Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.3 LAccepted-AOC | ₹32.3 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹33.7 L+₹1.4 L (4.46%)Rejected-Finance | ₹33.7 L+₹1.4 L (4.46%) | L2 | Rejected-Finance not L1 bidder |
| 3 | L3₹34.3 L+₹2.0 L (6.16%)Rejected-Finance | ₹34.3 L+₹2.0 L (6.16%) | L3 | Rejected-Finance not L1 bidder |
| 4 | L4₹34.8 L+₹2.5 L (7.81%)Rejected-Finance | ₹34.8 L+₹2.5 L (7.81%) | L4 | Rejected-Finance not L1 bidder |
| 5 | L5₹35.7 L+₹3.4 L (10.6%)Rejected-Finance | ₹35.7 L+₹3.4 L (10.6%) | L5 | Rejected-Finance not L1 bidder |
| Sl No | Description | Qty | Unit | ENGINUR CONSTRUCTIONS L3 | SIGNATURE INTERIORS AND CONTRACTORS L2 | P Rajesh L7 | ADVANCED COATINGS AND CONTRACTING CO. L8 | RENJITH R A L6 | Petrocoat Specialty chemicals Pvt Ltd L4 | BRIJEESH K N L5 | DIVYA CHEMICALS L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface preparation:
Laitance and deposits on concrete floors are preferably removed by light grit/shot blasting, mechanical scarifying or grinding and cleaning by wire brush and vacuum etc to remove all dirt,oil etc to achieve an open textured surface and repairing works to be done using Epoxy based mortar. | 2,600 | sqm | 40 ₹1,04,000 Lowest | 90 ₹2,34,000 | 48 ₹1,24,800 | 75 ₹1,95,000 | 45 ₹1,17,000 | 145 ₹3,77,000 | 120 ₹3,12,000 | 60 ₹1,56,000 |
| 2.00 | Applying one coat of sealer/primer(specified base coat of top epoxy) as per manufacture's specification and engineer-in-charge including applying additional coats to wherever required to achieve even coverage. | 2,600 | sqm | 180 ₹4,68,000 | 113 ₹2,93,800 | 123 ₹3,19,800 | 110 ₹2,86,000 Lowest | 415 ₹10,79,000 | 200 ₹5,20,000 | 130 ₹3,38,000 | 115 ₹2,99,000 |
| 3.00 | Applying 2mm thick self levelling epoxy screed as per manufacture's specification and engineer-in-charge. | 2,600 | sqm | 460 ₹11,96,000 | 453 ₹11,77,800 | 730 ₹18,98,000 | 460 ₹11,96,000 | 415 ₹10,79,000 | 490 ₹12,74,000 | 495 ₹12,87,000 | 380 ₹9,88,000 Lowest |
| 4.00 | Applying Epoxy PU self levelling floor topping of 1mm thickness as per manufacture's specification and engineer-in-charge. | 2,600 | sqm | 450 ₹11,70,000 | 428 ₹11,12,800 | 448 ₹11,64,800 | 540 ₹14,04,000 | 415 ₹10,79,000 | 315 ₹8,19,000 Lowest | 440 ₹11,44,000 | 365 ₹9,49,000 |
| 5.00 | Line marking: The work includes line marking on epoxy floor area to ensure clear demarcation to ensure safe movement within the premises of approved colour as per Engineer-in-charge to ensure long lasting visibility and resistance to wear.(Thickness of line:100mm) | 600 | m | 150 ₹90,000 | 102 ₹61,200 | 68 ₹40,800 Lowest | 120 ₹72,000 | 160 ₹96,000 | 75 ₹45,000 | 200 ₹1,20,000 | 110 ₹66,000 |
| 6.00 | Masking of panels using appropriate materials before commencement of work for avoiding dust accumulation over panel during surface preparation and removal of masking after completion of work as per the direction of engineer in charge. | 1 | LS | 20,000 ₹20,000 | 10,000 ₹10,000 Lowest | 20,000 ₹20,000 | 20,000 ₹20,000 | 15,000 ₹15,000 | 15,000 ₹15,000 | 25,000 ₹25,000 | 20,000 ₹20,000 |
| 7.00 | Removing and refixing in position of existing chequered plates layed on substation floors without causing any damage to the plates as dper the directions of Engineer in Charge. | 1 | LS | 25,000 ₹25,000 | 15,000 ₹15,000 | 20,000 ₹20,000 | 20,000 ₹20,000 | 15,000 ₹15,000 | 30,000 ₹30,000 | 15,000 ₹15,000 | 10,000 ₹10,000 Lowest |
| 8.00 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including metal putty, appropriate priming coat,cleaning and preparation of surface by scrubbing/grinding/patching etc. complete. The rate shall include the cost of scaffolding wherever required at all levels. On steel work.(Chequered plates) | 1,100 | sqm | 300 ₹3,30,000 | 403 ₹4,43,300 | 160 ₹1,76,000 Lowest | 620 ₹6,82,000 | 200 ₹2,20,000 | 300 ₹3,30,000 | 280 ₹3,08,000 | 650 ₹7,15,000 |
| 9.00 | Engaging manpower for cleaning of panels, windows, shutters etc. (muster roll and reports shall be maintained) as per direction of Engineer - in - charge: Coolie | 20 | each | 1,200 ₹24,000 | 1,200 ₹24,000 | 1,200 ₹24,000 | 1,250 ₹25,000 | 1,400 ₹28,000 | 3,500 ₹70,000 | 1,100 ₹22,000 Lowest | 1,250 ₹25,000 |
Tender Value
₹40.8 L
EMD Value
₹50,000
Closing Date
27 Jan 2026, 4:00 pmClosed
CEO
Park center Infopark Kochi
Work includes preparation of surface, application of 3mm thick EPU floor coat, Epoxy painting of chequered plates etc.
2026_INFOP_827530_1
INFOPARK/e-TENDER/020/2025-26
Open Tender
Civil Works - Others
Item Rate
90 days
Infopark Phase 1 Phase 2
As mentioned in NIT
2 documents required · 2 mandatory
₹2,950
₹50,000
7 Apr 2026
14 Jan 2026
29 Jan 2026
14 Jan 2026
27 Jan 2026
16 Jan 2026
14 Jan 2026 - 16 Jan 2026
Surface preparation: Laitance and deposits on concrete floors are preferably removed by light grit/shot blasting, mechanical scarifying or grinding and cleaning by wire brush and vacuum etc to remove all dirt,oil etc to achieve an open textured surface and repairing works to be done using Epoxy based mortar.
Applying one coat of sealer/primer(specified base coat of top epoxy) as per manufacture's specification and engineer-in-charge including applying additional coats to wherever required to achieve even coverage.
Applying 2mm thick self levelling epoxy screed as per manufacture's specification and engineer-in-charge.
Applying Epoxy PU self levelling floor topping of 1mm thickness as per manufacture's specification and engineer-in-charge.
Line marking: The work includes line marking on epoxy floor area to ensure clear demarcation to ensure safe movement within the premises of approved colour as per Engineer-in-charge to ensure long lasting visibility and resistance to wear.(Thickness of line:100mm)
Masking of panels using appropriate materials before commencement of work for avoiding dust accumulation over panel during surface preparation and removal of masking after completion of work as per the direction of engineer in charge.
Removing and refixing in position of existing chequered plates layed on substation floors without causing any damage to the plates as dper the directions of Engineer in Charge.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including metal putty, appropriate priming coat,cleaning and preparation of surface by scrubbing/grinding/patching etc. complete. The rate shall include the cost of scaffolding wherever required at all levels. On steel work.(Chequered plates)
Engaging manpower for cleaning of panels, windows, shutters etc. (muster roll and reports shall be maintained) as per direction of Engineer - in - charge: Coolie
stage.html
html • 0.06 MB
technical_1388749.pdf
techsummary_1388749.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
conditionofcontract.pdf
Tender Documents • 1.21 MB
BOQ_1388749.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .