.
(24) The rates to be quoted by the Contractor must be exclusive of GST but inclusive of
all other taxes. GST should be paid extra on the admissible payment as per the
approved tender rates and condition of price variation; GST should be paid as per
prevailing rates at the time of payment. The TDS as per provision of IT rules and
(25) The rates to be quoted by the Contractor must be exclusive of GST but inclusive of
all other taxes as per Volume-I (B) General Condition of Contract, Clouse No.
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
(26) The rates quoted shall be inclusive of all taxes, duties and GST, which shall not
be paid extra. The TDS shall be deducted at source as per provision of IT rules
and GWSSB policy.
(27) The Bidders shall have to quote the rates in this tender keeping in view of the
GST. The Complete responsibility of taxes, duties, levies rests with the
Contractor/Agency only.
(28) The process requires that the bidder shall quote his price for the work
shall remain firm and fix during the entire period of performance of the
contract except price variation allowed for supply of MS pipe as per Volume-IB
Clause No. 59, General Conditions of Contract.
(29) Payment shall be made for the components for which lump sump prices are
quoted, as per the schedule of payment. Total cost will be worked out on the
basis of work done of individual items and rates quoted against those particular
(30) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified in
the Narmada Water Resources, Water Supply & Kalpsar Dept. Resolution No.
GEN-2010-595- (6)- M.I. Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy
enclosed) and shall be recovered from the running bills of the work from time
to time and remaining amount if any shall be recovered from the final bill
before releasing the security deposit of the work. The contractor shall furnish
the statement showing the quantity of quarried materials / minerals from
whom purchased (with full address of the seller) and copies of the bills for
purchase to the Executive Engineer of the in charge of the work. The
contractor shall also furnish such additional information as regards royalty
payment to the competent authority.
(31) Agency shall have to take Insurance policy and intimate to GWSSB along with
the evidence within time limit. In case of non compliance entire responsibility
shall be rest with the agency and required amount shall be recovered from any
due amount of the agency.
(32) GWSSB can recover penalty amount from the agency for not taking the
insurance. Though the penalty amount is recovered, responsibility of the
agency for taking insurance shall be continued and will not be escaped from
the responsibility.
(33) Payment should be made after fund released by GWSSB.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: Bypass Arrangement for Benap & Benap Dhoriyo SHW Group Villages &
Connection work for boosting to kanothi SHW from Bhatasana SHW of BK-4 Ph 2A
RWSS. Ta. Suigam Dist:- Vav-Tharad. Under, M & R to BK-4 Ph 2A RWSS-2026-27
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of
the above Contract, we the undersigned offer to design, Engineer, procure,
construct, complete, commission, operate and maintain the whole of the said works
for 5 years from the date of commissioning including defects liability period as given
in Conditions of Contract and in conformity with the drawings, conditions of
Documents, including Addenda Nos.__________ (insert numbers) for Lump sum fixed
price of Rs._________________.
Rupees_____________________________________________) for Construction
including free trial run for three months or such other sum as may be ascertained in
accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any
other person/Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved
by the Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take any
action including termination of Contract and impose at his absolute discretion any
penalties, and/or reject the work.
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within _________ months, inclusive of monsoons,
from the date or receipt of Letter of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 90 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at
any time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but
until such agreement is prepared this Bid together with your written acceptance
thereof shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and
of value specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages likely
to be suffered by you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
Name of Work : Bypass Arrangement for Benap & Benap Dhoriyo SHW Group Villages &
Connection work for boosting to kanothi SHW from Bhatasana SHW of BK-4 Ph 2A RWSS. Ta.
Suigam Dist:- Vav-Tharad. Under, M & R to BK-4 Ph 2A RWSS-2026-27
The bidder shall quote his firm and fixed price for the entire work under this Contract, defined
in more details in various sections of this bid document.
Schedule showing the approximately quantity of materials to be supplied to the contractor
and at the government store for the or to be executed by contractor and rate which way
are to be charge.
Sr. material to Departmental Place of
Particular Quantity
No. be charge Issue Rate Delivery
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled in by
the Engineer in Charge at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his own
cost for loading, unloading, and transporting safety to the site of work the stipulated in
3. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in position
shall be provided at his own cost.
4. All the materials required for the items other than labour in Schedule-A but available with
the dept. will be issued on request to the contractor. (for use in this contract only) at
prevailing market rates or departmental issue rates whichever is higher.
5. All the surplus materials supplied by the dept. As mentioned in schedule-A should be handed
over to the Department by the contractor at the Govt. stores as directed.
6. The materials mentioned in schedule-A shall have to be checked for their correctness and
soundness by the contractor before taking the delivery of the materials from the
7. Necessary cement will be purchased by the agency at their own cost from open market.
8. The persons of firm submitting the Tender should see that rates in the above schedule are
filled up by the Executive Engineer, on the issue of form prior to the submission of the
9. Carting of above materials should be done by contractor at his own cost.
10. Contractor should return the balance materials in good and acceptable condition, otherwise
recovery at the double rates will be affected in view of Clause 12.4.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
Name of Work : Bypass Arrangement for Benap & Benap Dhoriyo SHW Group Villages &
Connection work for boosting to kanothi SHW from Bhatasana SHW of BK-4 Ph 2A RWSS. Ta.
Suigam Dist:- Vav-Tharad. Under, M & R to BK-4 Ph 2A RWSS-2026-27
Qty. Unit Item Description Rate Per
Manufacture, Supply & Delivery of Electric
Resistance Welded (Upto400mm)/Submerged
Arc Welded (Above400mm) M.S.Pipe having
be veled ends plate or coil conformingtoIS-
3589-2001or its latest revision/amendment for
following thickness outside diameter at
GWSSB store or site anywhere in Gujarat
State including all taxes, insurance,
transportation, freight charges, octroi,
inspection charges, loading, unloading
conveyance to Departmental stores, stacking
etc.all complete. (Rate for MS Pipe based on
the ex.works price of HR Coil as Rs.58500 per
MT without GST (Above 3.15 mmto10mm) &
Rs. 59000.00 per MT (Above10mm) without
GST as on Jan-2023. (WPI Index of H.R Coil of
48.00 Rmt 355.6 MS Pipe 5.6 mm thick. 3416.00 Rmt
Providing and supplying ISI mark G. I. pipes
with Couplings of following class and diameter
including all taxes,
insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking
etc. complete. (IS -1239) (Not for well/tube well
9.00 Rmt (a) 100 mm dia GI pipe. (Heavy Duty) 992.00 Rmt
33.00 Rmt (b) 150 mm dia GI pipe. (Heavy Duty) 1470.00 Rmt
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
Providing and supplying ISI mark CI D/F Sluice
Valves as per IS:14846 (Latest Edition) of
following class and diameter including all taxes,
insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking
etc. complete. Sluice valves with ISI mark only.
(a) 100 mm Dia , PN-1.6 With hand wheel /
Cap operated (PD type short body)
(b) 150 mm Dia , PN-1.6 With hand wheel /
Cap operated (PD type short body)
(c) 350 mm Dia , PN-1.6 With hand wheel /
Cap operated (PD type short body)
Providing and supplying ISI mark Cl D/F Reflex
Valves as per 1S:5312 (Latest Edition) of
following class and diameter including all taxes,
insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking
etc. complete. (1) Reflex Valves PN 1.6 IS
5312 with ISI mark
(a) 150 mm Dia , PN-1.6 for Delivery line at
Providing & Supplying C.I. Air valves of
approved make & quality of following class and
diameter including all taxes, insurance,
transportation charges, loading, unloading,
conveyance to departmental stores, stacking
25 mm dia. S/A (S1) type on Delivery pipe of
M. S. Specials flanged ends
150.00 Kg Up to 300 mm. dia. 98.00 Kg
150.00 Kg above 300 mm. dia. 98.00 Kg
Lowering, laying, Jointing & welding in position
to correct line & level M.S.Pipe with outer
gunniting & inside lining /Epoxy painting on
pedestal or chairs upon prepared formation or
prepared bedding in trenches the rates include
conveyance from store to site of work loading,
unloading, joint plastering, hydrotesting
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
48.00 RMT 355.6 MS Pipe 5.6 mm thick. 328.00 RMT
Lowering, laying and jointing G. I. pipes with G.
I. specials of following diameters in proper
position, grade and alignment as directed by
Engineer-in-charge including conveyance from
stores to site of work, labour, giving hydraulic
testing, etc. comple.
9.00 RMT (a) 100 mm dia GI pipe. (Heavy Duty) 34.85 RMT
33.00 RMT (b) 150 mm dia GI pipe. (Heavy Duty) 50.23 RMT
Lowering, laying and jointing in position
following C. I. / D/F Reflux valves, Butterfly
valves, Sluice valves and Air valves including
cost of all labour, jointing material, including nut
bolts and giving satisfactory hydraulic testing,
(a) 100 mm Dia S.V , PN-1.6 With hand wheel
/ Cap operated (PD type short body)
(b) 150 mm Dia S.V , PN-1.6 With hand wheel
/ Cap operated (PD type short body)
(c) 350 mm Dia S.V, PN-1.6 With hand wheel /
Cap operated (PD type short body)
(d) 150 mm Dia R.V , PN-1.6 for Suigam Line
2.00 No € 25 mm dia. S/A A.V (S1) type 57.40 No
Gas cutting (Either square cut or V cut) pipes,
plates etc. including all costs for the followng
2.81 Rmt Above 5 mm up to 10 mm 57.40 Rmt
Welding in all positions with required number
runs, for M.S.Pipes internally and/or externally
including gauging wherever necessary, fixing
appurtenances and other accessories in
connection with pipe laying work as per
2.81 Rmt Welding for Pipe thickness 4 mm to 7mm 698.03 Rmt
Labour charges for installation of Air Riser
(flange pipe) on the pipeline at suitable place
as per design & directed by Engineer-in charge
including G.I. Pipe The length of pipe is
2.00 No € 25 mm dia. S/A A.V (S1) type 417.18 No
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
Providing and casting in situ C.C. in grade M-
20 (porportions as per mixdesign or as per
table9 of IS456 2000 in masses by weigh
batching) using granite, quartzite trap metal of
size 6 mm to 20 mm for RCC work, including
3.9500 Cum scaffolding centering, formwork, needle 5520.00 Cum
vibrated consolidation, curing complete up to
meter depth or height (excluding cost of
reinforcement and neat finishing) with centering
and shuttering etc. complete for structure other
than water retaining.
Making job connection for old pipes in
connecting the pipeline with existing main &
inserted of specials incl. cost of excavation,
15.00 Job cutting of pipes, dewatering, testing etc. 1000.00 Job
complete incl. all jointing materials etc.
complete. (excluding cost of specials pipe &
fitting) Job work.
I/We am/are willing to carry out the work at ____________________ % (Shoud be
written in figures and words) Above/Below the estimated rate mentioned above
amount of my/our tender work out as under.
Estimated Cost Put to Tender Estimate Cost Put to Tender
Above:- Below:-
Add Rs.:- Deduct Rs.:-
Net Rs.:- Net Rs.:-
In Word Rs.:- In Word Rs.:-
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
1. As mentioned in the conditions of Contract, the Contract being a lump sum type
turnkey Contract on EPC basis, the provision of measurement will be applicable only
for the assessment of value of the work done for inclusion in any interim certificate for
part payment to the Contractor.
2. The Schedule specifies the procedure for all such assessment of the items specified in
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph
4. Percentages are indicated against each component of each items specified in
Schedule B, based on the Employer's best appreciation of the value of the component
as related to the total costs of the concerned item as whole. A head titled (any other
item(s)) is included in each breakdown of schedule and the tenderer shall at the time of
tendering indicate any additional items which he considers necessary but cannot be
covered by any of the heads indicated in the breakup.
5. The percentage breakup as indicated in the Schedule may differ from that
corresponding to the tenderer's scheme and design and he should take this into
account while quoting his lump sum prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities to all major items, to be reviewed
and updated periodically with the Employer's Representative. This bill of quantities will
be used for assessment of percentage progress of the component at any stage. By
measurement jointly taken by the Employer's Representative and the Contractor,
mutually agreed and entered in the measurement books in the form and by the method
approved by the Employer's Representative, and signed jointly by both the parties.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL & ELECTRICALWORKS)
Item Description of Items Percentage Payment to
a. On receipt of materials at project site 65 % of Quoted rate
b. Excavation, Lowering, laying and jointing 20 % of Quoted rate
c. Non-Destructive test and Destructive test of
5 % of Quoted rate
field joints etc. (RT/UT/PIUT)
d. On hydraulic testing and refilling and disposal
5 % of Quoted rate
e. After commissioning 5 % of Quoted rate
1B PIPELINE-GI Pipe
a. On receipt of materials at project site 70 % of Quoted rate
b. Excavation, Lowering, laying and jointing 20 % of Quoted rate
c. On hydraulic testing and refilling and disposal
5 % of Quoted rate
d. After commissioning 5 % of Quoted rate
a. On receipt of materials on site 70 % of Quoted rate
b. On erection 20 % of Quoted rate
c. On Hydraulic testing 5 % of Quoted rate
d. After commissioning 5 % of Quoted rate
3 PUMPING STATION / STAFF QUARTERS / PANEL
a. On approval of Designs 2.0 % of Quoted rate
b. On completion of Excavation & base slab 18.0 % of Quoted rate
c. On completion of vertical wall up to plinth (incl.
20.0 % of Quoted rate
Screen chamber)
d. Full supporting structure incl. ring beam and top
15.0 % of Quoted rate
e. On completion of pump house incl. fixing doors
10.0 % of Quoted rate
f. Plastering inside & outside with epoxy paint etc
10.0 % of Quoted rate
(completed with all respects)
g. Painting of letters, MS ladder pipe, railing and
all miscellaneous items such as snowcem paints 15 % of Quoted rate
in three coats etc. (completed with all respects)
h. After Completion 10 % of Quoted rate
4 Clear Water Sump
a. On approval of designs 2 % of Quoted rate
b. On completion of excavation and base slab 18 % of Quoted rate
c. On completion of vertical wall and braces 20 % of Quoted rate
d. Full supporting structure including column, ring 15 % of Quoted rate
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
and completion of top slab / dome
e. Plastering inside & outside with epoxy etc.
10 % of Quoted rate
f. Procurement and fixing of inlet, outlet,
washout, overflow pipes, valves, specials,
10 % of Quoted rate
chambers, lighting arrester conductor and
specials at site
g. Water level indictor, painting of letters, M.S
ladder, pipes, railing and all miscellaneous items
such as snowcem paint in three coats etc 15 % of Quoted rate
(Completed with all respect) including water
h. On hydraulic testing 10 % of Quoted rate
5 Elevated Storage Reservoir
a On submission of Designs 2.5% of Quoted rate
b On approval of Designs 2.5% of Quoted rate
c On Completion of excavation 7.5% of Quoted rate
d On completion of staging height up to container 22.5% of Quoted rate
e On Completion of Floor container 22.5% of Quoted rate
f On Completion of walls of container 22.5% of Quoted rate
g On Completion of Roof of container with all
related piping and other works including hydro 20.0% of Quoted rate
6 All Electro-mechanical works and
Instrumentation
1 On supply of material at work site in good 65% of Quoted rate
2 On erection of Equipment 20% of Quoted rate
3 After Sucessesful Testing & Commissioning of 10% of Quoted rate
Equipment(On Completion of Stipulated Trial
7 Valve chambers
a. On completion works as per approved drawings 95% of Quoted rate
b. After commission of system 5% of Quoted rate
8 Operation and Maintenance
Every month in equal instalment based on For monthly Payment 1/12 th
8.1 Estimated prices of O & M will be paid as per the of annual O & M price for the
Volume-III, PRICE BID Flood damage_BK-4 Ph 2A RWSS
as Per Terms and Condition
of the the tender.
For quarterly payment ¼ th
of annual O&M prices for the
per terms and Condition of
9 Miscellaneous work
a. All other items such as encasing, columns 80% of quoted rate on
support for culvert, pipe bridges for Canal completion of works
/Drain/ Khadi crossing, internal roads,
railway/highway crossing, Anchor/thrust blocks,
steel bridge for pipe crossing, etc
b. On commissioning of the system 20% of quoted rate
Signature of contractor Executive Engineer
P. H. Works Dn., Tharad G.W.S.S.B
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Ann 4.pdf
Ann 5 Purchase Policy.pdf
Ann 6B shramyogi GR.pdf
Any 6A Labour Circular.pdf
Circular 26 SIGN BOARD.pdf
GR LD Deduction 10012018.pdf
GST GR.pdf
Mecilianius min.pdf
Min wages Circular.pdf
Royelty 18.06.19 New rate.pdf
Vigilace Unitmin.pdf
DMO_2941_01-Apr-2026_744.pdf
00_Title_Pg_0.pdf
01_VOL 1 A Technical Bid 1_115.pdf
02_VOL 1 B GCC 116_229.pdf
03_VOL 2B_1A Tech Spec Civil 230_356.pdf
04_Itemwise Specification _357_397.pdf
05_VOL 2B_1D_Vendor list 398.pdf
06_VOL 3 Price bid standard_pg 399_463.pdf
07_Special Note 464.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].