Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC H NO 47 GANDHI NAGAR DHANSAR NEAR BHATIA BUILDING SHIV MANDIR DHANBAD DHANBAD 826001 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 826001 | ₹1.8 L Quoted ₹1.5 L | L1 | Accepted-AOC AWARDED |
| 2 | L2₹1.5 L+₹1,850 (1.24%)Rejected-Finance AT UPPER KULI JHARIA P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | ₹1.5 L+₹1,850 (1.24%) | L2 | Rejected-Finance DUE TO HIGHER RATE QUOTED |
| 3 | L3₹1.5 L+₹4,100 (2.74%)Rejected-Finance KATRAS MORE JHARIA DHANBAD DHANBAD DHANBAD 828111 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | ₹1.5 L+₹4,100 (2.74%) | L3 | Rejected-Finance DUE TO HIGHER RATE QUOTE |
| Sl No | Description | Qty | Unit | S K AUTOMOBILE L2 | SHRI DURGA AUTOMOBILES L1 | EXPERT ELECTRICAL WINDING WORKS L3 |
|---|---|---|---|---|---|---|
| 1.00Repair work of Water tanker. | ||||||
| 1.01 | Description of work: 1. Complete Steering system dismantling and refitting after complete overhauling. 2. Steering pump complete removing, changing and fitting. 3. Both side cabin mounting removing. Changing and fitting.
4. Steering box bracket new changing and fitting. 5. Gear box complete removing, dismantling after refitting. 6. Gear box main shaft welding and repairing. 7. Gear box lever welding, repairing and making.8. Complete FIP assembly overhauling & calibration with all required spares to be replaced.9.Nozzle assy. Calibration with pressure setting. 10. Both side driver cabin door lock and handle changing. 11. Front both side king pin overhauling.12. Tie rod and draglink changing and wheel alignment. 13. King pin bush and pin raimring, machining and fitting. Materials/Spares required: Steering kit 01 no, Steering pump assy. 01 no, Steering cross assy. 01 set, Steering rake with pinion 01 set, Steering box warm shaft assy. 01 no, Steering box bearing 02 no, Cabin mounting 02 set, Steering box bracket 01 no, Steering box bracket bolt and washer 05 no, Gear box counter shaft assy. 01 no, Gear box 2nd speed pinion 01 no, Gear box engaging 2nd gear pinion 01 no, Gear box oil packing kit 01 no, Gear box fork assy. 01 set, Gear box brass ring 02 no, Gear box synchronizer ring 02 no, Gear box roller bearing 03 no, Gear box brass pad 01 set, Hydraulic head 01 no, Supply pump 01 no, Supporting ring 01 no, T D Piston 01 no, Gov. shaft 01 no, Nozzle 06 no, Control valve 01 no, Feed pump 01 no, Door lock assy. 01 set, Door handle 02 no, Door kabja bolt 04 no, King pin kit full set, King pin spindle brass bush full set, Drag link rod assy. 01 set, Front spindle big bearing 02 no, Hub oil seal 02 no. etc.
repaing work should be completed with all required materials and manpower. | 1 | Nos | 1,51,400 ₹1,51,400 | 1,49,550 ₹1,49,550 Lowest | 1,53,650 ₹1,53,650 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹1.5 L
EMD Value
₹1,870
Closing Date
12 Aug 2025, 10:00 amClosed
Incharge, AAW KUSUNDA AREA
Office of the GM,Kusunda Area
Repair work of Tata Hyva (Water Tanker) Reg.No-JH10AE-0310 of ADIC, Kusunda Area
2025_BCCL_340681_1
BCCL/KA-VI/TRPT/E-NIT/25-26/15
Open Tender
Miscellaneous Works
Item Rate
10 days
ADIC
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
21 Aug 2025
1 Aug 2025
13 Aug 2025
1 Aug 2025
12 Aug 2025
1 Aug 2025
Amount
Repair work of Water tanker.
Description of work: 1. Complete Steering system dismantling and refitting after complete overhauling. 2. Steering pump complete removing, changing and fitting. 3. Both side cabin mounting removing. Changing and fitting. 4. Steering box bracket new changing and fitting. 5. Gear box complete removing, dismantling after refitting. 6. Gear box main shaft welding and repairing. 7. Gear box lever welding, repairing and making.8. Complete FIP assembly overhauling & calibration with all required spares to be replaced.9.Nozzle assy. Calibration with pressure setting. 10. Both side driver cabin door lock and handle changing. 11. Front both side king pin overhauling.12. Tie rod and draglink changing and wheel alignment. 13. King pin bush and pin raimring, machining and fitting. Materials/Spares required: Steering kit 01 no, Steering pump assy. 01 no, Steering cross assy. 01 set, Steering rake with pinion 01 set, Steering box warm shaft assy. 01 no, Steering box bearing 02 no, Cabin mounting 02 set, Steering box bracket 01 no, Steering box bracket bolt and washer 05 no, Gear box counter shaft assy. 01 no, Gear box 2nd speed pinion 01 no, Gear box engaging 2nd gear pinion 01 no, Gear box oil packing kit 01 no, Gear box fork assy. 01 set, Gear box brass ring 02 no, Gear box synchronizer ring 02 no, Gear box roller bearing 03 no, Gear box brass pad 01 set, Hydraulic head 01 no, Supply pump 01 no, Supporting ring 01 no, T D Piston 01 no, Gov. shaft 01 no, Nozzle 06 no, Control valve 01 no, Feed pump 01 no, Door lock assy. 01 set, Door handle 02 no, Door kabja bolt 04 no, King pin kit full set, King pin spindle brass bush full set, Drag link rod assy. 01 set, Front spindle big bearing 02 no, Hub oil seal 02 no. etc. repaing work should be completed with all required materials and manpower.
Total impact of GST for the purpose of CTC
S K AUTOMOBILE (BID ID -1174734)
EXPERT ELECTRICAL WINDING WORKS (BID ID -1174747)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_353159.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .