DEPUTY CITY ENGINEER-3 SOUTH ZONE
Necessary civil repairing & maintainance work of Existing toilet blocks and diff. locations inside kankariya parisar in Maninagar ward, Southzone. (ARC).
280423
Tn Nt No 18 2025 26 Tn No 917
Open
Miscellaneous Works
Works
Ahmedabad
₹900
Municipal Commissioner, Ahmedabad
₹10,000
26 Feb 2026
26 Feb 2026
26 Feb 2026
2 Mar 2026
26 Feb 2026
Name of work :- Necessary civil repairing & maintainance work of Existing toilet blocks and diff. locations
inside kankariya parisar in Maninagar ward, Southzone. (ARC).
Qty Description Rate Unit
1 Demolition incl. stacking of serviceable materials &
disposal of unserviceable materials with all lead and lift.
1.00 (a) R.C.C. work 1047.38 Cmt
1.00 (b) Brick work in Cement mortar 544.95 Cmt
5.00 (C) Plaster 19.38 Smt
5.00 (d) Tiles or Stone flooring 47.25 Smt
1.00 (e) Sheet roofing (G.I. Or A.C.) 53.55 Smt
1.00 (f) Doors,Windows ventilators (wood/steel) 185.85 No
2 Dismantling barbed wire fencing / Chainlink Fencing
including making rolls and also including dismantling
fanning posts including all earth work concrete in
1.00 the base and making good the disturbed ground 66.15 Rmt
stacking unseal materials as directed and disposing all
the unserviceable materials with all leads al lifts &
carting to AMC Store as directed by engg. in charge
3 Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and
disposing off the
excavated stuff upto 50 Meter lead.(A) Loose or soft soil
1.00 (a) 0 to 1.5 mtr depth 201.81 Cmt
1.00 (b)1.5 to 3.0 mt. depth. 222.72 Cmt
1.00 (c)3.0 to 5.0 mt. depth 243.62 Cmt
4 Providing and laying cement concrete 1:4:8 (1 - Cement
: 4-Coarse sand : 8-Graded Brick bats aggregate 40 mm
normal size) and curing complete excluding cost of form
work in (A) Foundation and Plinth (upto 10 ton)
5 Provdg. & laying cement concrete 1:4:8 (1 cement :
coarse sand : 8 hand broken stone aggregates 40 mm
nominal size) and curing complete excluding cost of
form work in Foundation and plinth.
Providing & Applying Tremix method ( Vaccum de
extracted & Powered trowelled ) for Concrete Flooring
with necessary finishing either smooth or wire finish as
approved by consultants. Rate shall includes the rate of
side shuttering with channel , rails to form panels etc.
Providing and laying controlled cement concrete M-200
7 and curing complete, excluding the cost of form work
and reinforcement for reinforced concrete work
(A) Foundations, footings, base of columns, and mass
(B) Walls from top of foundations/level up to floor two
(C) Slabs, landings, shelves, balconies, lintels, beams,
girders and cantilever upto floor two level.
(D) Columns, pillars, posts and struts upto floor two
1.00 (E) Staircase up to floor two level. 5418.91 Cu.M.
1.00 (K) Vertical and horizontal fins up to floor two level. 4701.97 Cu.M.
Filling in plinth with sand under floors including
8 2.00 watering ramming, consolidating and dressing complete 455.63 Cu.m
Filling Available Excavated Earth (Excluding Rock) In
Trenches,Plinth,Sides Of Foundations Etc.In Layers Not
9 20.00 Exceeding 20 Cm.In Depth Consolidation Each 129.10 Cu.m
Deposited Layer By Ramming And Watering.
Filling in foundation and plinth with murrum or selected
10 5.00 soil in layers of 20cm. thicknessincluding watering, 215.54 Cu.m
ramming and consolidating etc. complete.
Providing form work in ordinary timber planking so as to
give a rough finish including centering, shuttering,
strutting and propping etc. height of propping and
centering below supporting floor to celling not
exceeding 4 M & removal of the same for in situ
reinforced or plain concrete work in
(A) Foundation, footings, bases of columns etc. and
(B) Flat surface such as soffits of slabs, landing and the
like (I) Floors etc. 200 mm in thickness.
(C) Vertical surface such as walls (any thickness)
10.00 partitions and the like including attached but tresses & 229.95 Smt
string course & the like.
(D) Columns Pillars Posts and struts.(1) Square
Rectangular Polygonal in plan.
2. Columns, pillars, posts & struts.(2)Circular or
curved in plan.
E (1) Sides and soffits of beam, haunchings cantilevers,
5.00 girders, bressumers and lintels not exceeding 1 M in 192.15 Sq.M.
(2) Sides and soffits of beam, haunchings
5.00 cantilevers, girders, bressumers and lintels exceeding 1 259.88 Sq.M.
(L) chullah hoods, weather sheds, chhajas, carbels etc
including edges.
(M) Staircase with-sloping or stepped soffits incl. risers
& strings excluding landing.
5.00 (Q) Vertical fins and vertical sun breakers. 382.73 Sq.M.
Provdg. & laying cement concrete 1:2:4 (1 cement :
coarse sand : 4 graded stone aggregates 20 mm
nominal size) and curing complete excluding cost of form
work and reinforcement for reinforced concrete work in
1.00 (A) Foundations, footing, of columns and mass concrete 3923.53 Cu.M.
(B) Slabs, landings, shelves, balconies, lintels, beams,
girders and cantilever upto floor two level.
(C) Columns, Pillars posts and struts upto floor two
Providing TMT Bar FE 500 reinforcement for R.C.C.
13 150.00 work including bending,binding and placing in position 75.46 Kg
complete upto floor two level.
Brick Work Using Common Burnt Clay Building Bricks
Having Crushing Strength Not Less Than 35 Kg/Sq.
Cm. In Cement Mortar 1:6 (1 Cement : 6 Fine Sand) (A)
In foundation and Plinth
Extra for brick work in super structure above plinth level
upto floor two level (B) Conventional
Half Brick Masonry In Common Burnt Clay Building
Bricks Having Crushing Strength Note Less Than
Kg/Sq. Cm. In Cement Mortar 1:4 (1 Cement :
Coarse Sand) In Foundation and plinth
Extra for half brick masonry in super structure above
plinth level upto floor two level. (B) Conventional
Providing cement plaster in single coat on brick/concrete
wall for interior/exterior plastering upto any floor level
18 finished even and smooth in CM 1:3 incl. finishing with
floating coat of neat cement slurry, with necessary
scaffolding etc. complete
Extra over above item for Ceilling plaster on Ceilling
19 5.00 and soffits of stairs up to any floor 24.57 Smt
Providing 20mm thick double coat sand face/mala
cement plaster on interior brick/concrete work for
plastering comprising o f base coat of 12mm thick
cement plasterin cement mortar
(1Cement:4coarsesand) in rough finishing and 8mm
thick t op coat of cement mortar1:2
(1Cement:2Coarsesand) finished with trovel including
scaffoldingcuring etc. complete.
Providing & laying Stone chips Plaster with / without
21 2.00 grooves for making panels incl.backing coat of plaster in 354.00 Sq.M.
C.M.(1:3) in grey cement as per dir.Of consultants.
Providing & Applying Cement Popada Plaster In
Cement Mortar In 1 : 3 Incl. Cleaning Surface Before
Plastering Rate Also Incl. Scafloding, Watering , And
Neat Finishing Etc. Comp. As Dire.
Providing and applying fibere reinforced cementitious
micro concrete work in cellings and beams incl.mixture
of CEMSCREED HM (F) fair mate company material, FBR
23 2.00 bonding agent material with water in suItable 530.00 Sq.M.
proportion anti corrosive treatment on exposed
beam,celling steel bars with safeCore R incl.all kind of
labour etc.comp.including three coat of white wash.
Providing And Laying Polished Kota Stone Slab
Flooring Over 20 Mm. (Average) Thick Base Of Cement
Mortar 1:6 (1 Cement : 6 Coarse Sand) Or Lime
24 10.00 Mortar 1:1.5 Laid Over And Joined With Grey Cement 982.83 Smt
Slurry mixed with pigmentt omatchtheshade of slab
including rubbing and polishing
etc.complete.(A)25mmthick.
Providing and laying Rough chiselled dressed (kota
stone green) stone flooring over 25 mm. thick base of
25 15.00 cement mortar 1:5 (1 cement : 5 coarse sand) or L.M. 554.03 Sq.mt
1:1.5 including pointing with cement mortar 1:2 (1
cement : 2 coarse sand) etc. complete.(Item No.14.46)
Labour Work for moulding the polish kota stone surface
26 5.00 rate also including provding cutting and grinder 150.00 Rmt
machine for molding work etc.complete as directed.
Labour work for Polish kota stone surface rate also
27 5.00 including providing cutting and grinder machine for 64.00 Smt
molding work etc comlete as directed.
Providing And Laying Cement Concrete Flooring For
I.P.S.1:2:4 (For Indian Patent Stones) (1 Cement:
28 3.00 Coarse Sand:4 Graded Stone Aggregate 20 Mm. 297.68 Smt
Nominal Size) Lain In Layer Finished With A Floating
Coat Of Net Cement.(40 Mm Th.)(Item No.14.71)
Additional Rate For Providing Water Proofing Solution in
P & L 24"x24" vitrified 8mm thick tile flooring over
20mm (average) base of cement mortar
1:6(1cement:6coarsesand) on new surface or fixing on
30 3.00 existing flooring by adhesive material including 1383.99 Smt
dismentaling of existing flooring and jointed with color
cement slurry including finis ed with flush pointing &
cleaning the surfaceetc.complete for anti skit.
P & L 24"x24" vitrified 8mm thick tile flooring over
20mm (average) base of
cementmortar1:6(1cement:6coarsesand) on new
surface or fixing on existing flooring by adhesive
material including dismentaling of existing flooring and
jointed with color cement slurry including finis ed with
flush pointing & cleaning the surfaceetc. complete for
Providing and Fixing pvc.Door (sintex door-equivalent)
32 3.00 with necessary alluminium fitting with EL-7 section 1617.00 Sq.M.
Providing & laying polish kota stone (25 mm th,)
Sandwich platform. Work incl. provdg good quality &
even shade polish kota stone of required size having
uniform thickness. Work also incl. providing nece.
Dismentling of brick work for making jari to support the
P/F glass of 4 mm thik for vent lowers and window with
34 3.00 wooden border patti as per instruction of eng. In chage. 150.00 No
Making hole in brick wall & all damaged work shall be
well repaired as per inst. etc. comp
36 5.00 Provdg. & fixing rubber plug for sink or wash basin. 19.43 No
Providing and fixing 30mm thick FACTORY MADE SOLID
PANEL PVC DOOR SHUTTER consisting of frame made
out of M.S. tubes of 19 gauge thickness and size of
19mm x 19mm for stiles and 15mm x 15 mm for top and
bottom rails. M.S. frame shall have a coat of steel
primers of approved make and manufacture, M.S. frame
shall be covered with 5 mm thick heat moulded PVC ‘C’
channel of size 30 x 50 mm forming stiles, and 5mm
thick 75mm wide PVC sheets for top rail, lock rail and
37 1.00 bottom rail on either side, and 10mm (5mm x 2) thick, 1135.02 Smt
20mm wide cross PVC sheet as gap insert for top rail
and bottom rail, Panelling of 5 stiles and rails with
30mm wide x 5mm thick PVC sheet beading on eighter
side, and joined together with solvent cement
adhesive,. An additional 5mm thick PVC strip of 20mm
width is to be stculk on the interior side of the ‘c’
channel using PVC solvent cement adhesive etc.
complete as per direction of Engineer in charge,
manufacture’s specification and drawing.
Providing and fixing approved standard brand factory
made PVC door FRAME of size 50 x 47 mm with a wall
thickness of 5 mm made out of extruded 5 mm rigid
PVC foam sheet mitred at corners and jointed with
2 Nos. of 150 mm long brackets of 15 x 15 mm
M.S.square tube the vertical door profiles to be
38 5.00 reinforced with 19 x 9 mm M.S.square tube of 19 314.88 Rmt
guage, EPDM rubber gasket weather seal to be
provided through out the frame. The door frame to be
fixed to the wall using M.S.screws of 65/100 mm size
etc.complete as per manufacturers specifications and
direction of Engineering in charge incl. medium grade
aluminium hardware all octroi, tax charges etc.complete
Providing and fixing Prelam PVC sheet wall paneling of
thickness 5mm consisting of panels having size 1220 x
2440 mm stuck on inner frame work of 50mm wide
strips of 5mm thick PVC sheet. The strips should have in
their center a grove of 6mm width asnd 1mm depth for
sinking the had of the screw using to fix the strips of the
39 1.00 wall and should be placed vertically at equal intervals of 944.00 Smt
10” center to center. The PVC strips shall be fixed to the
wall using 65mm long M.S. scres through the groove in
the strip by using PVC fasteners. The distance between
two screws shall not be more than 200 mm. A groove of
2mm may be left at the joint of two panel for aesthetic
looks. The exact sizeof the panel and correspondingly of
the grid may vary depending on the size of the wall.
Providing and fixing 35 mm th. Shutters for doors
windows & clearstory windows incl. wood frames as
specified 12 cm. x 7cm. size incl. anodised alluminium
fixtures and fastenings including primer coat of
approved quality and two coats of oil paint etc.
a 1.00 (I) Fully glazed 4788.50 Smt
b 1.00 (II)Fully panelled 5478.89 Smt
c 1.00 (III) Partly panelled & partly glazed. 5133.69 Smt
Providing and laying white glazed tiles 6mm thick in
flooring treads of steps and landing laid on a bed of
41 2.00 12mm thick cement mortar 1:3 (1-cement : 3-coarse 908.17 Smt
sand ) finishing with flush pointing in white cement.
Providing And Laying Glazed Tiles 6 Mm Thick In
skirting risers of Steps and dedo 10Mm Thick Cement
plaster 1:3 (1Cement : 3Coarse Sand)Finished With
Flush Pointing In White Cement slurry.
Providing and laying Ceramic tiles 6mm thickin flooring
treads of steps and landing laid on abed of 12mm thick
cement mortar 1:3 (1-cement: 3-coarse sand ) finishing
with flush pointing inwhite cement.
Providing and fixing rough cast wired glass 6 mm thick
bedded in putty and thick with wooden beading
including the cost of wooden beadings of Indian teak
wood and necessary cutting of glass.
1.00 (C) wired figured glass. 559.26 Smt
Supplying and fixing Nimbhada ladi 37 to 50 mm thick
for walk-way, covering the activity of excavation,
45 5.00 ramming, Laying on sand bedding as per requirement to 236.61 Smt
fix the Nibhada Stone in Line & Level with cement
pointing in cement mortar 1:2 etc complete as directed.
Labour work for fixing above or any interlocking
blocks/nimbhada on up to 50mm th sand
bedding,levelling,watering anf fixing. Rate incl. average
30cm depth for excavation and or filling,carting away
debries/excavated material up to 5 km and cleaning the
site etc.comp. as directed.
Providing and laying broken chine mosaic flooring for
terrace using 12 mm to 20 mm broken pieces of glazed
tiles to be laid over cement mortar 1:3 to plain or slope
47 2.00 and to be tempered to bring mortar creme out upto 739.89 Smt
surface using white cement including rounding
off junctions and extending them upto 15 cm along the
wall,clearing with water and oxalic acid etc. as directed
Providing & fixing Approved Make Glass Mosaic on
Plastered surface.Glass mosaic shall be of 25 mm x
mm size & 4 mm thickness pasted on a net / paper
sheet.Glass mosaic pieces are mounted uniformly on
the net / paper sheet.colour shade combinations.Rate
includes all material,Labour,Scaffolding etc.complete.
Providing cement vata (10cm. x 10 cm. size)quarter
49 5.00 round in cement mortar 1:1 includingneat cement 23.45 Rmt
finishing,watering etc. complete.
Providing, supplying and fixing precast C.C. blocks (M-
20) edge kerb having size of 75 x 300 x 300 mm depth
50 4.00 and as per design conveying it to the site, jointing into 195.54 Rmt
C:M 1:3 and racking out the joints incl. necessary
excavation of asphalt, soil etc..completed.
Conveyance charge of earth murrum, building rubbish,
51 15.00 manure, garbage, sludge, excavated rock,fly ash, 235.51 Cmt
aggregates of any kind etc.comp
Providing & Fixing M.S.Grill,Gate,Elevation Element Of
Decorative Pattern With M.S.Channel,Flat,Medium
52 15.00 Grade M.S.Pipe,Square Or Round Bars With Round 95.00 Kg
Heanded Bolts,Nuts,Or By Screw.Incl.Applying One
Coat Zinc Primer And Two Coat Of Oil Paint
Providing and fixing 18 gauge s.s.304 grade stair railing
as per design given and direction of incharge
P/L. fine dressed 15 to 20 mm. average thick Dholpuri
stone paving over Cement mortar 1:2 (1 Cement :
54 3.00 Sand ) Including filing joints with cement mortar 1:3 820.00 Smt
and flush pointing with coloured cement painting
and finishing as directed.
Providing & Laying 18 mm thick Mirror polish granite
For flooring , counter , stair -riser , tread , skirting , dedo
55 5.00 etc. machine cut or chiselled on bed of cement mortar 2672.00 Sq. M.
1:1 pointing with neat cement slurry incl. moulding etc.
comp. as per instruction of engineer in charge.
Providing & Fixing 20 mm thick Mirror Polished
Decorative Granite Board with Computerised Golden
56 6.00 Letters Discription as per instructions of engg. in charge 4304.00 Sq.mt.
to M.S. frame structure for Inaugaration & Public
Handover Function
Providing & Fixing M.S.structure from square &
rectangular pipes,angles,flats,round etc.of required size
for above mentioned granite board of suitable size
mentioned by engineer in charge.
Removing and refixing old granite stone on walk way of
KLF and for planter opp workshop in KLF removing
granite stone and cleaning cement mortar with grinder,
hammer and takna, and filling the joints with white
cement and necessary colour pigment as per instruction
of eng. in charge.
Provinding and fixing in perfect alignment gypsum
board false ceiling with all material,labour,tools
59 5.00 ,tackles,scaffolding and equipment including providing 650.00 smt
and fixing gypboard with onw coat of primer and two or
more coats of acrylic emulsion paint
Removing and refixing the existing M.S.Grill from Brick
work column and refixing the same with new R.C.C
60 5.00 casting column in line and level,including repairing M.S 264.00 Smt
Grill if required with providing M.S hold fast etc as per
site condition.
Providing & fixing 2.00 mm thick F.R.P. sheet of good
quality and standard make rate also includes necessary
fabrication structure in the grid of 1'-6" x 1'-6" size
usiung hollow pipe of size 3/4" x 3/4" , 2" x 1" & 1" x 1"
61 2.00 rate also inclusive necessary bending ,cutting and 1865.00 Smt
fabrication charges and priming coat and 2 coats of oil
paint of shade approved by engineer in-charge rate also
includes washer and silicon paste required for fixing the
sheet in good quality as diredted.
Carrying out plinth treatment to post construction /
exsiting structure by spraying chemical solution for
termite control treatment incl. labour and materials
consistant with I.S.I specification.
Carrying out timber treatment to all wood work incl.
drilling holes and spreying oil based chemical solution
on surface ot timber work for termite contorl including
labour and materials etc. comp
Provdg. & fixing 100 mm size P or S trap for water
64 closet squatting pan incl. jointing the trap with the pan
& soil pipe in cement mortar 1 :1 (cement : 1 fine sand)
1.00 (A) Vitreous China : 311.85 No
Providing and fixing wsh down water closet
(Europeantype,W.C.Pan) with integral P or S trap
including jointing the trap with soil pipe in Cement
Mortar1:1(1-Cement:1-finesand) (Sea land cover to be
measured and paid for separately) (A)vitreous China
Pattern :(i) in white colour
Provdg. and fixing water cloest squatting pan ( indian
type W.C. pan) size 580 mm ( Earth work. Bed concrete,
foot rests and trap to be measured and paid for
66 1.00 separately) (A) Vitreous China : (1) Long pattebn white 1039.64 No
colour. including puffin cement mortar 1 :3 (1 cement :
3 coarse sand) a pair of white virteous China 250 mm x
130 mm x 30 mm foot rest for long patten swuatting
pan water closet. including Provdg. & fixing G.I. inlet
connection for flush pipe with W.C. pan.
Providing and fixing washbasin with single hole for pillar
tap with C.I. or M.S. brackets painted white including
67 1.00 sutting holes and making good the same but excluding 1400.18 No
fittings.(A) Vitreous China:(ii) Flat Back washbasin
mm x v 400mm size. (i) In white colour.
Provdg. & fixing C.P. Brass screw down bib taps of
68 following size (B) Brass chromium plated screws down
a 1.00 (II) 20mm dia 212.68 No
Providing & Fixing Angle Cock Of "Ess Ess" Trend
69 1.00 Series Or Equivalent Standard Make As Approved By 675.00 No.
Engg.In Charge All Complete.
Provdg. & Fixing Gun Metal Check Or Nonruturn
70 3.00 Full Wheel Valve. (A) 15 Mm Dia 184.98 No
Supplying nece hardware, Fittngs etc.comp of
app.quality as under
5.00 (a)1/2 '' Half turn bib cock 150.00 No
(b)1/2 '' Gun metal check or non return full wheel
5.00 (c) 1/2 '' Piller tap 200.00 No
3.00 (d) 1/2 '' stop cock 92.00 No
3.00 (i) S.S. Jali 23.00 No
3.00 (j) S.S.Soap dish 48.00 No
3.00 (k) waste pipe 23.00 No
3.00 (l) PVC 1/2 '' Half turn bib cock 25.00 No
Providing and fixing chromium plated brass half
72 trun flush cock of approved quality including fixing in
pipe line etc. complete.
3.00 (ii) 25mm dia. 261.16 No
3.00 (iii) 32mm dia. 273.03 No
3.00 (II) 50 mm dia 136.52 No
Provdg. & Fixing Flat Back Large Urinal of White/ color
of "Cera" or " Hindware" incl. C.P. Brass waste coupline
waste pipe, pvc connection etc. Complete.( size
Providing & Fixing Chromium Plated Brass Flush
Cock With Lever Of "Ess Ess" - Trend Series Or
Equivalent Make Incl.Fixing In Pipe Etc.Comp.As Dir.Of
Engg.In Charge.(N.S.) (1) 25 Mm Dia.
Provdg. & fixing 600mm x 450 mm Bevelled edge
mirror of superior glass mounted of .6 mm th. A.C.
sheet or plywood sheet and fixed to wooden pluge with
C.P. brass screws and washers.
Provdg. & laying S.W. Gully trap with C.I. garting brick
masonry chamber & water tight C.I. cover with frame
76 1.00 of 300 mm x 300 mm size ( inside) with standard 1283.11 Each
weight.sqare mouth trap size 150 x100 mm P trap
Provdg. And Fixing Cast Pvc/C.I.(Span) Nahni Trap
Of The Following Nominal Diameter Of Self Clenising
77 2.00 Design With C.I. Scread Down Or Hinged Gratiing Incl. 381.00 Each
Cost Of Cutting & Making, Good The Walls And Floors
100 Mm Inlet And 50 Mm Outlet Etc.Comp
Provdg. & fixing plastic seat & cover for wash down
78 water closet with C.P.brass hinges and rubber buffers.
1.00 (B) plastci seat & cover 288.45 No
Provdg. & fixing 12.5 lit.PVC Flush tank with
79 3.00 nece.fixtures etc.comp as per site condition 1165.20 No.
P/F Jet Spreay at Europeon WC Pan, incl nece. lath
80 1.00 connection, stop cock, and other fixing material and 361.00 no
labour as per inst. of engineer in charge
Construction Of Under Ground Tank With 23 Cm
Th.Masonary Wall In C.M.1:6 Incl.Excavation,Necessary
23 Cm B.B.C.C.1:5:10 For Foundation And Providing
R.C.C.1:2:4 For Top & Bottom Slab Of 12 Mm Th.And
7.5 Mm Th.R.C.C.Paradi On Face Of Internal Side Of
Periphary Of The Tank Incl.Formwork T.M.T.Steel
Reinforcement As Per Given Design,Vibrating
Curing & Mixing Of Approved Water Proofing
Material With Every 50 Kg.Bag Of Cement,Inside
Plaster In C.M.1:3 And Vatta In C.M.1:1 Inside
Tank,P&F F.R.C.Frame Cover Of Size600 X
Mm,Fiber Steps Etc.Comp.As Dire.
Providing & Fixing Polytheline Over Head Tank With
82 1000.00 Necessary Dia.Holes For Outlet,Inlet Over Flow And 7.72 lit
Washout Necessary Washer And Checkput Etc.Comp.
Providing & Fixing Door closer-complete of Approved
83 5.00 make to wooden / Alluminium Doors as per direction of 480.00 No.
engg.in charge.(N.S.)
P & F app.quality for Conseal lock in Alu.door .as per
inst of engg in charge .etc.comp.
P & f app.quality for brass baby latch (door stopper) as
per inst of engg in charge .etc.comp
Providing throating or plaster drip, grooves and
86 30.00 moulding to Wall , R.C.C. chajja and slab. 27.50 Rmt
Providing & Fixing In Position Alluminium Doors With
Frame Using Approved Quality Anodised Extruded
Alluminium Section As Approved By Engg.In
Charge(Jindal Alluminium) (A)Frame Sections
101.6x44.45 Mm(B)Shutter Bottom Vertical & Top
Section 83.5x44.45 (Wt.1.31 Kg/Mt.)(At
87 1.00 1.31Kg/Mt)(C)Shutter Bottom Section At14.3x44.45 2900.00 Smt
Mm At (1.37 Kg/Mt) Shutter Middle Section At
100x44.3 Wt.(1.37Kg/Mt) Incl.Providing & Installing
Mm Thick Approved Color Acrylic Sheet Of Standard
Quality Fixed With Glazing Chips On Upper Pannel
& Laminated Sheet On Lower Pannel (Wtt.0.13
Kg/Rmt) Etc.Comp.As Direction Of Engg.In Charge.
Providing & Fixing In Position Alluminium Window
Sliding / Fix Type With Frame Using Approved Anodised
Extruded Alluminium Section As Approved By Engg.In
Charge.(Jindal Alluminium) Units Equivalent (A) Frame
Sections 65 X 25 Mm (At 0.41kg/Mt) (B) Sliding Frame
Bottom Section Of 61.85 X31.75 Mm (At 0.41 Kg/Rmt)
(C) Shutter Top & Bottom Section 40 X 18 Mm
(Wt.0.41 Kg/Rmt) (D) Shutter Interlock Vertical
Section 10 X18 Mm.(0.41 Kg/Rmt) (E) Shutter
Vertical Of 40 X 18 Mm (0.41 Kg/Rmt) Including P/F
Installing 5 Mm Thick Approved Color Acrylic
Sheet Of Standard Quality Etc.Comp.(N.S.)
Providing & Fixing In Position Alluminium Vents With
Frame Using Approved Anodised Extruded
Alluminium Section As Approved By Engg.In
Charge.(Jindal Alluminium) Units Equivalent
(Approved Rate) Frame Section Of 63.50 X 38.50Mm
(Wt.0.68 Kg/Rmt) Incl.Providing & Installing 5 Mm Thick
Approved Color Acrylic Sheet Of Standard Quality
Providing and fixing in position collapsible steel shutters
with vertical channels 20x10x2 mm braced with flat iron
diagonals 20x5 mm size with top & bottom rails of T-
iron 40x40x6 mm with 38 mm dia. Steel pulleys
complete with bolts , nuts , locking arrangement
stoppers , handles including applying a priming coat of
red lead paint & two coats of enamel paint of selected
shade & approved make.
Providing corrugated 0.80 mm (22 gauge) thick G.I.
sheets roofing fixed with galvanized iron ‘J’ or ‘L’ hook
91 3.00 bolts, and nuts 8 mm. dia with bitumen and G.I. limpet 793.10 Sq.M.
washers filled with white lead complete excluding the
cost of purlines, rafters and trusses.
Providing valleys 900mm overall in plain 1.6mm thick
G.I. sheet fixed with G.I. J or L Hooks, Bolts and nuts
glavanised iron J or L Hooks Bolts and nuts 8mm dia G.I.
Limpet and bitumen washers complete.
Providing and fixing rolling shutters of approved make
made of 80 mm wide M.S.laths interlocked together
through their entier length & joinned together at the
enda by & locks mounted on specially design pipe shaft
with bracket plates giudes channel & arrangement for
inside & out side locking with push pull operation incl.
the the hood cover & spring etc. including priming , oil
painting etc complete.
2.00 (A) Shutters having width below 3.5 meter 3720.00 Sq.M.
Provdg. & fixing UPVC handle valve of Prince,Supreme
94 Astral, finolex or equivalent make as per dir. Of engg. In
Provdg. And fixing to wall ,ceiling and floor 6.00 kg.
F/Sq.Cm working pressure polythelene pipes of the
95 following outside diameter, low, density, complete with
special flange compression type fittings, wall clips etc.
making good wall ceiling and floor.
a 2.00 20mm dia 52.08 Rmt
b 2.00 25mm dia 66.99 Rmt
P/F. To Wall Ceiling And Floor 10.0 Kgf/Cm2 Working
Pressure Pvc Pipes Of The Following Outside Dia
96 Complete With Special Flange Type Fittings,Wall
Clamps Incl. All Necessary Fittings Etc. Complete. (At
Any Floor Level)
c 2.00 32mm dia 77.60 Rmt
d 2.00 40mm dia 82.95 Rmt
e 2.00 50mm dia 110.25 Rmt
f 2.00 75mm dia 186.90 Rmt
g 2.00 110 mm dia 333.90 Rmt
Provdg. And fixing to wall, ceiling & floor in true line and
level UPVC pipe Schedule- 40 of Prince , Supreme
astral , finolex or equivalent make as approved by engg.
incharge. pipe shall be fix on wall with the help of clamp
97 at every twi meter center to center of shall be
concealed as directed in cluding neccesarry fitting etc.
in cluding testing of pipe and jointd and fixing the same
with adhesive solvent , including cost of all materials of
following nominal bore
Providing & Laying & Jointing glazed stoneware pipes
incl. excavation up to 2.0 mt.,refilling, trasporting the
pipe to work site, unloading, lowering in trenches,
laying and jointing the pipes in c.m. 1:1 incl. all jointing
98 materials such as cement, sand, hemp, bitumen as dire.
testing the pipe line to a head of 1.5 mt. and hydraulic
test as dire incl. watering trenches, spreading , and
carting away of surplus earth within 100 mt.lead as dire.
c 5.00 100 mm dia 140.70 Rmt
d 8.00 150 mm dia. 192.15 Rmt
Supply of Graout Material for Paving work in KLF &
99 2.00 work carry out as per Instructed by engineer 130.00 Kg.
P/F. to wall ceiling and floor galvanized mild steel tubes
(Medium grade) of the following nominal dia. with all
100 tube fittings and clamps incl. making good the wall,
ceiling and floor. (At any floor level)
Providing & Fixing 5 mm Thick Mirror in Diff. Toilet
Block Unit in Kankaria Lake Front with S.S Studds & also
Removing Existing Break Mirror etc comp as Directed
Providing & Fixing 15 Cm Wide Chicken Mesh Jali With
102 5.00 Nails & Then Application Of 15 Mm Plaster On 35.00 Rmt
R.C.C.& Masonary Joints As Per Dir.Of Engg.In Charge
Providing and laying (To level or slopes) and jointing
reinforced concrete light duty Non-pressure pipes I.S
103 ClassNP2 of the following internal diameter with collars
and butt ends prepared for collar joints including testing
of joints complete.
1.00 300 mm dia 392.00 rmt
1.00 450 mm dia 704.00 rmt
1.00 600 mm dia 941.00 rmt
Constructing chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation, C.C.
channel (1:2:4), finished 15 mm thick cement plaster
inside in CM 1:3 finishing with cement slurry, Brick
masonry in CM 1:5 & excluding the cost of chamber seat
cover etc.completed.
(A) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to
0.90meter for pipe dia <=150mm.
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to
1.20 meter for pipe dia <=20 mm
Constructing Slab Type M.H. Chamber Of The Following
Size Including Excavation, Refilling, Brick Bats Cement
Concrete (1:5:10) of thickness 15 C.M., CC Channel
(1:2:4) of thickness 10 C.M., finished 15 mm thick
cement plaster inside & outside (Only for shaft) In Cm
1:3, Finishing With Cement Slurry, P/F 4 Mm Dia
105 M.S.Steel Hdpe Coated Steps 35 Cm C/C At 35 Cm
Staggered Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of
thickness 15 C.M.,Including Cantering & Reinforcement
(Single jalli at 15 C.M. c/c bothway 10 mm dia.)But
Excluding The Cost Of Manhole Seat Cover
Etc..Completed Of Size 0.75 X 1.00 Meter (Inside Clear,
M.H. length should be parallel to the flow)
1.00 to 2.00 meter depth, (Slab at Ground level) (for
pipe dia <=230 mm)
CatchPit Jali Fixing P/F FRC catch pit jali with frame
106 1.00 600mm x 600mm clear opening etc. comp.. As directed 1384.00 No.
by engineer in charge.
Carting and Fixing M.H., Chamber or Catchpite Seat and
Cover in line and level to match exisisting road level in
107 1.00 C.C. 1:2:4 and finishing smooth, watering and protecting 750.00 No.
for 7 days etc. complete as directed. M.H. seat cover
will be supplied byA.M.C.(from any store)
Making connection to the ex.M.H.in running sewer
incl.Dewatering and other required machinery etc. of
108 following dia pipes at any convenient time. All damaged
work shall be well repaired as per instructions.
2.00 a. 150 mm to 300 mm dia. 1340.00 no
2.00 b. 400 mm to 600 mm dia. 2232.00 no
1.00 c. 700 mm to 900 mm dia. 3125.00 no
Repairing damaged M.H. and rasing M.H. up to road
level incl. removing damaged brick work and repairing
by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and existing MH sheet cover,
removing the debris from MH and carting the same as
3.00 (A) up to 0.15 mt. (@ Two Coarse) 732.00 No
3.00 (B) up to 0.35mt. (@ Four Coarse) 1161.00 No
1.00 (C) up to 0.65 mt. (@ Seven Coarse) 1795.00 No
1.00 (D) up to 0.90 mt. (@ Ten Coarse ) 2161.00 No
Providing and fixing C.I. Manhole cover
110 1.00 M. x 0.45M. size having weight not less than 1119.45 No
Providing F.R.C. MH seat cover incl. carting to the work
site etc. comp. Directed.
(B) Frc Medium Duty Cover Size 670 Mm Dia & 70Mm
2.00 Thick 10 M.T. Load Design And Frame Size560 Mm 884.00 No.
Clear Opening Outer Size 780 X 780 X120 Mm
(C) Frc Medium Duty Chamber Seat Cover (Frc) Cover
2.00 706 X 556 X 50 Mm Rectangular Cover Frame Size 600 X 884.00 No
450 Mm Clear Opening Outer Size 816 X 666 X 100 Mm
Repairing damaged I.C./ Raising removing damaged
brick work and repairing by brick masonry in C.M. 1:5
112 3.00 and plaster in C.M. 1:3 and fixing C.I. steps and existing 402.00 no
chamber sheet cover, removing the debris from
chamber and carting the same as directed.
Providing Dead Cantering using good quality Country
Wood Planks, wall Plate of required thickness and size
including placing the nece. supports of reqd. size,
nailing, fixing with mortar, levelling. All specification for
dead centring as per standard engg. practice etc. comp.
Providing & Supplying JCB Machine on rental basis in
case of emergency situation and break down type work
& also during unavoidable condition as per instruction
of engg.incharge , rate includes all nece. shifting, fuel
114 3.00 and operating charges and stacking of useful & non- 536.00 hour
useful materials separately up to store. (No payment
should be allowed for non working condition of
machinery and for pipe line excavation and laying work)
( Based on Previously approved rate by C E sir
Supplying Pneumatic Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site by using Operator,
fuel, power Supply etc. Complete as Directed. (No
115 3.00 payment should be allowed for non working condition 536.00 hour
of machinery and for pipe line excavation and M.H.
work. Allowed only for break down work) ( Based on
Previously approved rate by C E sir )
Providing and laying red mandana stone as wall coping,
in tread and riser of steps, dado, pillar, seating etc laid
on 10 mm thick cement mortar 1:3 (1 cement : 3 coarse
sand) and joined with matching shade, pigmented
cement slurry including rubbing and polishing complete.
Including making of grooves
3.00 (A) 25 to 30mm thick 1200.00 smt
Supplying labour for misc. work like Restetment
117 15.00 Pavment, excavation, refilling, demolishion,levelling 493.00 No.
work & other miscellanous work.
Supplying Carpentar 2st Class for repairing doors with
118 8.00 nece material like stopper, hinges, handle, glass etc 638.00 No
comp. as per instruction of Engineer in charge etc.
Providing fiiter for D.I./P.V.C./C.I./M./A.C. Pressure
water pipe linmaintenance work with necessary
manpower, tools, plants, and equipments, and any
other works required for AMC as per instruction of
Engineer in charge etc. complete. I03723 As per Market
Providing and fixing 1.20 Metre high fencing with
Metre long M.S. Angle posts 40mm x 40 mm x6 mm and
oil painting 3 coats fixed at 2.5 Mt,C/c. with five
Horizontan lines and two diagonals of galvanised steel
barbed wire weighting 9.38 Kg. per 100 Metre, strained
and fixed to posts with G.I,staples including fixing the
postsin ground with 0.5 M x 0.5.M x 0.5 M. block in
C.C1:5:10 etc comple
Providing & fixing fencing with M.S angle posts
40mm x 40mm x 6mm an oil painting 3 coat fixed at
3 Mt C/C with five Horizontal lines and two
121 10.00 diagonals of galvanized steel barbed wire weighing 303.00 Rmt
9.38 kg.per 100 meter, stained fixed toposts G.I
Sptaples, including fixing the posts in column of
compound wall etc. complete. I00832 wire fencing
Providing, supplying of good quality chharu(made of
brick) and spreading on track of garden, as directed.
Chharu should be made of good quality bricks, it
should be red in colour, free from coal''s dust.
122 5.00 There should not be broken stone, brocken bricks, 800.00 Cu.m
grass, garbedge, in chharu. Item also incl. spreading
of chharu with necessary watering and properly
consolidation with kuba. or as direceted by engg.
incharge etc compl.
Labour charges for cleaning Under Ground & Over head
tanks by modern science technology with six stage
process etc without charging any extra cost. The
complete tank cleaning by mono cleaning systems
comp. as directed. (Approved rate- With reference
to Approved rate in SOUTH Zone)
Supplying of Pavadi tractor with driver having cultivator
124 5.00 and pavadi arragements to roads to remove deposited 350.00 Hour
earth as per given inst. Of engineer in charge.I00802
Providing and fixing stoper (M.S.) 6 inch with necessary
125 3.00 fiting in wooden door including removel of old fiting if 47.00 No
any etc completed as directed. I00870 6 inch
Providing and fixing Aldrop 10 mm size (M.S.) with
necessary fiting in wooden door including removel of
old fiting if any etc completed as directed. I00872
Providing and fixing handle (M.S.) 4 inch size in with
127 5.00 necessary fitting in wooden windows including removal 39.00 No
of old fitting if any etc completed as directed.I00873
Providing and fixing stopper (aluminium) 6 inch with
necessary fiting in wooden door including removel of
old fitting if any etc completed as directed. I00890
Providing and fixing Aldrop 10 mm size (aluminium)
129 5.00 with necessary fiting in wooden door including removel 138.00 No
of old fiting if any etc completed as directed I00891
Providing and fixing handle (aluminium) 6 inch size in
130 5.00 with necessary fitting in wooden door including removal 36.00 No
of old fitting if any etc completed as directed.
Removing any kind of pavement incl stacking of
131 100.00 serviceble material disposal of unserviceble material 14.00 Smt
with 50 meter lead and lift.
Reparing of existing Aluminium window/door/partition
by making necessary addition/alteration in same sides.
Rate incl of necessary fittings required and all labour
132 3.00 included. If necessary rate also incl. of removing from 500.00 no
position and refixing it at same place after repairing it,
etc comp. as directed. Sub Desc : As per approved rate
of AMC MET work I01334
Providing Scaffolding for Demolation , Plaster work &
painting work by "H" Frame Stand of by any means like
bamboo, valli etc. inluding carting material work site
and removing after compltion of work. Rate include any
type rent etc complet for any height as directerd by
engg. incharge.
Rapairing Of Door & Window (Steel).It Also Including
Labour Charges For Erection And Fixing Door
Shutter & Frame Etc.And Necessary Repair As Per Site
Rapairing Of Door & Window (Wood).It Also Including
Labour Charges For Erection And Fixing Door
Shutter & Frame Etc.And Necessary Repair As Per Site
Repairing of Doors/Windows shutters and Frames
including refixing-aligning shutter, providing, replacing,
fixing MS hinges, Aluminium aldrops, stoppers, tadi etc.
complete excluding painting as per specifications.
Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using black trap good
quality aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other areas as
mentioned in the drawing / instruction of engineer in
charge. Cost includes formworks using rubber mould,
Rate providing and laying paver blocks as per required
grading and specification. The paver block shall be
mechanically compacted. The work of paving blocks
shall be executed in line and level by skill mason of
flooring work only. It should be laid in such a way that
the no cutting of the paver block to be necessary. if
cutting of paver block necessary then it should be cut by
machine only and carting. The finished surface of the
paver block shall have resonably good, plain finished.
Paver blocks shall be compacted and shall be relaid if
necessary. Gravel or such type of materials shall not be
allowed for production. Laying on 5 cms thick sand
bedding (As per Road Approved rate)
Providing Special Superior Quality Of Approved
Shape And Size Pre-Cast M20 Cement Concrete
138 2.00 Interlocking Blocks Of 60mm Th. Hydraulically Pressed 262.00 Smt
In Machine Of Single Nature Cement Color For Paving In
Flooring,Footpath Paving,Any Site With In Amc Limit
Providing and laying white/coloured ceramic tiles of 1st
quality of specified size colour shade and of approved
make.(450x450)in cladding with bal adhesive on and
including bedding .coat of plaster in cement mortar
139 5.00 (1:4) all joints filled with coloured / white cement putty 824.00 Smt
as per architect detail and wiped to give shape joint
with flush pointing and washed clean with acid as
direction by e.i.c (rate including fixing of tile in dedo
with bal or approved make adhesive)
Supplying Mistry for misc. work like Restetment
140 5.00 Pavment, excavation, refilling, demolishion, kankaria 692.00 no.
lake front as per instruction of Engineer in charge etc
Supplying and Spreading good quality coarse sand free
141 8.00 from Impurities including Transporation to Site and 650.00 cmt
labour cost for Spreading etc. Comp. as directed.
Supplying Good Quality Bricks of Standard Size for
routine maintainance work - I00689
Pointing on Uncoursed stone masonry with cement
mortar1:3(1-cement:3-coarsesand) (A)Flushpointing
Providing and laying epoxy grout of Bal Endura, laticrete
144 300.00 or equivalent make for filling in groove etc comp. as 183.00 smt
directed. (App. Rate)
White / Colour washing with lime on undecorated wall
surfaces (two coats) to give an even shade including
145 1000.00 thoroughly brooming the surface to remove all dirt, 8.19 Smt
dust mortar drops and other foreign matter.
White washing with lime on wall surfaces (one coats) to
give an even shade including thoroughly brooming the
surface to remove all dirt,dust,mortar drops & other
Finishing Wall With Apex Ultima Acrylic Paint Of " Asian
Paint " Or Equivalent On Wall Surfaces (Two
Coats) To Give Required Even Shade After Application
Of Exterior Primer Of Approved Brand & Manufactures
After Thoroughly Brushing The Surface To Remove All
Dirt & Remains Of Loose Powered Materials.
Wall painting (two coats) with plastic emulsion paint of
approved brand and manufacture on undecorated wall
148 50.00 surface to give an even shade including throughly 78.44 Smt
brushing the surface free from mortar droppings and
other foreign matter and sand papered smooth.
Extra over item for every subsequent coat of wall
painting with plastic emulsion pain of approved brand.
Extra over item 119 for painting with plastic emulsion
paint of approved brand on ceilings and sloping roofs.
Painting two coats (excluding priming coat) on new
steel and other metal surface with enamel paint,
151 50.00 brushing, interior to give an even shade including 86.94 Smt
cleaning the surface an even shade including cleanicn
the surface of all dirt, dust and other foreign matter.
Scraping oil paint from steel and other metal surface
152 150.00 and making the surface even (with Hand Scraping.) 48.83 smt
Painting one coats (excl. priming coat) on peviously
painted steel & other Metal surfacer with enamel
153 150.00 paint, brushing, interior to give an even shade incl. 43.79 Smt
cleaning the surface of all dirt, dust and other foreign
Extra ove ritem 5 and 6 for every sub sequent coat of
Painting two coats (excluding priming coat) on new
wood and wood based surface with enamel paint,
155 50.00 interior to give an even shade including cleaning the 87.11 Smt
surface of all dirt, dust and other foreign matter sand
papering and stopping.
Painting one coats (excluding priming coat) on
previously painted wood and wood based surface with
enamel paint, to give an even shade including cleaning
the of all dirt, dust and other foreign matter.
Extra over item above for every sub sequent coat of
Finishing wall with weather proof exterior emulsion
paint on wall surface (two coats) to give an required
158 10.00 shape even shade after thoroughly brushing the surface 113.40 Smt
to remove all dirt, and remains of loose powdered
materials.etc complete
Distempering with dry distemper of approved brand &
manufacture (twocoats) and of required shade on wall
159 10.00 surfaces to give an even shade over & including priming 46.94 Smt
coat of whiting after thoroughly brooming the surface
free from mortar dropping & other foreign matter.
Distempeing (Two coats) with oil bound distemper of
approved brand and manufacture and of required shade
on wall surfaces to give an even shade, over and
including a priming coat with distemper primer of
approved brand and manufacture after thoroughly
brushing the surface free from mortar dropping and
other foreign matter and also including preparing the
surface even and sand papered smooth.
Extra over Item above for every subsequent coat of
approved brand and manufacture.
Removing dry or oil bound distemper by a washing and
163 10.00 scraping and sand papering the wall surface smooth 11.19 Smt
including necessary repairs to scratches complete.
Extra over item above for removing dry oil bound
164 12.00 distemper on ceilings and sloping roofs. 1.58 Smt
Providing Scaffolding for Demolation , Plaster work &
painting work by "H" Frame Stand of by any means like
bamboo, valli etc. inluding carting material work site
and removing after compltion of work. Rate include any
type rent etc complet for any height as directerd by
engg. incharge.
Arrangement of zula with two or nece. skilled labour
for repairing & maintenance work out side building
166 1.00 work etc.complete as per insructer incharge(At any 950.00 No
Birla or Asian acrylic lapy ( putty)
Applying two coats of putty & two coats of primer
of approved brand and manufacture on new wall
167 5.00 surface to give an even shade including thoroughly 40.19 Smt
brushing the surface free from mortar dropping and
other foreign matter and sand papered smooth.
Providing and fixing Polycarbonate roof Lexan sabic
mm th.sheets of approved make, on structural roofing /
sky ligh structures in shapes as per Architect’s drawing.
The rate shall include cost of scaffolding, screws, nuts,
bolts and all necessary fixtures and fastening etc
ACP CLADDING - Providing and Fixing Alluminium
Composite Panel of (approved make by Architect) 4mm
thick exterior grade PVDF with coil thick of 0.25 mm &
frame work made out from Alluminium anodised
section of size 50 x 25 mm ( w app = 0.57 kg/m) having
weight of 2.6 kg for 15' supported on Masonary/ RCC
with the help of MS Bracket fixed with Brick Fastner/
Anchor Fastner and groove filled with 789 weather
fillent of bowl corning corporation make etc. complete
as per Architect dwg. and as per instruction of E.I.C.
Provinding & fixing with Polymac mecrolone Poly
carbonate sheet 6 mm thick sheet with Garwale green
glass film & joint filling by Astral silicon.Rate also
includes carpenter & skilled hepler at kids city walk way
ramp shade.... as directed by engg.in charge
Providing and fixing frameless glass window using
laminated glass sheet made by two glass sheets joined
with 1.54 mm PVB laminationsheet sandwiched in
171 between them with approved fixing attachments,
making necessary holes, anchor fasteners, edge
grinding, gaskets and sealing the edges with silicon
sealant complete.
2.00 (A) 12 mm thick toughened glass on both sides 7490.00 Smt.
2.00 (B) 8 mm thick toughened glass on both sides 5145.00 Smt.
Hiring and operating the 20 KV 3 Phase Electric
Generator for operating desilting machinery, and
lighting and other requirements with Arranging diesel to
run the D.G. Set Do As Directed. 8 Hrs Shift. (No
payment should be allowed for non working condition
Providing and applying texture paint at approved
quality, colour scheme, including preparation of surface,
primer 2 coats+2 coats of putty and texture paint, as per
manufacture's specification, scaffolding, roller finish etc
complete as per instruction of engineer in charge (As
Providing and fixing Aluminum Composite Panel
signages of various size and in any language. The 2 mm Sq.
thick Aluminum composite panel shall be cladded with Inches
retro reflective high intensity grade radium sheets. The
signages shall be of any language
175 all section partion work including partition , door,
window,vents, etc.as dir. by EIC as per standard sections
lead & lift all floors - anodised min.15 micron any floor
176 4.00 Proving & Fixing 3 mm Th. Acrylic sheet as dir. by EIC. 970.26 Smt
Extra rate over item of excavation of earth for
excavation of asphalt pavement/RCC of thickness up to
0.20 meter including demolishing the asphalt
carpet,metal,soiling /cutting reinforcement etc.comp.
with stacking the material as directed. (based on
previously approved rate by CE sir
a 5.00 up to 0.20 meter thickness (By Manual) 71.10 Smt
Up to 0.30 meter (By any type of Breaker Machine or
b 5.00 R.C.C.Cutter machine including cost of operator, fuel, & 177.76 Smt
transportation etc complete.
Providing and supplying Lowering, laying and jointing ISI
marked only standard length Stonewate pipes in
standard lengths of following class and diameter with
cement joints in C.M.1:1 proportion in proper position
grade and alignment at all level as directed by Engineer-
179 in- charge including conveyance from stone to site of
work, Jointing material etc.comp. including all
taxes,insurance, transportiton, fright charges,
octroi,inspection charges, loading, unloading,
conveyance to departmental stores, stacking etc.
Providing and supplying ISI Standard RCC pipes (of
sulphate resisting Cement )in standard lengths of
following class and diameter suitable for rubber ring
180 joints (socket and spigot) including all taxes,insurance,
transportation,treight charges,octroi,inspection
charges, loading,unloading, conveyance to
departmental stores, stacking etc. complete
Class NP3 Test pressure 0.7 Kg/Sq.Cm
a 15.00 300 mm dia 755.00 Rmt
b 1.00 450 mm dia 1361.00 Rmt
d 1.00 600 mm dia 1946.00 Rmt
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2
of following diameters in proper position , grade and
181 alignment at all level as directed by Engineer-in- charge
including conveyance from stone to site of work, labour
giving hydraulic testing as per ISI code.
Class NP3 Test pressure 0.7 Kg/Sq.Cm
a 1.00 300 mm dia 119.00 Rmt
b 1.00 450 mm dia 171.00 Rmt
d 1.00 600 mm dia 228.00 Rmt
Constructing Chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation,
C.C.Channel (1:2:4), finished 15 mm thick cement
plaster inside in CM 1:3, finishing with cement slurry,
Brick masonary in CM 1:5 & excluding the cost of
chamber seat cover etc..completed.
0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to
0.90meter for pipe dia <=150 mm.
0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to
0.90meter for pipe dia <=230 mm.
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to
1.20 meter for pipe dia <=230 mm
Constructing Slab Type M.H. Chamber Of The Following
Size Including Excavation, Refilling, Brick Bats Cement
Concrete (1:5:10) of thickness 15 C.M., CC Channel
(1:2:4) of thickness 10 C.M., finished 15 mm thick
cement plaster inside & outside (Only for shaft) In Cm
1:3, Finishing With Cement Slurry, P/F 4 Mm Dia
183 M.S.Steel Hdpe Coated Steps 35 Cm C/C At 35 Cm
Staggered Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of
thickness 15 C.M.,Including Cantering & Reinforcement
(Single jalli at 15 C.M. c/c bothway 10 mm dia.)But
Excluding The Cost Of Manhole Seat Cover
Etc..Completed Of Size 0.75 X 1.00 Meter (Inside Clear,
M.H. length should be parallel to the flow)
1.00 to 2.00 meter depth, (Slab at Ground level) (for
pipe dia <=230 mm)
2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From
G.L.) (for pipe dia <=300 mm)
Constructing Slab type M.H. Chamber of the following
size including excavation, refilling, brick bats cement
concrete (1:5:10) of thickness 15 C.M., CC Channel
(1:2:4) of thickness 10 C.M., finished 15 mm thick
cement plaster inside & outside (Only for shaft) in CM
1:3, finishing with cement slurry, P/F 4 mm dia
M.S.Steel HDPE coated steps 35 cm c/c at 35 cm
staggered in masonary CM 1:5, RCC Slab in CC 1:1.5:3 of
thickness 23 C.M., including Cantering & reinforcement
(double jalli at 15 C.M. c/c bothway 12 mm dia.) but
excluding the cost of Manhole seat cover
etc..completed. of Size 1.00 X 1.40 meter (Inside Clear,
M.H. length should be parallel to the flow, for pipe dia
a 1.00 1.00 to 2.00 meter depth, (Slab at Ground level) 10177.68 No
2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From
3.00 to 4.00 meter depth, (Slab at below 1.00 mt. From
Provdg. & laying S.W. Gully trap with brick masonry
185 1.00 chamber & water tight G.T.Stone including fixing of 1127.81 No
cover Square mouth trap 100 mm x100 mm size P-Trap
Making connection to the ex. M.H.in running sewer
incl. Dewatering and other required machinery etc. of
16 following dia pipes at any convenient time. All damaged
work shall be well repaired as per instructions.
a 1.00 a. 150 mm to 300 mm dia. 1339.28 No
b 1.00 b. 400 mm to 600 mm dia. 2232.14 No
Cutting the pipes of following dia coming in the new
M.H.in running sewer including cutting bars,
including removing debris /silt from the M.H. and
carting at a suitable distance etc.complete as directed.
No payment for M.H. work will be made until pipe is not
cut completely in all respect.
a 1.00 150 mm to 300 mm dia. 1133.92 No
b 1.00 400 mm to 600 mm dia. 1687.50 No
Repairing damaged M.H. and rasing M.H. up to road
level incl. removing damaged brick work and repairing
by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and existing MH sheet cover,
removing the debris from MH and carting the same
a 1.00 (A) up to 0.15 mt. (@ Two Coarse) 728.82 No
b 1.00 (B) up to 0.35mt. (@ Four Coarse) 1155.44 No
c 1.00 (C) up to 0.65 mt. (@ Seven Coarse) 1786.49 No
d 1.00 (D) up to 0.90 mt. (@ Ten Coarse ) 2150.90 No
Repairing damaged I.C./ Raising removing damaged
brick work and repairing by brick masonry in C.M. 1:5
188 2.00 and plaster in C.M. 1:3 and fixing C.I. steps and 399.96 No
existing chamber sheet cover, removing the debris
from chamber and carting the same as directed.
Carting and Fixing M.H. Chamber or Catchpite Seat and
Cover in line and level to match exisisting road level in
189 5.00 CC 1:2:4 and finishing smooth, watering and protecting 750.00 No
for 7 days etc. complete as directed. M.H. seat cover
will be supplied byA.M.C.(from any store)
Providing Kachha of Pakka Dummy in the following dia
190 pipes and removing the same after completion of
the connection work as directed.
a 1.00 (A) 100 mm to 300 mm dia. 199.10 No
b 1.00 (B) 350 mm to 600 mm dia 302.67 No
Raising of Existing manhole item includes,cutting of
existing road surround by Manhole by diamond cutter
machine dismantling of road in confined area by
breaker machine and carting of dismantal material.item
also included necessarey brick work to raise the
manhole at road level in CM 1:3 item also included
fixing of Manhole frame at exact road level by using
191 1.00 MaserEmaco S 488 trowable fibre reinforced thixotropic 6815.32 No
repair mortal material Laying of concrete made form
Master Emaco 5 346 flowable micro concrete material
in desired thickness and laying of hot bitumanous
material in Upper layer and compaction of hot
bitumanious material by palte compactor machine .Rate
also included necessary plaster at inside of manhole in
CM 1:3 in 20 MM thickness on raised brickwork.
Supplying, labour for break down repairing work for
activities like excavation, disliting, removing debris from
192 trench back filling etc. comp. as directed by Eng.in
a 30.00 Mazdoor at day /Night 452.00 No
b 15.00 Makadam/ supervision at day / Night 462.00 No
Providing and operation dewatering Pump including
fuel charges & operator Charges etc. as directed etc.
comp. (Shift for Eight Hour) (For Each Pump Set, No
payment should be allowed for non working condition
of machinery) (Based on Previously approved rate by C
Dewatering by pumping set of required capacity
including temporary platform, carting pumping at site
and fixing the same in position including all accessories
and fuel and labour etc.complete
Hiring and operating the 20 KV 3 Phase Electric
Generator for operating desilting machinery, and
lighting and other requirements with Arranging diesel
195 1.00 to run the D.G. Set Do As Directed. 8 Hrs Shift. (No 2500.00 Shift
payment should be allowed for non working condition
of machinery ) (Based on Previously approved rate by C
Providing & Supplying JCB Machine on rental basis in
case of emergency situation and break down type work
& also during unavoidable condition as per instruction
of engg.incharge, rate includes all nece. shifting, fuel
196 10.00 and operating charges and stacking of useful & non- 535.71 Hour
useful materials separately up to store. (No payment
should be allowed for non working condition of
machinery and for pipe line excavation and laying
work) (Based on Previously approved rate by CE sir )
Supplying electric breaker machine for RCC slab or
asphalt demolishing work on site by using operator,
fuel, power supply etc.complete as directed. (no
197 2.00 payment should be allowed for non working condition 1071.42 Shift
of machinery and for pipe line excavation and M.H.
work. Allowed only for break down work) (Based on
Previously approved rate by CE sir )
Supplying Pneumatic Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site by using Operator,
fuel, power Supply etc. Complete as Directed. (No
198 9.87 payment should be allowed for non working condition 535.71 Hr
of machinery and for pipe line excavation and M.H.
work. Allowed only for break down work) (Based on
Previously approved rate by C E sir )
Hiring of tractor with trolley considering 8 Hrs. as
working day hours incl.Driver
Levelling or orientation of existing gully trap chamber
200 2.00 incl. Nece. masonry in CM 1:6 and plaster in CM 1:3 etc. 71.42 No.
using old G.T.stone and cover etc. comp.
Providing F.R.C. MH seat cover incl. carting to the work
site etc. comp. Directed.
(SET cover and frame) F.R.C. Extra Heavy Duty [EHD-35]
a 4.00 Machinehole Covers & Frame- 560mm ø clear opening, 2843.00 Set
The dimension of frame and cover as per mentioned in
(SET cover and frame) F.R.C. Heavy Duty [HD-20]
b 5.00 Machinehole Covers & Frames- 560mm ø clear opening, 2759.00 Set
The dimension of frame and cover
(SET cover and frame) F.R.C. Medium Duty [MD-10]
c 5.00 Machinehole Covers & Frames- 560mm ø clear opening, 1996.00 Set
The dimension of frame and cover
(SET cover and frame) F.R.C. Medium Duty [MD-10]
d 4.00 Chamber Covers & Frame- 600 x 450 mm clear opening, 1911.00 Set
The dimension of frame and cover
(SET cover and frame) F.R.C. Light Duty [LD-2.5]
Chamber Cover & Frame - 600 x 450mm clear
opening,The dimension of frame and cover as per
mentioned in Amend
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
Contractor’s Quoted Rate
IN FIGURE IN WORDS
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Additional City Engineer
mobile no. (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
"South Zone Office", Opp. Fire Station, Rambaug, Maninagar, Ahmedabad - 380
Municipal Commissioner invites online Percentage Rate sealed tenders from interested contractors for
the work mentioned below.
1 Name of work Necessary civil repairing & maintainance work of Existing toilet
blocks and diff. locations inside kankariya parisar in Maninagar
2 Time Limit 12Months(ચોમાસા િસવાય)
3 Tender Validity Period 120 days from the date of submission of the tender
4 Eligibility Criteria Register “E2” class in PWD in Govt. R&B/CPWD/AMC orequivalent
registration with any other state Govt. or institutions.
5 Estimated Cost put to Rs.
6 Earnest Money Deposit Rs.10,000/-Demand Draft Or Bank Guarantee in favour of Municipal
Commissioner, Ahmedabad to be submitted as prescribed in tender.
7 Security Deposit 5 % of the Tender Amount in form of Bank Guarantee / Demand Draft
in favour of Municipal Commissioner, Ahmedabad to be submitted as
prescribed in tender.
8 Tender fees Rs.900/-Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Assistant Manager(South zone), South zone office, Rambaug,
Maninagar Ahmedabad.
10 Tenders issue date Tenders from the amc.nprocure.com website shall be downloaded
from AS PER TENDER NOTICE INVITED
11 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.The
Tenders. tenders received after latest schedule date and time will not be
entertained under any circumstances.
12 Date of Opening As per Notice inviting Tender / Addendum / Corrigendum to
Assistant Manager / Dy.C.E.(S/Z) office, 2nd Floor, South Zone
Office, Opp. Fire Station, Maninagar, Ahmedabad-380008
13 Mode of sending the Document shall be submitted in sealed envelope systems By
TenderDocuments RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate ( One
Original & One Duplicate) duly sign & seal by contractor .
14 Terms, Condition, & All general condition of contract mentioned in tender shall be
Specification applicable.
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at this
own exppence any defect which may developed or may be noticed
before the period mentioned here under from the certified date of
complition, The within 15 days of recipts of the notice. In the case of
failure on the part of the contractor, the Engineer incharge may
rectfyor remove or reexecute the work at the risk & cost of the
contractore. The Engineer incharge shall be entitled to appropriate the
whole or any part of the amount of cicurity deposit towrdes they
expences, If any, incurred by him in rectification, removal or re-
execution. The defect liability period shall be as under (a) for all
works costing up to Rs. 50,000 (amount put to tender), the period shall
be three months from the cirtified date of complition. (b) for all
workscosting more than Rs. 50,000 and upto Rs. 1 crore (Amount put
to tender) ,the period shall be six (6) month from the cirtified date of
compition or one monsoon , which ever letter.(c) the major project
costing more than Rs. 1 crore , the period shall be 12 months from the
cirtified date of complition which should include one monsoon.(d) For
building works , the period specified in (a) ,(b) & (c) above or elapse
of monsoon period following cirtifide date of complition.,whichever is
letter . For the purpose of deciding the monsoon period, the
september may be treated as the last date.
16 Compansation for Delay 0.1% per day delay of remaining work after the completion date but
not more than 10% of cost of remaining works.
17 Deduction of Retention Retention @ 2% of the value of work done will be deducted from each
Money from each RA RA bill. It will be released along with release of payment of Final Bill.
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part Of
Tender And The Same As to be Attached Along With The Tender
19 For E.P.F. Act. As per Account department Circular no.37,date-09/08/2018 &
Circular no.27,date-07/01/2026
20 GST As per AMC Finance Department Circular No. 38 dated 21-11-2022.
The Rates are Exclusive of GST. Prevailing GST will be paid
Conditional tenders will not be accepted. Municipal Commissionerreserves the rights to reject any or
all the tenders without assigning anyreasons thereof.
Seal and Signature of the Bidder Addl City Engineer
13. કો ાકટર ારા ESIC અને EPFO ર શન ગે ના અ. .ુ કોપ . નાણાં ખાતા સર ુ ર નં-૩૭, તા ૦૯-૦૮-૧૮
લ ુ બ ESIC અને EPFO ર
Seal and Signature of the Bidder Addl City Engineer
ForBANK GUARANTEE
Seal and Signature of the Bidder Addl City Engineer (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the latest correction slips may be referred for quality of construction &
standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be taken
to mean as reference to the latest edition of the same of force on the date of agreement.
4. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards
shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out nearest
to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the
site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if proposed
to be adopted by the contractor shall be considered only if the contractor provided
satisfactory evidence that such special mode of construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer in charge shall not
however, absolve the contractor from the responsibility of any adverse effect and
concordance of adopting the same in the course of exaction or completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed under
the "Minor Mineral Act", and such other laws and rules prescribed by the Government
from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on
the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission from
18. The work in general shall be carried out as per standard specifications of the relevant items
to be executed & as per the instruction of Engineer in charge & as per the guidance of
AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on
the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written work
order to the contractor after fullfillng the formality life SD & Agreement. No time
extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation given
by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour shall
26. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water
for drinking, washing, sanitation and cleaning down. The contractor will be responsible for
all the costs where applicable of connection, meter installation, water consumed, water
required for testing purposes, disconnection and the laying, maintenances and ultimate
removal of any distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use
of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax
clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding on
the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease
the scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 15 days from the date if
issue of Letter of Interest (LOI). And after paying the balance S.D. the time limit will be
started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 15 days penalty at the rate of
0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, If work is not started because of monsoon or any other
special reason (like site is not available), after evaluation of situation the actual date of
starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the
39. The payment shall be made as per the A.M.C policy for the work done by the contractor.
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per guidelines
published by WHO/ Center government/State government /Ahmadabad municipal
Signature of contractor with seal Additional City Engineer (S.Z)
Date Ahmedabad Municipal Corporation
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad MunicipalCorporation,
A'bad specified up to his first written demand, without demur without delay andwithout the necessity
of a previous of judicial or administrative procedures and without thenecessity to prove to the Bank
the defects or short comings or debits of the contractor any sumwithin the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effectduring the
period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the
(Date to be specified will not he less than 180 days from the stipulated date of receiving the tender)we
shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consentof the
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tendereror of
Date: Signature & Seal of Guarantor...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender isaccepted
and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E (S.Z) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TENDER DECLARATION FORM
The Deputy Municipal Commissioner,
South Zone, Ahemedabad
Name of Works: -Necessary civil repairing & maintainance work of Existing toilet blocks and diff.
locations inside kankariya parisar in Maninagar ward, Southzone. (ARC).
I/We the undersigned have carefully gone through and clearly understood the Tender documentsfor the
above work. I/We have satisfied myself/ourselves as to the location of site, examined drawings.I/We have
visited site & fully acquainted with local situations regarding materials, labours& others factorspertaining to
work before submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in
accordance with the specification, designs, drawing and instruction in writing referred to in the saiddocument
and with such materials as are provided for, at the respective rates which I/we have quoted in theschedule-B or
at such other rates as maybe fixed under the provisions of these conditions.In the event of this tender being
accepted I/We agree to enter into an agreement and when required andexecute the contract, according to your
fom1 of agreement as or in default where of I/we bindmyself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/WE shall not enter in agreement within ten days or decided by AMC fromthe
date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and takenecessary action
I/We have enclosed a DEMAND DRAFT or PAY ORDER as an “Earnest Money Deposit", for thesum
as mentioned in tender notice, the full value of which is to be absolutely forfeited to the Employer IfI/We fail to
commence the work specified. Otherwise the said sum shall be retained, by the Employer as onaccount of such.
Security)' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other then those that may be approved in accordance
withConditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any tender which you may receive.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date
ofopening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State) ,Sales Tax on work,
octroiduties and other prevailing Government taxes/charges on such items on which the same are leviable and
therates quoted by me/us are inclusive of the same.
Yours faithfully
Signature of the contractor
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ÆÂûtKÍtul - Esluh Ftðþ
1. mbgbgto>t ykdu yuj.ytu.ytR.ytÃgt ctœ 10 rœJm mw^ebtk sÁhe me¾gtuhexe rzvtuÍex Che ðgth ctœ&e dKJtbtkk ytJNu. <ubs
ðgth ctœ Jfo ytuzoh R~gw&gu&e mbtg bgtoœt NY &guje dKtNu.<&t <u mt&u fhthvºt fhJtltu hnuNu. ylu<u bwsc ftb NÁ fhJtle
<theF dKJtbtk ytJNu. yuj.ytu.ytR. ytÃgt ctœ me¾gtuhexe rzvtuÍex ChJtbtkk rœl -15 fh<tk J^w rJjkc ltk rfMmt btk <ubs Jfo
ytuzoh ytvu&e ftb NY fhJtbtkk rJjkc &gu&e «r<rœl bkswh xuLzh hfbltk 0.01 % juFu vulÕxe cej btk&e ftvJtbtk ytJNu. <ub A<tk
rJrNÐ rfMmt btk atubtmt ltk fthKu y&Jt yrlJtgo fthKtumh ftb NÁ &R Nfu <ub l ntug <u rfMmt btk gtuøg<t aftme zu.Bgw.frb©h
(œ.Ítul) le bkswhe bu¤Je ftb NÁ fhJtle <theF dKJtbtk ytJNu.
2. xuLzh Jujezexe 120 r>Jm Mþ^ele hnuNu.
3. xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
4. S.yum.xe. «J<obtl œh «btKu yjd&e awfJJtbtk ytJNu. xuût fu yLg ftuE vK mhfthe fhJuht ChJtle sJtc>the ftuLx[tfxhle
5. htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtle &Nu <u bwsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk
6. juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb Bþsc 1% (yuf xft) hfb cejbtk&e ftve juJtbtk ytJNu.
7. bxehegj xuMxekdltu xuMxekdltu FhuFh &guj Fao ftuLx[tfxh©e vtmu &e Jmwj fhJtbtk ytJNu.
8. ftb ytv<e JF<u su <u ftuLx[tfxhLþk hSMx[uNl ægtlbtk htFelu <ule bgto>tbtk ftb ytvJtbtk ytJNu.
9. yt xuLzh su <u Jdolt btLg gtœe lt ftuLx[tfxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu y.BGþ.ftuvotu.btk btLg ftuLx[tfxhtu le gtœebtk
hSMxuNl fhtJJtLþk hnuNu.
10. yt Wvhtk< y.BGþ.ftuvotu. lt slhj ftuLx[ufx fLzeNl ylu xuLzhle Nh<tu ck^lf<ot hnuNu. su BGþrl.ftuvtuohuNl Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
11. ftuLx[tfxh lu vubuLx - hl´dcej BGþrl.ftuvotu.lt su <u atÕþ mbglt mhfGþjh Bþsc fhJtbtk ytJNu.
12. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
13. xuLzh MJefthÔþ, h> fhÔþ, ftulu ytvÔþ ylu fgt CtJ&e ytvÔþ <u ykdu zu.BGþrl.frbNlh©eltu rlKog ytFhe hnuNu.
14. >huf ytExbltk MvuNeVefuNl ftuvtuohuNlltk bkswh &guj MvuNeVefuNl Bþsc <&t RLzegl MxtLzzo ftuz ytuV «ufxem ltkk btLg ^tht
^tuhKtu Bþsc hnuNu ylu zu.mexe yuLSlegh©eltu rlKog ytFhe hnuNu. Jtuxh´d fhJtbtk lrn ytJu fu >hhtus J^thtltu zucheÍ
WvtzJtbtk lrn ytJu <tu ftuLx[tfxhltk Fauo ylu òuFbu Jdh ltuxemu Jtuxh´d fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e
hfb ftve juJtbtk ytJNu.
15. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftbNY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s yuf s c<tJuj søgtyu fhJwk vzNu. yuf ftb
ÃþÁ &tg vAe cesw ftb NY fheyu <uÔþk atjNu lrn.
16. atÕþ ftbu ftuEvK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEl lu LþfNtl &Nu <tu <ule mkÃËKo
sJtcœthe (òlbtjle) ftuLx[tfxhle vtu<tle hnuNu. mtEx vh ftb œhBgtl bswh fu sl<t lt ftuE btKmlt òlbtjlu lwfNtl &tg
<ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vhegt>&tg <tu <ule sJtc>the vK ftuLx[tfxhle hnuNu. CuFz ^me l vzu <ule sJtc>the
vK vtujem Vhegt>btk ftuLx[tfxhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt,
mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vhegt>btk sJtct>h hnuNu ylu
BGþrl.ftuvtuohuNlltu ftuEvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxÕþk mbSlu s xuLzh ChÔþk. Btswhtultu rJbtu vK W<thtJJtu .
17. juch yufx «btKu<ubs Bgw. frb§h©eltkk vrhvºt lkch 81 <t.26.02.2015bwsc <btb juch / bsqhtulwk dwsht< rcÕzekd yuLz
y^h fLMx[[fNl Jfombtkk VhSgt<hSMx[uNl fhtJJt ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu.
juch yufx «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[tfxh mkÃËKovKu sJtc>th hnuNu. ylu<ulu vubuLx ytvJtbtk ytJNu lrn <ubs
ct¤ bswhtulu ftb Wvh htFe NftNu lrn.<ubs JF<tu JF< Bgw. frBNlh©e îtht fhJtbtkk ytJuj mh¾gwjhtule Nh<tu ftuLx[[tfxhlu
ckk^l f<to hnuNu.
18. ftuEvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobtk hnuNu.
19. ftuE fthKmh òu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuEvK «fthltu LþfNtle- J¤<hltu n¬ >tJtu fhe NfNu lrn
fu ftg>tfeg ftgoJtne yt ykdu &E NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s >uJtLþk Au <uJtu &E NfNu lrn.
20. ytuVh y&Jt xuLzhbtk œNtoJuj ytRxbltu sÚ&tu mkCrJ< sÚ&tu Au subt atjw ftb œhBgtl VuhVth &Jtle N¾g<t hnuje Au.
21. M&¤ vrhÂM&r< / sYhegt< Bþsc ftb fhtJ<t xuLzhbtk sKtJuj fJtuLxexebtk J^ Dx &Nu <tu <u ykdu ftuLx[tfxh îtht ftuEvK «fthle
J^thtle ltKtkfeg btkdKe fhe NfNu lrn. ylu ftb ytuAw &tg <tu ftuLx[tfxhle J¤<hle btkdKe MJefthJtbtk ytJNu lrn.
22. mtEx vh jtJJtbtk ytJuj btjmtbtl hesufx fhJtbtk ytJu <tu ðþhk< r>l-1btk vh< jE sJtltu hnuNu. yLg&t ftuvtuohuNl îtht <u
hesufx btjltu rlftj fhe >uJtbtk ytJNu ylu <ule LþfNtlele sJtc>the ftuLx[tfxhle hnuNu.
23. su ftuLx[tfxh vtmu bswhtultu rJbtu, ydtW&e W<htÔgtu ntug <ublu «t^tLg ytve ftb ytve NfNu.
24. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k
btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch
yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
25. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k
btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch
yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
26. rcÕz´d ftble ytExbtu btxu - slhj xuflefj MvuNeVefuNl ytuV rcÕz´d Jfomle çþf Bþsc yLþmhJtltk hnuNu. Mt>h ÃþM<eft
øþsht< çþf Mxtumo 20-ce, zeMx[ef Ntuv´d, mufxh-21, dtk^eldh&e b¤e hnuNu. su Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
27. bxehegj fu ceò xuMx´d hevtuxo ftuLxtfxhu vtu<tlt Fauo ftuvotuhuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt ykdultu mkÃËKo Fao <&t
Bgwrl.MxtVlu juctuhuxhe Mþ^e <&t buLGþVufah´d søgt Mþ^e jtJJt -jE sJtltu Fao vK ftuLx[tfxhu CtudJJtltu hnuNu.
28. btj su <u Mxtumo Wvh y&Jt mtEx Wvh jtuftulu lz<h l &tg <u he<u MËalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
29. òu BGþ.yuLSlegh´d MxtV sKtJu <tu ftuLx[tfxhu atÕþ ftbu mtEx Wvh zeÍexj fubuht&e ftb atÕþ > vnujt, atÕþ ftbu <&t ftb ÃËKo
>ltk Vtuxtud{tVm BGþrl.yturVmbtk ytvJtltk hnuNu <u rmJtg ftbLþk vubuLx fhJtbtk ytJNu lrn òu MxtV MËalt ytvu <tu fubuhtbtk&e
ftuBÃGþxhbtk Vtuxt x[tLmVh fhe ytvJtlt hnuNu. yt ykdu ftuE vK J^thtltu Fao ytvJtbtk ytJNu lrn.
30. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[tfxh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle btkdKe fhe NfNu lrn. yt
Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
31. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt hnuNu. sgtk ftuE atuFJx l
&E ntug ðgtk ytE.yum.ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk hnuNu. <ubs ftuLx[tfxhu muBvj yu«wÔz fhtÔgt ct> ftb
NY fhtJJtLþk hnuNu.
32. yt xuLzhbtk òu ftuE ytExb hne dE ntug <tu <u atÕþ yum.ytu.yth.btk&e juJtbtk ytJNu ylu òu yum.ytu.yth.btk ytExb l ntug
<tu btfuox huEx&e huEx yultjemem fhe su CtJ Ft<t <hV&e ytvu <u ftuLx[tfxhu juJtltu hnuNu. yt mbSlu s xuLzh ChJtLþk hnuNu.
J^tht le ytRxb btk ftuLx[tfxhle btkdKe Bþsc CtJ b¤Nu lrn.
33. atÕþ ftb >hBgtl «tuxufNlle mkÃËKo sJtc>the ftuLx[tfxhle hnuNu subtk vevzt, >tuhzt, CgMËaf ctuzo, jtj xul , cuhefuxekd xuv,
ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtLþk ylu mtaJJtLþk hnuNu. ylu ftuEvK yfMbt<&Nu <tu <ule mkÃËKo sJtc>the ftuLx[tfxhle hnuNu.
34. MxtV MËalt ytvu <tu mtEx Wvh zuEje «tud{um hSMxh ftuLx[tfxhu htFJtLþk hnuNu. >hhtus ytme.mexe yuLSlegh©ele <ubtk mne
juJtle hnuNu, <ubtk >hhtus ftb fh<t bswhtule mkÏgt, fhuj ftbdehe <&t yr^ftheytuyu ftb Mþ^thJt fu «tud{um J^thJt ltuk^ fhuj
ntug <tu <uLþk ftuBÃjtgLm ytvJtLþk hnuNu ytJe ltuk^ltk sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle
m•tt yuze.mexe yuLSlegh©elu hnuNu <u ykdu ftuLx[tfxh ftuE Jtk^tu jE NfNu lrn.
35. rlg< mbgbgto>tbtk ftb ÃþY l &gu&e xuLzh ¾jtuÍ bwsc ctfe ftbltkk 10.00% juFu vulÕxe BGþrl.ftuvtuohuNllu åþfJJtle hnuNu.
36. xuLzh le yt Nh<tu ce - 1 Vtubobtk sKtJuj Nh<tulu ytuJhYj fhNu.
Wvhtuf<<btb Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkauj Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mne - rm¬tu yuze.mexe Rsluh
btuctEj lkch mt&u (œrûtK Ítul)
(1)nwk/ybuyt&eyufhthfhwk Awk/fheyu Aeyu fu ytxuLzhhswfh<tkvnujtkbuk/ybu M&¤le bwjtft<je^e Au
yluftblujd<t btjmtbtl, bswheyluceSctc<tulujd<e M&trlfvrhrM&r<le ò<-btne<e bu¤Je Au.
(2)nwk/ybuyt&eyufhthfhwk Awk/fheyu Aeyu fu ytftuLx[tfxhtule Nh<turJd<tuyluxuLzhlujd<t
>M<tJustuft¤SvwJofyÇgtmfgtuo Au ylu<u bwsc<ultuybjfhJtmkb< Awk/Aeyu.
ftuLx[tfxhlemne - rm¬tu yuze.mexeyuLSlegh
btuctEjlkchmt&u (œrûtKÍtul)
" yb>tJt> BGþrlrmrvj ftuvtuohuNl”
œrûtK Ítul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
" yt ftblt >huf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE ytExbltu CtJ
J^thtu ytvJtbtk ytJNu lrn. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu. <uJe >huf ytExbbtk J^^x
&tg fu ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle J¤<hle btkdKe fhJtle hnuNu lrn fu
CtJ J^thtu, vK ytvJtltu &Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb
fhJtle ûtb<t ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, r>Jt¤e, jøl
meÍl fu yLg <nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn
yLg&t htuslt Yt.250.00le J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk
ftuLx[tfxhle mne yuze.mexe.yuLS.
rm¬t ylu btuctEj lkch (œrûtK Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be as per tender notice after the order to start the works. Progress
of work should be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as
per design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for inspection by
Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall be
made to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of
binding vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be
final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the rejected
materials shall be removed from site within 24 hours by contractor at this risk and cost. Debris shall
have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall
have to prepare through of bigger size and mix the mortar in the required proportion. In on case he
shall be allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to
make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest
SOR or if item is not available in SOR than based on current market rates. In case of extra item
decision of Add.CityEngg.shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra and
the contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim
for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors
shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor
will be fully responsible for compliance of the various provisions under contract Act. 1970 and the
Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of
the tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on
his own during the period. If any tenderer withdraw or makes any modifications or addition in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If work is not started within specified time limit i.e. within ten days from the date of order to
start the work the penalty of the 0.01% tender Amount per day of delay of start shall be recovered
separately from the immediate bills payable to the contractor. Contractor has to make his own
arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully :-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
iv) Condition of Form - B1 only Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept. -
Govt. of Gujarat booklets of Building Works & and Road Works Specifications published by
Gujarat Book Depot, Sector-21. Gandhinagar. Other techinical condition will be applicable as
per tender condition only.
CONTRACTOR'SSIGNATURE & STAMP ADD. CITY ENGINEER
Mobile No.:- (South Zone)
For materials relevant specification of Building Specification shall apply.
Name of Works: - Necessary civil repairing & maintainance work of Existing toilet blocks and diff.
locations inside kankariya parisar in Maninagar ward, Southzone. (ARC).
TECHNICAL SPECIFICATIONS
Item No 1 :-Demolition incl. stacking of serviceable materials & disposal of unserviceable materials
with all lead and lift.
(B) Brick work in cement
(D) Tiles or Stone flooring
(E) Sheet roofing (G.I or
(F) Doors ,Windows
1.0 Mode of measurements &payment :
1.1 The unserviceable materials shall be disposed of at all leads and lifts. The rate excludes scraping
straightening of reinforcement but includes cutting of reinforcement.
1.2 The rate shall be for a unit of one cubic metre
(b) Brick work in cement mortar
1.0 Workmanship :
1.1 The demolition shall consist of demolition of one or more parts of the building as specified or
shown in the drawings. Demolition implies taking up or down or breaking up. This shall consist of
demolishing whole or part of work including all relevant item as specified or shown in the drawings.
1.2 The demolition shall always be planned before hand and shall be done in reverse order of the one
in which the structure was constructed. This scheme shall be got approved from the Engineer-in-
charge before starting the work. This however will not absolve the contractor from the
responsibility of proper and safe demolition.
1.3 Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining
work or property, which is to be left intact, before dismantling and demolishing is taken up and the
work shall be carried out in such a way that no damages is caused to the adjoining property.
1.4 Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary
precautions shall be taken to keep the dust nuisance down as and where necessary.
1.5 Dismantling shall be commenced in a systematic manner. All materials which are likely to be
damaged by dropping from a height or demolishing roof, masonry etc. shall be carefully dismantled
first. The dismantled articles shall be properly stacked as directed.
1.6 All materials obtained from demolition shall be the property of Government unless otherwise
specified and shall be kept in safe custody until handed over to the Engineer-in-charge.
1.7 Any serviceable materials, obtained during dismantling or demolition shall be separated out and
stacked properly as directed, with all lead and lift. All unserviceable materials, rubbish etc. shall b
stacked as directed by the Engineer-in-charge.
1.8 On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
1.9 The relevant specifications of shall be Above followed except that demolition of R.C.C. work is to
2.0 Mode of measurements & payment :
2.1 Measurements of all work except hidden work shall be taken before demolition dismantling and no
allowance for increase in bulk shall be allowed. The demolition of lime concrete shall be measured
under this item. Specification for deduction for voids, openings etc. shall be on same basis as that
employed for construction of work.
2.2 All work shall be measured in decimal system as fixed in its place subject to the following limits,
unless otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest 0.01 mt. (b)
Area shall be worked out to the nearest 0.01 sq. mt. (c) Cubical connection shall be worked out to
the nearest 0.01 Cu.m.
2.3 the rate shall include cost of all labour involved and tools used in demolishing and dismantling
including scaffolding. The rate shall also include the charges for separating out and stacking the
serviceable materials properly and disposing the unserviceable materials with all lead and lift. The
rate also includes for temporary storing for the safety of the portion not required to be pulled down
or of adjoining property and providing temporary enclosures or partitions where considered
2.4 The relevant specification of above shall be followed except that the demolition of reinforced
concrete structure. The unserviceable materials shall be disposed of at all leads and lifts. The rate
excludes scraping straightening of reinforcement but includes cutting of reinforcement.
The rate shall be for a unit of one cubic metre.
(d) tiles or stone flooring
(e) Sheet roofing (G.I OR A.C)
1.00 Mode of measurement &Payment :
1.01 The rate shall include stacking the unserviceable materials as directed will lead and lift.
1.02 The rate shall be for a unit of one sq. meatier
(f) Doors ,Windows ventilators (wood/steel)
1.00 Mode of measurement &Payment :
1.01 The rate shall include stacking the unserviceable materials as directed will lead and lift.
1.02 The rate shall be for a unit of one No.
Item NO 2 :- Dismantling barbed wire fencing / Chainlink Fencing including making rolls and also
including dismantling fanning posts including all earth work concrete in the base
and making good the disturbed ground stacking unseal materials as directed and
disposing all the unserviceable materials with all leads al lifts & carting to AMC Store as
directed by engg. in charge [Bld. SOR 15-16;it:-20.51.page no-
2.0 Mode of measurement & payment:
2.1 The rate including making roll of dismantled wire and including dismantling
fencing posts concrete work in case and making good the distillated ground etc,
2.2 The serviceable materials shall be stacked as and where directed and the
unserviceable materials shall be disposed with all leads and lifts.
2.3 The rate shall be for unit of one running meter.
Item NO 3 :- Excavation for foundation in any types of soil including sorting out and stacking of useful
materials and disposing off the excavated stuff upto 50 Meter lead and required left
(Bldg.s.o.r.2015-2016,it. No.0.1 Ch- 4 )
(a) 0 to 1.5 mtr depth
(b)1.5 to 3.0 mt. depth.
(c)3.0 to 5.0 mt. depth
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any
such ordinary excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall
under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone,
materials and rubbish of all kind, bush, wood and trees shall be removed as directed. The
materials so obtained shall be property of the Government and be conveyed and stacked as
directed. within 100 M. lead. The roots of the trees coming in the sides shall be cut and coated with
The rate of site clearance is deemed to be included in the rate of earth work for which no extra
Setting Out :After clearing the site, the center lines will be given by the Engineer-in-charge. The
contractor shall assume full responsibility for alignment, elevation and dimension of each and all
parts of the work. Contractor shall supply laborers, materials, etc. required for setting out the
reference marks and bench marks and shall maintain them as long as required and directed.
Excavation :The excavation in foundation shall be carried out in true line and level and shall have the
width and depth as shown in the drawings or as directed. The contractor shall do the necessary
shoring and shutting or providing necessary slopes to a safe angle, at his own-cost. The payment
for such precautionary measures shall be paid separately if not specified. The bottom of the
excavated area shall be 1 evened both longitudinally and transversely. as directed by removing
and watering as required. No earth filling will be allowed for bringing it to level, if mistake or any
other reason excavation is made. deeper or wider that shown on the plan or directed. The extra
depth or width shall be made up with concrete of same proportion as specified for the foundation
concrete at the cost of the contractor. The excavation up to 1.5 m. depth shall be measured under
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the
ground in layer including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from the site of
work to a place as directed with lead upped 50 M. and all lift.
Mode of measurement and payment :
6.1 The measurement of excavation in trenches for foundation shall be made according to the sections
of trenches shown on the drawing or as per sections given by the Engineer-in-charge. No payment
shall be made for surplus excavation made in excess of above requirements or due to slopping
and sloping back as found necessary on account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Item No 4:- Provdg. & laying cement concrete 1:5:10 (1 cement : 5 fine sand : 10 graded brick
aggregates 40 mm nominal size) and curing complete, excluding cost of form work in
(Bldg.Sor 2015-16,item no.5.3.8,page no-49)(A) Foundation and plinth
Water shall conform to M-1, sand shall conform to M-6. Cement shall conform to M-3. Brick bats shall
conform to M-14.
The relevant specification of item No. 5.3.4 shall be followed except that brick bats aggregate shall be
used instead of stone aggregate.
Mode of measurement and payment :
The relevant specification of item No 5.3.4 shall be followed
The rate shall be for a unit of one cubic meter.
Water shall conform to M-1. Sand shall conform M-6. Cement shall conform to M-3. Stone aggregate
mm. nominal size shall conform to M-12.
2.0. Workmanship :
2.1.1. Before starting concrete bed of foundation treaches shall be cleared of all loose materials, leveled,
watered, and rammed as directed.
Proportion of Mix :
The proportion of cement, sand and coarse aggregate shall be one part of cement, 3 parts of sand, 6 parts
of stone aggregates and shall so measured by volume.
The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may however be
allowed for smaller quantity of work if approved by the Engineer-in-charge. When hand mixing is
permitted by the Engineer-in-charge incase of break-down of machinery’s and in the interest of the
work. it shall be carried out on a water tight platform and care shall be taken to ensure that mixing
is continued until the mass is uniform in colour and consistency. However in such cases 10% more
cement than otherwise required shall have to be used without any extra cost. The mixing in
mechanical mixer shall be done for a period 1 to 2 minutes. The quantity of water shall be
sufficient to produce a dense concrete of required workability for the purpose.
Transporting & Placing the concrete :
The concrete shall be handled from the place of mixing to the final position in not more than 15 minutes by
the method as directed and shall be placed into its final position, compacted and finished within
minutes of mixing with water i.e. before the setting commences.
The concrete shall be laid in layers of 15 cms. to 20 cms.
The concrete shall be rammed with heavy iron rammers and rapidly to get the required compaction and to
allow all the interstriees to be filled with mortar.
After the final set, the concrete shall be kept continuously wet, if required by pounding for a period of not
less than 7 days from the date of placement.
2.7. Mode of measurement and payment :
The concrete shall be measured for its length breadth and depth, limiting dimensions to those specified on
plan or as directed.
The rate shall be for a unit of one cubic meter.
Item No 5 :- Provdg. & laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 hand broken
stone aggregates 40 mm nominal size) and curing complete excluding cost of form work in.
(Bldg.Sor 2015-16,item no.5.3.4,page no-49) (A) Foundation and plinth
a)Foundation and plinth building
Water shall conform to M-1, Cement shall conform to M-3. Sand shall conform to M-6. Stone aggregate
mm. nominal size shall conform to M-12.
The relevant specification of item No 5.3.2.(A) shall be followed for the work except that the work is to be
carried out in cement concrete 1:5:10.
Mode of measurement and payment :
The concrete shall be measured for its length, breadth and depth. limiting dimensions to those specified
on plans or as directed.
The rate shall be for a unit of one cubic meter
Item No 6 :- Providing & Applying Tremix method ( Vaccum de extracted & Powered trowelled ) for
Concrete Flooring with necessary finishing either smooth or wire finish as approved by
consultants. Rate shall includes the rate of side shuttering with channel , rails to form
panels etc. complete.
As Per Item & instructed by Engineer-incharge
The measurement shall be given in one smt basis
Item No 7 :- Providing and laying controlled cement concrete M-200 and curing complete,
excluding the cost of form work and reinforcement for reinforced concrete work in:
(Bldg.Sor 2015-16,item no.5.8.,page no-57) .
(A) Foundations, footings, base of
columns, and mass concrete.
(B) Walls from top of
foundations/level up to floor two
(C) Slabs, landing shelves, Balconies,
lintels, beams, girders, and
cantilever, up to floor two level.
(D) Columns, pillars, posts, and
struts, up to floor two level.
(E) Staircase up to floor two level.
(K) Vertical and horizontal fins up to
floor two level.
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6.
Grit shall conform to M-8. Coarse aggregate shall conform M-12 B.
The relevant specifications of item no. 5.4.1 of ordinary concrete shall be
followed except that the concrete mix shall be designed from preliminary tests, the proportioning of
cement and aggregates shall be done by weight and necessary precautions shall be taken in the
production to ensure that the required work cube strength is attained and maintained. The
controlled concrete shall be in grades of M-100, M-150, M-200, M-250, M-300, M-350, M-400, with
prefix controlled added to it. The letter ‘M’ refers to mix and numbers specify 28 days works cube
compressive strength of 150 mm cubes of the mix expressed in Kg. / Cmt.
The porportion of cement, sand and coarse aggregates shall be determined by weight. the
weight batch machine shall be used for maintaining proper control over the porportion of
aggregates as per mix design.
The strength requirements of different grades of concrete shall be as under:
Compressive strength of 15 cms 28 days
cubes in Kg./Cmt. at
conducted in accordance Preliminary test
Grade of with I.S. 516-1959
Concrete Work test
In all cases, the 28 days compressive strength specified in above table above be the criteria for
acceptance or rejection of the concrete.
Where the strength of a concrete mix as indicated by tests, lies in between the strength of any two
grades specified in the above table such concrete shall be classified in for all purposes as concrete
belonging to the lower of the two grades between which its strength lies.
The proportions for ingredients chosen shall be such that concrete has adequate workability
for conditions prevailing on the work in question and can be properly compacted with
means available except where it can be shown to the satisfaction of the Engineer-in-
charge, that the supply of properly graded aggregate of uniform quality can be maintained
till the completion of work. Grading of aggregate shall be controlled by obtaining the coarse
aggregates, in different sizes and being in them in the right proportions as required.
Aggregate of different sizes shall be stocked in separate stock piles. The required quantity
of material shall be stock piled several hours, preferably a day before use. The grading of
coarse and fine aggregate shall be checked as frequently as possible, the frequency for a
given job being determined by the Engineer-in-charge to ensure that the suppliers are
maintaining the uniform grading as approved for samples used in the preliminary tests.
In proportioning concrete, the quantity of both cement and aggregate shall be determined by
weight. Where the weight of cement is determined by accepting the maker’s weight per
bag a reasonable number of bags shall be weighted separately to check the net weight.
Water shall either be measured by volume in calibrated tanks or weighed. All measuring
equipments shall be maintained in clean and serviceable condition. Their accuracy shall be
periodically checked.
In is most important to keep the specified water cement ratio constant and at its correct value.
To this end, moisture content in both fine and coarse aggregates shall be determined by
the Engineer-in-charge, according to the weather conditions. The amount of mixing water
shall then be adjusted to compensate for variations in the moisture content. For the
determination of moisture content in the aggregates, I.S. 2389(Part III) shall be referred to.
Suitable adjustments shall also be made in the weights of aggregates due to variation in
their moisture content. Minimum quantity of cement to be used in concrete shall not be less
than 220 Kgs./M 3 in plain concrete and not less than 250 Kg/M3 in reinforced concrete.
Mode of measurement and payment:
The relevant specifications item No. 5.4.1 shall be followed except that the controller concrete
R.C.C. work for work as specified in item shall be measured under this item. The rate
excludes cost of form work.
The rate shall be for a unit of one cubic meter
Item No 8 :- Filling In Plinth With Sand Under Floors Including Watering,Ramming,Consolidating
And Dressing Etc. Completed. (P.41,Ch.4, Item.No.4.24-0.0)I00055
Sand shall conform to M.
The sand to be used for filling shall be free from salts, organic or other foreign matter, All clods of
earth shall be broken.
As soon as the work in foundation has been completed and measured, the site of foundation shall
be cleared of all debris, brick bats, mortar dropping etc; and filled with sand in layers not exceeding
20 Cms. Each layer shall be adequately watered rammed and consolidated before the succeeding
layer is laid. The sand shall be rammed with iron rammers where feasible and with the butt ends
of crow-bars, where rammer cannot be used.
The plinth shall be similarly filled with sand in layers not exceeding 20 Cms adequately watered
and consolidated by ramming with iron or wooden rammers. When nfilling reaches finished level,
the surface shall be flooded with water for at least 24 hours and allowed to dry and then rammed
and consolidated.
The finished level of filling shall be kept to shape intended to be given to floor.
In case of large heavy duty flooring like factory flooring, the consolidation may be done by power
rollers, where so specified. The extent of consolidation required shall also be as specified.
Mode of measurement and payment :
The payment shall be made for filling in plinth and trenches, No deduction shall be made
for shrinkage or voids if consolidated as instructed above
The rate includes cost of collecting carting sand with all lead and labour for filling the same in plinth
The rate shall be for a unit of one cubic meter.
Item No 9 :- Filling Available Excavated Earth (Excluding Rock) In Trenches,Plinth,Sides Of
Foundations Etc.In Layers Not Exceeding 20 Cm.In Depth Consolidation Each Deposited
Layer By Ramming And Watering.(P.15,Ch.4, Item.No.4.12)
The earth obtained from excavation shall be filled in layers not exceeding 20 cms. in depth and
water thoroughly after each layer and shall be properly consolidated with rammers so that no
hollow voids remain there. In general the work shall be carried out in the best manner so that no
hollow voids remain after work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Item No 10 :- Filling In Foundation And Plinth With Murrum Or Selected Soil In Layers Of 20 Cm.
Thickness Including Watering, Ramming A n d Consolidating Etc . Complete. (P.15,Ch.4,
Item.No.4.24-0.0)I00056
Filling in foundation and plinth with murrum or selected soil shall be filled in layers not
exceeding 20 cms. in depth and water thoroughly after each layer and shall be properly
consolidated with rammers so that no hollow voids remain there. In general the work shall
be carried out in the best manner so that no hollow voids remain after work. Workmanship
in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Item No 11 :- Providing form work in ordinary timber planking so as to give a rough finish including
centering, shuttering, strutting and propping etc. height of propping and centering below
supporting floor to celling not exceeding 4 M & removal of the same for in situ reinforced or
plain concrete work in (Bldg.Sor 15-16 ,,item no.9.1,page no-99 )
(A) Foundation, footings, bases of columns etc. and mass concrete.
(B) Flat surface such as soffits of slabs, landing and the like
(I) Floors etc. 200 mm in thickness.
(C) Vertical surfaces such as walls (any thickness) partitions.
g1. Columns, pillars, posts & struts.(1)Square, rectangular, polygonal in plan
2. Columns, pillars, posts & struts.(2)Circular or curved in plan.
h(1) Sides and soffits of beam, haunchings cantilevers, girders, bressumers and
lintels not exceeding 1 M in depth.
(2) Sides and soffits of beam, haunchings cantilevers, girders, bressumers and lintels
exceeding 1 M in depth.
(L) chullah hoops, weather sheds, chhajas, carbelsetc including edges.
(M) Staircase with-sloping or stepped soffits incl. risers & strings excluding landing.
(Q) Vertical fins and vertical sun breakers.
The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
The dimensions of scantlings and battens shall conform to the design. The strength of the
wood shall not be less than that assumed in the design.
The form work shall conform to the shape lines and dimension as shown on the plans
and be so constructed as to remain sufficiently rigid during the placing and compacting of the
concrete. Adequate arrangements shall be made by the contractor to safe guard against any
settlement of the form work during the course of concreting and after concreting. The form work of
shuttering, centering, scaffolding bracing etc shall be as per design.
Cleaning & Treatment of forms:
All rubbish, particularly chippings shaving and saw dust shall be removed from the
interior of the form before the concrete is placed and the form work in contact with concrete shall
be cleaned and thoroughly wetted or treated. The surface shall be then coated with soap solution
applied before concreting is done. Soap solution for the purpose shall be prepared by dissolving
yellow soap in water to get consistency of paint. Alternatively a coat of raw linseed oil or form oil of
approved manufacture may be applied in case steel shuttering is used. Soap solution or raw
linseed oil shall be applied after thoroughly cleaning the surface. Care shall be taken that the
coating does not get on construction joint surface and reinforcement bars.
Stripping time:
In normal circumstances and where ordinary cement is used forms may be struck after expiry
of following periods:
Sides of walls columns and vertical faces of beam 24 to 48 hours.
Beams soffits (Props left under) 7 days.
Removal of props slabs
(i) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 mm 14 days
Removal of props to beams and arches
(i) Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
2.4 Procedure when removing the form work:
All form work shall be removed without such shock or vibration as would damage the
reinforced concrete surface. Before the soffits form work and struts are removed, the soffits and
the concrete surface shall be exposed where necessary in order to ascertain that the concrete has
sufficiently hardened.
The centering to be provided shall be got approved. It shall be sufficiently strong to ensure
absolute safely of the form work and concrete work before, during and after pouring concrete.
Watch should be kept to see that behavior of centering and form work is satisfactory during
concreting. Erection should also be such that it would allow removal of forms in proper sequence
without damaging either the concrete or the forms to be removed.
The props of centering shall be provided on firm foundation or base of sufficient strength to
carry the loads without any settlement.
The centering and form work shall be inspected and approved by the Engineer-in-charge
before concreting. But this will not relieve the contractor of his responsibility for strength, adequacy
and safety of form work and centering. If there is a failure of form work or centering, contractor
shall be responsible for the damages to the work, injury to life and damage to property.
All scaffolding, hoisting arrangements and ladders etc required for the facilitating of
concreting shall be provided and removed on completion work by contractor at his own expense.
The scaffolding, hoisting arrangements and ladders etc. shall be strong enough to with stand all
live, dead and impact loads expected to act and shall be subject to the approval of the Engineer-in-
charge. However, contractor shall be solely responsible for the safety of the scaffolding, hoisting
arrangement, ladders, work and workman etc.
The scaffolding hoisting arrangements and ladders shall allow easy approach to the
work spot and afford easy inspection.
The rate is applicable to all conditions of working and height up to 4 mts. The rate shall
include the cost of materials and labour for various operations involved such as:
Splayed edges, notching, allowance for overlaps and passing at angles, battens
centering, shuttering propping, bolting, nailing, wedging, easing, striking and removal.
Filleting to form stop chamfered edges or splayed external angles not exceeding 20 mm
width to beams, columns and the like.
Temporary openings in the forms for pouring concrete, if required, removing rubbish etc.
Dressing with oil to prevent adhesion of concrete with shuttering, and
Raking or circular cutting.
Before re use all forms shall be inspected by Engineer-in-charge and their suitability
ascertained. The forms shall be scarred, cleaned, and joints gone over, repaired where required.
Inside surface shall be retreated to prevent adhesion of concrete.
Mode of measurements & payment:
Form work shall be measured as the area in square meters of shuttering in contract with
concrete except in the case of inclined member and portion of curved profile and upper side in
which case only area of underside shall be measured for payment.
Form work to secondary beams shall be measured up to the sides of main beams but no
deduction shall be made from the form work of the main beam at the inter section point. No.
deduction shall be made from the form work of a column at inter section of beams.
The rate is for the completed item.
The rate shall be for a unit of one Sq. meter
Item No 12 :- Provdg. & laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregates 20 mm nominal size) and curing complete excluding cost of form work and
reinforcement for reinforced concrete work in (P.49,Item No.5.4.1 sor-15-16)
(A) Foundations, footing, of columns and mass concrete
(B) Slabs, landings, shelves, balconies, lintels, beams, girders and cantilever upto floor two
(D) Columns pillars, posts & struts upto floors two level.
Materials & Workmanship
1.1 The relevant specification of item No. 5.3.13 shall be followed except that the work shall be carried out
for reinforced concrete work for work as specified in item 1.2. In addition, the following stipulations
shall be followed for :
1.2 The bars shall be kept in position by the following methods:
(i) In case of beam and slab construction, sufficient number of precast cover blocks in cement mortar 1:2
(1 cement : 2 coarse sand) about 4 cms x 4 cms
section and of thickness equal to the specified cover shall be placed between the bars and shuttering as to
secure and maintain the requisite cover of concrete over the reinforcement.
In case of cantilevered or doubly reinforce beams of slabs, the main reinforcing bars shall be held
in position by introducing chain spacers or supports bars at 1.0 to 1.2 meters centers.
(ii) In case of columns walls, the vertical bars shall be kept in position by means of timber temphtes with
slotes accurately out in them. The temphtes shall be removed after concreting has been done
below it. The bars may also be suitably tied by means of annealed steel wires to the shuttering to
maintain their position during concreting.
1.2 All bars projecting from pillars, columns beams, slabs etc., to which other bars and concrete are to be
attached or bounced to later on, shall be protected with a coat of thin neat cement grout, if the bars
are not likely to be incorporated with succeeding mass of concrete within the following 10 days.
This coat of thin neat cement shall be removed before concreting.
2.0 Mode of measurement and payment:
2.1 Relevant specifications of item No. 5.3.13 shall be followed.
2.2 The volume occupied by reinforcement shall not be deducted from R.C.C. work.
2.3 The rate shall be for a unit of one cubic meter.
Item No 13 :- Providignthermo Mechanically treated bars (RNT EARS) confirming to IS 786/FC
for R.C.C works includingsbendings, binding and placing in position complete upto floor
two level.(Bldg.Sor 15-16,item no-5.4.11,page no-53)
The specification of the above item can be available from Ch.5, pg.no.29 to 42, “ General Technical
Specifications for Building Works ” Book published by Gujarat Book Stores (P) Ltd, Sector-21,
Gandhinagar or It can be downloaded from www.egovamc.com.
Mode of Payment:
The payment for this item shall be done in Kg basis.
Item No 14 :- Brick Work Using Common Burnt Clay Building Bricks Having Crushing Strength
Not Less Than 35 Kg/Sq. Cm. In Cement Mortar 1:6 (1 Cement : 6 Fine Sand) ((Bldg.Sor 15-
16,item no.6.13-,page no-83) A) In foundation and Plinth
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6. Brick shall
conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 6 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about
two hours before use or as directed. The cessation of bubbles, when the bricks are wetted with
water is an indication of through wetting of bricks.
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not
be used except when necessary to complete to bond; closer in such case shall be cut to required
size and used near the ends of walls.
A layer of mortar shall be spread on full width for suitable length of the lower course.
Each brick shall first be properly bedded and set home by gently tapping with handle of trowel or
wooden mallet. It side face shall be flushed with mortar before the next brick is laid and pressed
against it. On copletion of course, the vertical joints shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal
and all vertical joint shall be truly vertical. Vertical joints in alternate course shall generally be
directly one over the other. The thickness of brick course shall be kept uniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden
straight edges, mason’s sprit level, square half meter rub, and pins, string and plumb shall be kept
on the site of work for frequent checking during the progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper
place. All the connected brick work shall be kept not more than one meter over the rest of the
work. Where this is not possible, the work shall be raked back according to bond (and not left
toothed) at an angle not steeper than 45 degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are
required to be built in wall shall be embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins
shall not exceed 12 mm. The face joints shall be raked out as directed by taking tools daily during
the progress of work, when the mortar is still green so as to provide key for plaster or pointing to
The face of brick shall be cleaned the very day on which the brick work is laid
and all mortar dropping removed.
2.5.1 Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces
for a period seven days. The top of masonry work shall be kept well wetted at the close of the day
Preparation of foundation bed:
2.6.1 If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of all
loose materials, cleaned and wetted before starting masonry. If masonry is to be laid on concrete
footing, the top of concrete shall be cleaned and moistened. The contractor shall obtain the
engineer'’ approval for the foundation bed, before foundation masonry is started. When puccas
flooring is to be provided flush with the top to plinth, the inside plinth offset shall be kept lower than
the outside plinth top by the thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in
foundation up to plinth. The limiting dimensions not exceeding those shown on the plans or as
directed shall be final. Battered, tapered and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment
made for embedding in masonry or making holes in respect of following items:
(1) Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross
sectional area does not exceed 500 Sq. cm.
(2) Opening not exceeding 1000 Sq. cm.
(3) Wall plates and bed plates, bearing of slabs, chhajasan the like whose thickness does not exceed
10 Cms. and the bearing does not extend to the full thickness of wall.
(4) Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows
(5) Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and
pipes etc. for concealed wiring.
(6) Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make
splaying of jambs, throating and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Item No 15 :- Extra for brick work in superstructure . (A) Item No 6.13(page no-87,06007B2)
As Per Item & instructed by Engineer-incharge
The measurement shall be given in one cmt basis
Item No 16 :- .Half Brick Masonry In Common Burnt Clay Building Bricks Having Crushing
Strength Note Less Than 35 Kg/Sq. Cm. In Cement Mortar 1:4 (1 Cement : 4 Coarse
Sand) In Foundation and plinth .(P.87,Ch.6,Item No.6.3,06008A2)
1.0 Materials: Brick shall conform to M-15. Water shall conform to M-1. Cement shall conform to M-3.
Sand shall conform to M-6. Cement mortar shall conform to M-11.
2.0 Workmanship:
2.1 Relevant specifications of bricks, wetting and laying of bricks, joints, curing etc. shall conform to
item No 6.19 (A) except the brick work of half bricks shall be carried out.
2.2 Cement mortar used in masonry work shall be in proportion of 1 part of cement and 4 part of sand
2.3 All bricks shall be laid strecher wise, breaking joints with those in the upper and lower courses.
The wall shall be taken truly plumb. All courses shall be laid truly horizontal and all vertical joints
shall be truly vertical. The bricks shall be laid with frogs upwards. A set of masons tools shall be
maintained on work as required for frequent checking.
3.0 Mode of measurement and payment:
3.1 The half brick masonry work in foundation and plinth shall be measured under this item, the
limiting dimensions shall not exceed those shown in the plan or as directed. Any work done extra
over the specified dimensions shall be ignored.
3.2 The relevant specifications of item No. 6.12 shall be followed. The length shall be measured
nearest to one Cm.
3.3 The rate shall be for a unit of Sq. Mt.
Item No 17 :- Extra for Half brick work Super Structure Upto Floor Two Level.(P.91,Ch.6.,Item
As Per Item & instructed by Engineer-incharge
The measurement shall be given in one smt basis
Item No 18 :- Providing cement plaster in single coat on brick/concrete wall for interior/exterior
plastering upto any floor level finished even and smooth in CM 1:3 incl. finishing with
floating coat of neat cement slurry, with necessary scaffolding etc. complete.
(P.91,Ch.6.,Item No.6.32,06010B)(a) 15 mm th.
1.0 Materials :
1.1 Water M-1. The Cement mortar of proportion 1:4 shall conform to M-13.
2.0 Workmanship :
2.1 Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound.
These shall be properly examined before erection and use Stage scaffolding shall be provided for
ceiling plaster, which shall be independent of the walls.
2.2 Preparation of back-ground :
2.2.1 The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescence and
other foreign matter by water or by brushing. Smooth surface shall be roughened by wire brushing
if it is not hard and by racking if it is hard. In case of concrete surface, if a chemical retarder has
been applied to the form work, the surface shall be roughened by wire brushing and all the
resulting dust and loose particles cleaned off and care shall be taken that none of the retarder is
left on the surface. Trimming of projections on brick/concrete surface where necessary shall be
carried out to get an even surface.
2.2.2 Raking of joints in case of masonry where necessary shall be allowed to dry out for sufficient
period before carrying out the plaster work.
2.2.3 The work shall not be soaked but only damped evenly before applying the plaster. If the surface
becomes dry such area shall be moistened again.
2.2.4 For external plaster, the plastering operation shall be started from top floor and carried
downwards. For internal plaster, the plastering operations may be started wherever the building
frame and cladding work are ready and the temporary supporting ceiling resting on the wall of the
floor have been removed, Ceiling plaster shall be completed before starting plaster to walls.
2.3 Applications of Plaster :
2.3.1 The plaster about 15 x 15 cms. Shall be first applied horizontally and vertically at not more than
metre intervals over the entire surface to serve as gauge. The surfaces of these gauges shall be
truly inplane of the finished plastered surface. The mortar shall then be applied in uniform surface
slightly more than the specified thickness, then brought to a true surface by working a wooden
straight edge reaching across the gauges with small upward and sideways movement at a time.
Finally, the surface shall be finished off true with a trowel or wooden float according as a smooth or
a sandy granular texture is required. Excessive trowelling or overworking the float shall be
avoided. All corners, arrises, angles and junctions be truly vertical or horizontal as the case may
be and shall be carefully finished. Rounding or chamfering corners, arrises junctions etc. shall be
carried out with proper templates to the size required.
2.3.2 Cement plaster shall be used within half an hour after addition of water. Any mortar or plaster
which is partially set shall be rejected and removed forthwith from the site :
2.3.3 In suspending the work at the end of the day, the plaster shall be left out clean to the line both
horizontally and vertically. When recommending the plaster, the edges of the old work shall be
scraped clean and wetted with cement putty before plaster is applied to the adjacent area to
enable the two to properly joint together. Plastering work shall be closed at the end of the day on
the body of the wall and nearer than 15 cm. To any corners or arrises. Horizontal joints in
plasterwork shall not also occur on parapet tops and copings as these invariably lead to leakage.
No portion of the surface shall be left out initially to be packed up later on.
2.3.4 Each coat shall be kept dam continuously till the next coat is applied or for a minimum period of
days. Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of walls
shall be avoided and only as much water as can be readily absorbed shall be used excessive
evaporation on the sunny or windward side of building in hot air or dry weather shall be prevented
by handling mattings or gunny bags on the outside of the plaster and keeping them wet.
3.0 Mode of measurement & payment :
3.1 The rate shall include the cost of all materials, labour and scaffolding etc, involved in the
operations described under workmanship.
3.2 All plastering shall be measured in square metres unless, otherwise specified length, breadth or
height shall be measured correct to a centimeter.
3.3 Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open joints in
brick work, stone work etc. or space between laths. Thickness of plaster shall be average
thickness with minimum 15 mm. at any point on this surface.
3.4 This item includes plastering upto floor two level.
3.5 The measurement of wall plastering shall be taken between the walls or partition (dimensions
before plastering being taken) for length and from the top of floor or skirting to ceiling for height.
Depth of cover of cornices if any shall be deducted.
3.6 Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measured
3.7 For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints,
beams, posts, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openings
exceeding 0.5 sq.mt. and not exceeding 3.0 sq. mt. in each area deductions and additions shall be
made in the following manner :
(a) No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5 sq.
mt. each and no addition shall be made for reveals, jambs, soffits, sills etc. of these opening for
finish to plaster around ends of joints, beams, posts etc.
(b) Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as
follows and no addition shall be made for reveals, jambs, soffits etc. sills etc. of these openings.
(i) When both faces of all wall are plastered with same plaster, deduction shall be made for one face
(ii) When two faces of wall are plastered with different types of plasters or if one faces is plastered
and the other pointed, deductions shall be made from the plaster or pointing on the side of frame
for door, window etc. on which width or reveals is less than that on the other side but no
deductions shall be made on the other side. Where width of reveals on both faces of all are equal,
deductions of 50% of area of opening on each face shall be made from area of plaster and/or
pointing as the case may be.
3.8 For openings having door frames equal to projecting beyond the thickness of wall, full deduction
for opening shall be made from each plastered face of the wall.
3.9 In case of openings of area above 3 sq. mt. each, deduction shall be made for opening but jambs,
soffits and sills shall be measured.
3.10 The rate shall be for a unit of one sq. metre.
Item No 19 :- Extra over above item for Ceilling plaster on Ceilling and soffits of stairs up to any
floor (app.rate) (P.201,Ch.17.,Item No.17.91,17006)
The rate shall be for a unit of one sq. metre.
As per Item and instructed by engineer incharge
Item No 20 :- Providing 20mm thick double coat sand face/mala cement plaster on interior
brick/concrete work for plastering comprising o f base coat of 12mm thick cement
plasterin cement mortar(1Cement:4coarsesand) in rough finishing and 8mm thick t op
coat of cement mortar1:2(1Cement:2Coarsesand) finished with trovel including
scaffoldingcuring etc. complete.(P.203,Ch.17.,17017)
1.0 Materials :
1.1 Water shall conform to M-12. Cement mortar shall conform to M-11.
2.0 Workmanship :
2.1 The work shall be carried out in the coats. The backing coat (base coat) shall be 12 mm. thick in
C.M. 1:2. The relevant specifications of item no. 17.58(I) shall be followed except that the
thickness of back coat shall be 12 mm. average. Before the first coat hardens its shall be beaten
up by edges of wooden tappers and close dents shall be made on the surface.
The subsequent coat shall be applied after this coat has been allowed to set for 3 to 5 days
depending upto the weather conditions. The surface shall not be allowed to dry during this
2.2 The second coat shall be completed to 8 mm. thickness in C.M. 1:2 as described above, including
raising sand facing by bushing. The sample of sand face shall be got approved before the work is
started. The whole work shall be carried out uniformly as per sample approved.
2.3 Curing : The curing shall be started overnight after finishing of plaster. The plaster shall be kept for
a period of 7 days. During this period, it shall be protected from all damages.
3.0 Mode measurements & payment :
3.1 The relevant specifications of item no. 17.58 (I) shall be followed except that the sand face plaster
on outside upto m. above ground level shall be measured under this item.
3.2 The rate shall be for a unit of one sq. metre.
Item No 21 :- Providing & laying Stone chips Plaster with / without grooves for making panels
incl.backing coat of plaster in C.M.(1:3) in grey cement as per dir.Of
consultants.(N.S/ARC.)
The rate shall be for a unit of one sq. metre.
As per Item and instructed by engineer incharge
Item No 22 :- Providing & Applying Cement Popada Plaster In Cement Mortar In 1 : 3 Incl.
Cleaning Surface Before Plastering Rate Also Incl. Scafloding, Watering , And
Neat Finishing Etc. Comp. As Dire.(N.S./ARC)
The rate shall be for a unit of one sq. metre.
As per Item and instructed by engineer incharge
Item No 23 :- Providing and applying fibere reinforced cementitious micro concrete work in
cellings and beams incl.mixture of CEMSCREED HM (F) fair mate company material,
FBR bonding agent material with water in suItable proportion anti corrosive treatment
on exposed beam,celling steel bars with safeCore R incl.all kind of
labouretc.comp.including three coat of white wash.(Approved Rate in ARC)
The rate shall be for a unit of one sq. metre.
As per Item and instructed by engineer incharge
Item No 24 :- Providing And Laying Polished Kota Stone Slab Flooring Over 20 Mm. (Average)
Thick Base Of Cement Mortar 1:6 (1 Cement : 6 Coarse Sand) Or Lime Mortar
1:1.5 Laid Over And Joined With Grey Cement Slurry mixed with
pigmenttomatchtheshade of slab including rubbing and polishing
etc.complete.(A)25mmthick. (P.185,Item No.14.43,14012A)
1.0 Materials :
1.1 Water shall conform M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-
11 polished kota stone shall conform to M-49.
2.0 Workmanship :
2.1 Each slab shall be cut to the required size and shape and fine chisel dressed at all the edges. The
sides thus dressed shall have a full contact if a straight edge is laid along. The sides shall be table
rubbed with coarse sand before paving. All angles and edges of the slabs shall be true square and
free form chippings and giving plain surface. The thickness shall be 25 mm. (Average) as specified
in the item but not less than 20 mm. at any place of the slab.
2.2 Bedding for the kota stone slabs shall be cement mortar 1:6 (1 cement : 6 coarse sand) or L.M.
1:1.5 of average thickness 20 mm. as given in the description of the item. Sub grade shall be
cleaned, wetted and mopped. Mortar of the specified mix and thickness shall be then be spread on
an area sufficient to receive one kota stone slab. The slab shall be washed clean before laying. It
shall be laid on top pressed, tapped gently to bring it in level with the other slabs. It shall be lifted
and laid aside. Top surface of the mortar shall then be corrected by adding fresh mortar at hollows
or depressions. The mortar shall then be allowed to harden bit. Over this surface, cement slurry of
honey like consistency shall be applied. The slab shall then be gently place in position and tapped
with wooden mallet till it is properly pedded in level with and close to the adjoining slab. The joint
shall be as fine as possible. The slabs fixed in the floor adjoining the wall shall enter not less then
10 mm. under the plaster skirting or dado. The junction between the wall floor shall be finished
neatly. The finished surface shall be true to levels and slopes as directed.
2.3 The floor shall be kept wet for a minimum period of 7 days. So that bedding and joints set properly.
2.4 Polishing shall be normally commenced after 14 days of laying the stone slab. First polishing shall
be done with ear borundum stones of 120 grade grit fitted in the heavy machine and then second
polishing shall be done with carborundum stone of 220 of 350 grade grit fitted in heavy machine.
Water shall be properly used during polishing. The stone shall then be washed clean with water.
When directed by the Engineer-in-charge wax polish of approved quality shall be applied on the
surface with the help of soft cloth over a clean and dry surface. Then the polish machine fitted with
bobs shall be run over it.
2.5 The holes required for Nahni traps, pipes any other fittings shall be made without any extra cost.
3.0 Mode of measurements & payment :
3.1 The rate shall include the cost of all materials and labour involved in all the operations described
above. The Kota stone flooring shall be measured in square metres correct to two places of
decimal, length and breadth shall be measured correct to a centimeter and between the finished
face of skirting dado or wall plaster and no deduction shall be made nor extra paid for any opening
in floor of area upto 0.1 sq. mt.
The rate shall be for a unit of one sq. metre.
Item No 25 :- Providing and laying Rough chiselled dressed (kota stone green) stone flooring over
25 mm. thick base of cement mortar 1:5 (1 cement : 5 coarse sand) or L.M. 1:1.5
including pointing with cement mortar 1:2 (1 cement : 2 coarse sand) etc.
complete.(P.187,Item No.14.46,14014A)
Materials : Water shall conform to M-1 line mortar shall conform to M-10 cement mortar shall conform to
M-11 rough chiselled dressed stone shall conform to M-48.
2.0 Workmanship :
2.1 The relevant specifications of item no. 18. shall be followed except that the rough chiselled dressed
stone of 25 mm. thickness of approved quality are to be fixed on cement mortar bedding in C.M.
1:5 or L.M. 1:1.5 of 25 mm. (average) thickness.
2.2 Dressing of stone slab : Every stone shall be cut to the required size and shape and rough chiselled
dressed stone on top, if required so that the dressed surface shall not be more than 6 mm. from
straight edge placed on it the sides shall also be chiselled dressed to a minimum depth of 20 mm.
so that the dressed edge shall at no place be more than 30 mm. from straight edge butted against
it. Beyond this depth the sides may be dressed slightly splayed so as to form an inverted “V” shape
joint with adjoining slab. The surface shall be reasonable true and plain and all the angles & edges
shall be square and free from chippings where the stone slabs are to be used for nosing, exposed
edge shall be rough chiselled dressed to full depth and cut to the uniform thickness.
2.3 The thickness of the stone slab shall be 25 mm with permissible tolerance of + or – 2 mm.
2.4 Laying : The surface of the sub-grade concrete shall be cleaned, wetted and mopped. The bedding of
specified mortar mix shall be spread under each slab shall be washed clean before laying. It shall
be then laid-on top dressed so that all hollows underneath filled up and surplus mortar works up
through joints. The top shall be tapped and brought level to the adjoining slab. The thickness of
joints shall not exceed 5 mm. Subsequent slabs shall be laid in same manner.
2.5 Curing & Finishing : Any surplus mortar on the surface of slab shall be cleaned off and joints
finished lush. The joints shall be racked out uniformly to a minimum depth of 12 mm. when
the mortar is still green, the slabs which are fixed in the floors adjoining the wall shall be not
less then 12 mm under the plaster, skirting and dado. The junctions between wall plasters and
floors shall be finished neatly and without waviness. The pointing shall be done with C:M
1:2. The pointing shall be cured for minimum period of seven days. The finished floor shall not sound
hollow when tapped with wooden mallet and the finished surface shall be true to level and slopes
3.0 Mode of measurement & payment :
3.1 The relevant specification of item No. 18 shall be followed.
3.2 The rate shall be for a unit of one sq. metre.
Item No 26 :- Labour Work for moulding the polish kota stone surface rate also including provding
cutting and grinder machine for molding work etc.complete as directed.(app.rate)
The rate shall be for a unit of one running metre.
As per Item and instructed by engineer incharge
Item No 27 :- Labour work for Polish kota stone surface rate also including providing cutting and
grinder machine for molding work etccomlete as directed.(app. rate)
The rate shall be for a unit of one sq. metre.
As per Item and instructed by engineer incharge
Item No 28 :- Providing And Laying Cement Concrete Flooring For I.P.S.1:2:4 (For Indian
Patent Stones) (1 Cement: 2 Coarse Sand:4 Graded Stone Aggregate 20 Mm.
Nominal Size) Lain In Layer Finished With A Floating Coat Of Net Cement.(40
Mm Th.)(P.187,Item No.14.71,14015A)
1.1 Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stone
aggregate 20 mm. nominal size shall conform to M-12.
Cement concrete 1:2:4 proportion measured by volume shall conform to relevant
specification or ordinary grade 1:2:4 concrete.
2.0 Workmanship :
2.1 The cement concrete flooring of 40 mm. thick (average) is to be laid as per the site condition. The
concrete shall be mixed in a mechanical mixer at the work. Hand mixer may however be allowed
for smaller quantities of work and in case of failure of machines or as permitted by the engineer-in-
charge. It shall carried out on a water tight platform and care shall be taken to ensure that mixing is
continued until the mass is uniform in colour and consistency. However in such cases 10% more
cement than otherwise required shall have to be used without any cost. The mechanical mixing
shall be done for a period of 1/2 to 2 minutes. The quantity of water shall be thus sufficient of
produce a dense concrete required workability for the purpose. Flooring of specified thickness
shall be laid in accordance with approved pattern or as directed. Finishing operation shall start
shortly after the cessation of beating and shall be spread over a period of one to six hours
depending upon the temperature and atmospheric conditions. The surface shall be left for some
time till moisture disappears from it. Fresh quantity of cement shall be mixed with water to form a
thick slurry and spread over the surface while the concrete is still green. Use of dry cement or
cement and sand mixture sprinkled on this surface to stiffen the concrete or absorb excessive
moisture shall not be permitted. The cement slurry shall than be properly paste twice by means of
iron flats, once, when the slurry is applied and the second time when cement starts setting and
finished smooth. The surface shall be marked with string or B.R.C. fabric jali to make the surface
non slippery as and when directed. The junction of floors with wall plaster dado or skirting shall be
rounded where so required upto 25 mm. radius. Flooring in lavatories and bath rooms shall be laid
after fixing of water closet and squatting pans and floor traps, which shall be plugged while laying
the floors and opened after the floors, are completed. Any damage, done to water supply sanitary
fittings during the execution of work shall be mage good.
2.2 After the final set, the concrete shall be kept continuously wet, if required ponding for a period of
not less than 7 days from the date of placement.
2.3 The form work shall be provided if necessary as directed by the engineer in charge. Concreting
shall be done as per alternate bay method with necessary centering wither by mastic or cement
mortar as directed.
3.0 Mode of measurement & payment :
3.1 The rate shall include the cost of all material and labour involved in all the operations described
above. No deduction shall be made or extra paid for any opening upto 0.1 sq. metre in area in the
floor, nothing extra shall be paid for laying the floor at different levels in the same room or the court
3.2 The rate shall be for unit of one sq. metre.
Item No 29 :- Additional Rate For Providing Water Proofing Solution in I.P.S
The rate shall be for a unit of one sq. metre.
As per Item and instructed by engineer incharge
Item No 30 :- P & L 24"x24" vitrified 8mm thick tile flooring over 20mm (average) base of cement
mortar 1:6(1cement:6coarsesand) on new surface or fixing on existing flooring by
adhesive material including dismentaling of existing flooring and jointed with color
cement slurry including finis ed with flush pointing & cleaning the
surfaceetc.complete for anti skit(P.189,Item No.14.9,14021)
Item No 31 :- P & L 24"x24" vitrified 8mm thick tile flooring over 20mm (average) base of cement
mortar 1:6(1cement:6coarsesand) on new surface or fixing on existing flooring by
adhesive material including dismentaling of existing flooring and jointed with color
cement slurry including finis ed with flush pointing & cleaning the
surfaceetc.(P.189,Item No.14.9,14022)
Water shall conform to M-1. Cement mortar shall conform to M-11. vitrifiedtiles shall conform to M-
2.0 Workmanship :
2.1 Preparation of surface : In case of brick masonry wall, the joints shall be raked out to a depth of atleast
15 mm. while the masonry is being laid. In case of concrete wall, the surface shall be chiselled and
roughened with wire brushes. The surface shall be cleaned and wetted thoroughly before
commencing the laying work.
2.2.1 The wall surface shall be covered 20 mm. thick plaster of cement mortar 1:6 mix and allowed to
harden. The plaster shall be roughened with wire brushes both way. The back of tiles shall be
floated with gray cement slurry and edges with white cement slurry set in bedding mortar. The tiles
shall be gently tapped in position one after the other keeping the joints as this as possible. Top f
skirting or dado shall be truly horizontal and the joints vertical or as per required pattern.
2.2.2 Risers of steps, skirting and dado shall rest on top of treads or flooring. Where full size tiles cannot
be fixed, they shall be cut to the required size and the edges be smoothened. surface shall be
2.2.3 The joints shall be cleaned and flush pointed with white cement. The surface shall be kept wet for
seven days. After curing the surface shall be washed clean.
3.0 Mode of measurement & payment :
3.1 The rate shall include the cost of all materials and labour required for various operations described
above. Risers of steps, skirting and dado shall be measured in square meters. Length and height
shall be measured along the finished face of the skirting or dado including curves, where special
such as covers, internal and external angles, etc. used. The length and height shall be measured
correct to the centimeter except in cast of riser and skirting where height shall be measured correct
3.2 The rate shall be for a unit of one sq. meter.
Item No 32 :- Providing and Fixing pvc.Door (sintex door-equivalent) with necessary alluminium
fitting with EL-7 section frame (Approved Rate as per ARC)
The measurement shall be given in one smt. basis
Item No 33 :- Providing & laying polish kota stone (25 mm th,) Sandwich platform. Work incl.
provdg good quality & even shade polish kota stone of required size having uniform
thickness. Work also incl. providing nece. Dismentling of brick work for making jari to
support the etc.comp.(app rate)
The rate shall be for a unit of one sq. metre.
As per Item and instructed by engineer incharge
Item No 34 :- P/F glass of 4 mm thik for vent lowers and window with wooden border patti as per
instruction of eng. In chage.(app.rate)
The rate shall be for a unit of one no.
As per Item and instructed by engineer incharge
Item No 35 :- Making hole in brick wall & all damaged work shall be well repaired as per inst. etc.
The rate shall be for a unit of one no.
As per Item and instructed by engineer incharge
Item No 36 :- Provdg. & fixing rubber plug for sink or wash basin.
The rate shall be for a unit of one no.
As per Item and instructed by engineer incharge
Item No 37 :- Providing and fixing 30 mm thick approved standard brand factory made PVC
rigid foam paneled door shutter manufactured by made from m.s. cube 19 guage
thickness size 19 x 9 mm for styles and 15 x 15 mm for top and bottom rails , covered
with heat moulded PVC '''' C channel of 5 mm thick sheet and 30 x 50 mm wide to
foam styles and 5 mm thick and 75 mm wide PVC sheet for top rail, lock rail,
and bottom rail on either side and 5 mm thick, 20 mm wide cross PVC sheet as gap
insert for top rail and bottom rail , paneling of 5 mm thick PVC sheet filled in the
MS frame welded / shield to the styles and rails with 5 x 30 mm PVC sheet
beading on either side and joined together with solvent cement adhesive
etc. complete as per manufacturers applications and directions of engineer in
charge fixed to frames with three nos .Stainless Steel hinges (four inch long)
incl.medium grade aluminium hardware all octroi, tax charges etc.complete.I01385
quality and colour of PVC rigid foam paneled door shutter shall be approved by engg.in charge
2.00 Mode of measurement and payment
2.01 The measurement shall be given in Smt basis
Item No 38 :- Providing and fixing approved standard brand factory made PVC door FRAME of
size 50 x 47 mm with a wall thickness of 5 mm made out of extruded 5 mm rigid
PVC foam sheet mitred at corners and jointed with 2 Nos. of 150 mm long
brackets of 15 x 15 mm M.S.square tube the vertical door profiles to be reinforced
with 19 x 9 mm M.S.square tube of 19 guage, EPDM rubber gasket weather seal to
be provided through out the frame. The door frame to be fixed to the wall using
M.S.screws of 65/100 mm size etc.complete as per manufacturers specifications
and direction of Engineering in charge incl. medium grade aluminium hardware all
octroi, tax charges etc.complete
(item code no-10050 sor-15-16)
1.0 quality and colour of PVC rigid foam paneled door shutter shall be approved by engg.in charge
2.00 Mode of measurement and payment
2..01 The measurement shall be given in Rmt basis
Item No 39 :- Providing and fixing pre laminated PVC rigid foam sheet manufactured by approved
standard brand wall paneling of thickness 5 mm stuck on inner frame work of 35 mm
wide strips of 5 mm thick PVC rigid foam sheet. The strips should have in their centre
a groove of 6 mm width and 2 mm depth for sinking the head of the screw used to fix
the strips to the wall and should be placed vertically at equal intervals of 405 / 407 mm
center to center. The PVC strips to be fixed to the wall using 65 mm long M.S. screws
through the groove in the strip by using PVC fasteners. the distance between two
screws shall not be more then 300 mm. A groove of 2 mm to be left at the joint of two
panels for aesthetic look.
The rate shall be for a unit of smt basis.
As per Item and instructed by engineer incharge
Item No 40 :- Providing and fixing 35 mm th. Shutters for doors windows & clearstory windows
incl. wood frames as specified 12 cm. x 7cm. size incl. anodisedalluminium fixtures
and fastenings including primer coat of approved quality and two coats of oil paint
etc. complete. Bldg.s.o.r.2015-2016 ,ch.no.10, it code 10032a, 10032b, 10032c)
(I) Fully glazed
(II)Fully panelled
(III) Partly panelled& partly glazed.
1.0 Materials: Indian teak wood shall conform to M-29. Glass shall conform to M-38.
2.0 Workmanship: The relevant specifications of item no 10.1 (A) shall be followed for frame work
except that the framework of 10x 7 cms. Size of required size ventilators shall be provided with
glazed glass louvers. The glass louvers shall be provided as directed. In the groove of 1.25 cms.
Depth made in frames, the thickness of glass shall be 5 mm and glass shall be glass of best
quality. The ventilation blades shall slope down towards the outside at an angle of 45
3.0 Mode of measurements and payment:
3.1 The area of opening within the frame in which louvers are fixed shall be measured in sq. meters
3.2 The rate includes painting 3 coats to wood work with ready mix paint.
3.3 The rate shall be for a unit of one square meter.
As per Item and instructed by engineer incharge
Item No 41 :- Providing And Laying Glazed Tiles 6 Mm Thick In Flooring Treads Of Steps
And Landing Laid On A Bed Of 12Mm Thick Cement Mortar 1:3 (1 Cement :
Coarse Sand) Finished With Flush Pointing In White Cement.(P.183,Item
Item No 42 :- Providing And Laying Glazed Tiles 6 Mm Thick In skirting risers of Steps and
dedo 10Mm Thick Cement plaster 1:3 (1 Cement : 3 Coarse Sand) Finished With
Flush Pointing In White Cement slurry.(P.183,Item No.14.32),14009A)
Materials : Water shall conform to m –1 cement mortar shall conform to M-11 white glazed tiles shall
conform to M-55.
1.0 Workmanship:
1.0 The work shall be carried out for skirting as dedo. Before fixing precast terrazzo (Mosaic marble)
tiles of shade and size as specified, the surface shall be prepared by heavy scarping, making joints
etc. to the required line, level and plumb. The surface shall be thoroughly wetted before
commencing the laying work. Thereafter about 10 mm. thick backing of cement mortar in specified
proportion shall be applied on the surface in true like and level generally as per specifications of
2.2 Fixing : The black of each tile to be fixed shall be smeared with cement paste of matching colour
and the mosaic tiles shall then be gently tapped against the surface, with a wooden mallet. The
skirting shall be done only after the flooring is competed. Any pipes coming out of the wall through
the dedo or skirting shall only beat at the intersections of the horizontal and vertical joints. The tiles
shall not have staggered joints. The joints shall be true to entire line both ways and vertical joints
shall be in line with joints of flooring. Tiles shall be fixed as close as possible to the adjoining tiles
and any difference in the thickness of the mosaic tiles shall be evened out in the cement paste so
that all the tiles faces are set in conformly with one another. The skirting shall project uniformly and
not more than 6 mm. thickness beyond the finished surface above. Top of skirting of dedo shall be
truly horizontal. The rises of steps, skirting or dedo shall rest on top of treads of flooring wherever
required. The tiles shall be cut (sawn) and thin edges smoothened before use.
2.3 Curing : Curing shall be done for 7 days continuously.
2.4 Finishing : Skirting and dedo shall be hand polished to have an even smooth and shining surface.
In case of skirting only 10 mm. x 10 mm. grove shall be provided at the junction of cement plaster
and cement tiles.
2.1.2 The white glazed tiles shall be laid on cement mortar bedding of 12 mm thick in C.M. 1 :3 . The
mortar shall have sufficient plasticity for laying and there shall be no hard lumps that would
interfere with the evenness of bedding the base shall be cleared with well wetted. The mortar shall
then be spread in thickness not less than 10 mm at any place and average 12 mm thickness. The
proportion of the cement mortar shall be as specified in the item.
1.1 Fixing tiles :
1.1.1 The tiles before laying shall be soaked in water for atleast two hours Neat Gracie cement grout at
3.3 Kg/Cement /Sq. mt. Of honey like consistency shall be separated over the mortar bedding as
directed. The edges of the tiles be smeared with neat cement slurry. The tiles shall be well pressed
and gently tapped with a wooden mallet till they are properly bedded and in level with the adjoining
tiles. There shall be no hollows in bed or joints. The joints between the tiles shall be as thin as
possible in straight line or as per pattern.
1.1.2 The tiles shall not have staggered joints. The joints shall be true to centre line both ways. The
Nehni trap coming in the flooring shall be so positioned that its grating shall replace only one tile as
far as possible. Where full size tiles cannot be fixed, they shall be cut (swan0 to be required size
and the edges rubbed smooth to ensure straight and true joints. The joints shall be filled with grey
cement grout with wire brush of trowel to a depth of 5 mm. and loose material removed. White
cement shall be used for pointing the joints., After fixing the tile finally in an even the flooring shall
be kept wet and allowed to nature undisturbed for 7 days.
1.2.1 The surplus cement grout that may have come out of the joints shall be cleared off before it sets.
Once the floor has set, it shall be carefully washed, cleared by dilute acid and dried. Proper
precaution and measures shall be taken to ensure that the tiles are not damaged inany way till the
completion of the construction.
2.0 Mode of measurement & payment
2.1 The work done shall be measured in sq. mt. For visible area of work done, The length and width of
the flooring shall be measured not between the faces of skirting or dedos or plastered face of wall
as the case may be. The paving under dedo or skirting shall not be measured. No deduction shall
be made not extra paid for any opening in the floor of area upto 0.1 sq. mt. Nothing extra shall be
paid for laying the floors at different levels in the same rooms.
3.0 Mode of measurement & payment
3.1 The work done shall be measured in sq. mt. For visible area of work done, The length and width of
the flooring shall be measured not between the faces of skirting or dedos or plastered face of wall
as the case may be. The paving under dedo or skirting shall not be measured. No deduction shall
be made not extra paid for any opening in the floor of area upto 0.1 sq. mt. Nothing extra shall be
paid for laying the floors at different levels in the same rooms.
3.2 The rate shall be for a unit of one sq. metre.
Item No 43 :- Providing And Laying ceramics Tiles 6 Mm Thick In Flooring Treads Of Steps
And Landing Laid On A Bed Of 12Mm Thick Cement Mortar 1:3 (1 Cement :
Coarse Sand) Finished With Flush Pointing In White Cement.(P.183,Item
Water shall conform to M-1. Cement mortar shall conform to M-11 Ceramics vitrified flooring tiles
shall conform to M-55.
2.0 Workmanship :
2.1 Preparation of surface : In case of brick masonry wall, the joints shall be raked out to a depth of atleast
15 mm. while the masonry is being laid. In case of concrete wall, the surface shall be chiselled and
roughened with wire brushes. The surface shall be cleaned and wetted thoroughly before
commencing the laying work.
2.2.1 The wall surface shall be covered 10 mm. thick plaster of cement mortar 1:3 mix and allowed to
harden. The plaster shall be roughened with wire brushes both way. The back of tiles shall be
floated with gray cement slurry and edges with white cement slurry set in bedding mortar. The tiles
shall be gently tapped in position one after the other keeping the joints as this as possible. Top f
skirting or dado shall be truly horizontal and the joints vertical or as per required pattern.
2.2.2 Risers of steps, skirting and dado shall rest on top of treads or flooring. Where full size tiles cannot
be fixed, they shall be cut to the required size and the edges be smoothened. surface shall be
2.2.3 The joints shall be cleaned and flush pointed with white cement. The surface shall be kept wet for
seven days. After curing the surface shall be washed clean.
3.0 Mode of measurement & payment :
3.1 The rate shall include the cost of all materials and labour required for various operations described
above. Risers of steps, skirting and dado shall be measured in square meters. Length and height
shall be measured along the finished face of the skirting or dado including curves, where special
such as covers, internal and external angles, etc. used. The length and height shall be measured
correct to the centimeter except in cast of riser and skirting where height shall be measured correct
3.2 The rate shall be for a unit of one sq. meter.
Item No 44 :- Providing and fixing rough cast wired glass 6 mm thick bedded in putty and thick
with wooden beading including the cost of wooden beadings of Indian teak wood and
necessary cutting of glass. (P.169,Item No.13.3,13002)(C) wired figured glass.
The rate shall be for a unit of one sq. metre.
As per Item and instructed by engineer incharge
Item No 45 :- Supplying And Fixing Nimbhada Ladi 37 To 50 Mm Thick For Walk-Way, Covering
The Activity Of Excavation, Ramming, Laying On Sand Bedding As Per
Requirement To Fix The Nibhada Stone In Line & Level With Cement Pointing
In Cement Mortar 1:2 Etc Complete As Directed.(As Per ARC)
Nimbhada stone of ordinary quality. paving on 37 mm to 50 mm th. shall be used of app.
quality on average 3.00 cm. thick sand bedding incl. cement pointing in prop. of C.M. 1:2.
Necessary watering curing etc. up to 7 days shall be done.
Necessary excavation shall be done to the reqd. depth & level & grade as shown to the contractor.
The foundation bed should be watered and consolidated before the bedding is laid.
The surplus earth shall be removed by the contractor within in a lead of 30 mts as instructed &
dump will be leveled by the contractor. The sand shall be clear & coarse.
The stone shall be laid in line level & gradient reqd. No part of stone shall be laid projected. The
joint shall be ¾” mm thick. Staggering of the joint shall be provided if so instructed.
For pointing of all the joints shall be racked out to full depth while the mortar has not set during the
laying of stone. The joint shall be pointed with neat cement so that the surface may be smooth
&flush with the slab. Watering shall be done for 7 days. For cement pointing C.M. shall be one part
of cement and two parts of sand to full depth etc. complete as required as directed.
The rate shall be for a unit of one Sq. meter basis.of sand to full depth etc. complete as required
Item No 46 :- Labour work for fixing above or any interlocking blocks/nimbhada on up to 50mm th
sand bedding,levelling,wateringanf fixing. Rate incl. average 30cm depth for
excavation and or filling,carting away debries/excavated material up to 5 km and
cleaning the site etc.comp. as directed.I00194
Labour work for f ixing above inter locking block on up to 50 mm th, sand bedding level ing,
water ing and f ixing. Rate average 30 cms depth excavation and of filling, car t ing away debr is /
excavated mater ials up to 5.0 kmt. Cleaning the site etc. comp. as directed.
C.C. Block shal l be laid on 50 mm the sand bedding, level ing, etc. comp. Rate also includes up
to 150 mm thick excavat ion and / f i l ling and car t ing away derbries / excavated mater ials up
to 5 kms lead. Excavat ion shal l be done to the reqd. depth & level & grade as shown to the
contractor . The foundat ion bed should be watered and consol idation before the bedding is laid.
Block shal l be laid in l ime and level as per design / pattem approved by AMC. In proportion of
coloured blocks.
Mode of payment shall be in Sq. mt. basis
Item No 47 :- Providing & Laying China Mosaic Flooring On Terrace With 6Mm Th.White Or
Coloured Glazed Tiles Chips Of Mini.25 To 35Mm Approved.Square Or Rectangular
Shape & Fixing It.Before Start The Work Remove All Existing Flooring & Open Old
Slab Surface With Wire Brush & Fill Crack If Shown With Water Proof Material.Than
For Making Level Gps.Work Done In Mini.45 To 50 Mm Th.&Fixing.China Mosaic
In Cm 1:3 With Neat Cement Slurry At Top & Filling The Gap With White Or Colour
Cement With Finishing Smooth Surface & Even Shade Incl.Cleaning Of All
Dirt,Dust& Other Foreign Matter.Rate Including For Making ColourPatta,Round
Vata With Fixing Neccessary Water Spout Opening Gap Etc.Comp.As Directed.(As per
(1) China Chips in required colours specially broken from full tiles in required size
(2) Cement (3) Sand (4) White Cement (5) Steiner
Before laying a final layer of China Chips prepare the surface to the required slope and level with a
backing coat in C.M (1:3). While laying a backing coat, spread a layer of thick cement slurry and scrub the
same vigorously to seal all pores in concrete below.
For the required designs prepare templates for different patterns from steel flats or plywood and mark out
total design on the designated area. Estimate the quantity of Chips of different colous and ensure its
uninterrupted supply before starting the work. Lay the chips flat on the bedding coat and fix tightly be light
hammering. Remove grey cement from the joints by scrapping before final set of cement.
Finish the joints neatly with white cement and harmonious colour Steiner. All design and pattern shall be
finished with first class workmanship. The surface should finally cleaned, given a mild acid wash for gain
the luster of China Chips.
Cost of China Chips, White cement, OPC, Sand, Steiner and all labour for leveling, laying by specialist
artisan, preparing templates, testing etc are included.
Mode Of Measurment :
Dimensions of total finished area as laid are recorded and area is computed in sq.m., rounded to two
places of decimal.
Item No 48 :- Providing & fixing Approved Make Glass Mosaic on Plastered surface.Glass mosaic
shall be of 25 mm x 25 mm size & 4 mm thickness pasted on a net / paper sheet.Glass
mosaic pieces are mounted uniformly on the net / paper sheet.colour shade
combinations.Rate includes all material,Labour,Scaffoldingetc.complete.(N.S AS PER
Materials : Glass mosaic 25x25 mm sizeor other size of Approved shade & Pattern.
Workmanship : The Surface where the Glass Mosaic has to be fixed shall be smooth & in
Complete plumb & level. The Adhesive shall be spread with 2 mm notch trowel. The Sheet of the
glass mosaic shall be placed ensuring perfect alignment vertically & horizontally. The gap
between the two sheets shall be the same as the gap between an individual mosaic Ensure that
the mark on the paper shall be in the same direction as the earlier sheet laid. The Mosaic are
gently tapped to achieve proper level. Soak the back paper with a sponge & peel off the water
soaked paper starting from corner. Peel off the paper gently ensuring that mosaic are not
disturbed from their positions. Adjust the mosaic alignment with the flat side of the trowel. Any
mosaics not in level or broken / cracked while tapping should be removed immediately &
replaced before the adhesive sets. After removing the paper , Mosaic surface is to be washed
with water to remove any residual glue & this avoid setting of adhesive / grout on the surface. Fill
the groove joints with the suitable grout of approved shade by using a rubber trowel. Remove the
excess grout with a wet sponge & sprinkle dry grout & spread on the entire surface to eliminate
the setting of wet grout on the surface. Leave for curing for 8 hours or as per manufacturer’s
guide lines. Clean the entire surface with diluted HCL. The ratio of acid to water should be
5:95.Then finally clean the surface with the dry cloth. The work includes all necessary
scaffolding etc. complete.
Mode of Measurement & Payment : The rate shall be for a unit of one sq. mtr.
Item No 49 :- Providing Cement Vata (10 Cms X 10 Cms)Size Quarter Round In Cement Mortar 1:1
Including Near Cement Finishing, Watering Etc. Complete.(P.203,Item No.0.0 17015)
The rate shall be for a unit of one running metre basis.
As per Item and instructed by engineer incharge
Item No 50 :- Providing, supplying and fixing precast C.C. blocks (M-20) edge kerb having size of
75 x 300 x 300 mm depth and as per design conveying it to the site, jointing into C:M
1:3 and racking out the joints incl. necessary excavation of asphalt, soil
etc..completed.- I00390
The curb shall be M-20 of size 300 x 300 x 75mm it shall be laid in proper line and camber and jointing vata in
C.M. 1:3 prop. Including the activities of excavation, ramming etc. comp.
Trenches of specified width and depth shall first be mode along the edges of the wering course of the road of
along the line of pave block flooring to receive the restraint block. The bed of the trenches shall be compacted
manually with steel rammers firm and even surface and then stones shall be set in P.C.C. The edge restraint
blocks shall be laid with their length running parallet to the paving edge, true in line and gradient. The joints of
blocks shall be not more than to mm and filled with the CM 1:3 (1 cement: 3 fine sand) which shall be cured
The edge shall be restored and all surplus earth including rubbish etc. disposed off as directed by the engineer
Length of the finished work shall be measured in running meter along the edge of the paving correct to a cm.
The rate shall include the cost the materials and labour including stone of specified materials involved in all
the operation described above. Sampling for testing on kerb shall be done Sampling for testing on kerb shall
be done in accordance with appendix – A as per Item No. 08. Testing for compressive strength relevant shall
be undertaken in accordance with I.S. Code.
The Mode of measurement and rate shall be given as per one running meter basis.
Item No 51 :- Conveyance charges of earth lime, murrum, building rubbish, manure, garbage,
sludge, excavated rock, fly ash, aggregate of any kind etc. comp. upto 5 km lead.
All the surplus earth and debries remaining on site after sufficient watering shall be carried away
immediately from site of work to the place within 5 km distance as directed by the Eng. In Charge,
so as not to cause any inconvenience to the public or traffic.
If the instruction of the Eng. In Charge of work are not followed within 7 days from the site,
the work shall be carried out by the Municipal Corporation at the risk and cost of the contractor and
any claim / dispute will not be entertained in the respect.
If the filling in the trenches after subsidence of the earth filled in is to be done the same
shall be carried out at contractor’s risk and cost. No extra payment shall be made for the such
The contractor shall take care of the surplus earth after the trenches are well watered and
refilled with earth.
If required the carting shall be carried out during night also without any extra cost.
All work shall be carried out as directed by Engineer-in-Charge.
Mode of measurement
Payment shall be as per cubic meter. Rate including cost of all materials, labour, machinery,
and equipment as directed.
Item No 52 :- Providing & Fixing M.S.Grill,Gate,Elevation Element Of Decorative Pattern With
M.S.Channel,Flat,Medium Grade M.S.Pipe,Square Or Round Bars With Round
HeandedBolts,Nuts,Or By Screw.Incl.Applying One Coat Zinc Primer And Two
Coat Of Oil Paint Etc.Comp.(as per A.R.C))
1.0 Materials : The structural steel shall conform to M-22.
2.0 Workmanship:
2.1 The M. S. Grill shall be prepared as per the drawings or as directed for fixing to wooden frames of
2.2 The grill shall be fabricated to the designs and patterns shown in the drawings and the weight shall be
as directed and the joints shall be riveted or welded as shown in the plan or as directed. The grill
so formed shall be fixed into the frames of the windows etc., before they are erected in position.
The outside strip frame of the grill shall be housed to its full thickness into the recess cut into the
frame of the windows etc. The grill shall be fixed to the frame with number of bolts and nuts of
screws viz. bolt nut/screw per 30 cm. Of the length of outer strip subject to a minimum of 2 nos. on
each side of the frame or as indicated in the drawings or as directed.
2.3 The bolts and nuts or screws shall be counter sunk and shall be fixed with the top of their heads flush
with the face of frame strips.
3.0 Mode of measurement and payment:
3.1 No payment shall be made for weight of screws, bolts, nuts etc. Only weight of grill shall be paid.
3.2 The rate shall be for unit of one Kg.
Item No 53 :- Providing and fixing 18 gauge s.s.304 grade stair railing as per design given and
direction of incharge
As per Item and instructed by engineer incharge
The measurement shall be given in one rmt basis
Item No 54 :- P/L. fine dressed 15 to 20 mm. average thick Dholpuri stone paving over Cement
mortar 1:2 (1 Cement : 2 Sand ) Including filing joints with cement mortar 1:3
and flush pointing with coloured cement painting and finishing as
directed.I01425
The rate shall be for a unit of one smt basis.
As per Item and instructed by engineer incharge
Item No 55 :- Providing & Laying 18 mm thick Mirror polish granite For flooring , counter , stair -
riser , tread , skirting , dedo etc. machine cut or chiselled on bed of cement mortar 1:1
pointing with neat cement slurry incl. moulding etc. comp. as per instruction of
engineer in charge. (Bldg. s.o.r 2015-2016,sr.no23 ch.no.14 )
As per Item and instructed by engineer incharge
The measurement shall be given in one smt basis
Item No 56 :- Providing & Fixing 20 mm thick Mirror Polished Decorative Granite Board with
Computerised Golden Letters Discription as per instructions of engg. in charge to
M.S. frame structure for Inaugaration& Public Handover Function
As per Item and instructed by engineer incharge
The measurement shall be given in one smt basis
Item No 57 :-Providing & Fixing M.S.structure from square & rectangular
pipes,angles,flats,roundetc.of required size for above mentioned granite board of
suitable size mentioned by engineer in charge.(N.S.)
As per Item and instructed by engineer incharge
The measurement shall be given in one kg basis
Item No 58 :- Removing and refixing old granite stone on walk way of KLF and for planter opp in
KLF removing granite stone and cleaning cement mortar with grinder, hammer and
takna, and filling the joints with white cement and necessary colour pigment as per
instruction of eng. in charge. ( As Per app rate.)
As per Item and instructed by engineer incharge
The measurement shall be given in one smt basis
Item No 59 :- Provinding and fixing in perfect alignment gypsum board false ceiling with all
material,labour,tools ,tackles,scaffolding and equipment including providing and
fixing gypboard with onw coat of primer and two or more coats of acrylic emulsion
As per Item and instructed by engineer incharge
The measurement shall be given in one smt basis
Item No 60 :- Removing and refixing the existing M.S.Grill from Brick work column and refixing the
same with new R.C.C casting column in line and level,including repairing M.S Grill if
required with providing M.S hold fast etc as per site condition.(as per R.A)
As per Item and instructed by engineer incharge
The measurement shall be given in one smt basis
Item No 61 :- Providing & fixing 2.00 mm thick F.R.P. sheet of good quality and standard make
rate also includes necessary fabrication structure in the grid of 1'-6" x 1'-6" size
usiung hollow pipe of size 3/4" x 3/4" , 2" x 1" & 1" x 1" rate also inclusive necessary
bending ,cutting and fabrication charges and priming coat and 2 coats of oil paint of
shade approved by engineer in-charge rate also includes washer and silicon paste
required for fixing the sheet in good quality as diredted.(As per ARC)
As per Item and instructed by engineer incharge
The measurement shall be given in one smt. basis
Item No 62 :- Carrying out plinth treatment to post construction / exsiting structure by spraying
chenical solution for termite control treatment incl. labour and materials consistant
with I.S.I specification.(Bldg.s.o.r. 2015-2016 ,sr.no.7,Ch.22)
1.0 following with concentration shown against each in aqueous emulsion
Chemicals Concentration
1 Aldrin 0.50%(by weight)
2 Heptachlor 0.50%(" ")
3 Chordane 1.00%(" ")
2.0 Workmanship :
2.1 The chemical barrier shall be complete and continuous under whole of the structure to be
2.2 The bottom and the sides of foundations upto a highest of 30 cms from the bottom of excavation
made form masonry foundation and for basement colume pits shall be treated with the chemical
emulsion at the rate 5 liter/sq meter of the surface area.
2.3 The chemical treatment shall be Carrie out when the surface is quite dry chemical treatement
shall not be carried out when it is raining or when the soil is wet with rain or sub soil water.
2.4 Once formed treated soil barriers shall be not disturbed if by chance treated soil barrier system.
2.5 The treatment against termite infection shall remain full effective for aneroid not less than 10 year
from date of issue of the final certificate of completion of work . If at any time during this period any
defects in treatment are revealed or any evidence of infection in any part of the building or
structure is noticed the contractor shall be rectify the concerned defects within 15 days on receipt
of notice from Engineer-in-charge .On contractor 's failure to do so the Engineer-in-charge as to
the cost payable by the contractor for the same shall be final and binding to the contractor
2.6 A guarantee bond on appropriately stamped paper shall be given by the contractor to the
department in the manner and form prescribed below:
FORM OF GUARANTEE BOND
"I/We……………………………(Contractor)hereby guarantee that work will remain unaffected and
will not be in any way damaged by termite or any other germs of similar type for period of 10 years
after completion of the work of anti0termite as per the terms and condition of the contractor and
contractor hereby indemnifies and agrees to save harmless the Government of Gujarat from any
loss and or damage that might be caused account of termite and or other similar type of germs and
hereby Guarantee to make good any loss or damages suffered by the Government of Gujarat and
further guarantee to redo the effective work without claiming any extra cost"
2.7 This guarantee shall remain force for the period of 10 year from the completion of the work under
the contract and it shall remain binding to the contractor for period of 10years.
2.8 The deposit at the rate of 50% of the cost of this item from the running and final bills shall be
recovered and retained for the fist one year after the completion of the work.
3.0 Mode of Measurement :
3.1 The length and breadth shall be measured correct to cm as per the dimensions of sanctioned
plans NO deduction shall be made not extra paid for and opening for pipe etc. upto 0.1 sq mt The
rate shall include the cost of all labour materials required for the operation involved for satisfactory
completion of this item The saids of the trenches 30cms each side and bottom shall be measured
under this item.
The rate shall be for a unit of one sq. meter
Item No 63 :- Carrying out timber treatment to all wood work incl. drilling holes and spreying oil
based chenical solution on surface ottimbner work for termite contorl including
labour and materials etc. comp (Bldg.s.o.r.2015-2016,sr.no.5, Ch-22 )
1.0 Materials :
1.1 The relevant specifications of item No. 55.00 shall be followed.
2.0 Workmanship :
2.1 The wood work effected by Ants shall be cleaned of all live formlyhidding inside. The whole wood
surface shall be then treated with oil or kerosene based chemical emulsion shall be poured into
holes by means of funnels specifically prepared for the same and allowed to seep. After funels
become empty, another does of chemical shall be pured in them. This process shall be done
repeatedly till the whole wood work fully become saturated with chemical.
2.2 The holes drilled in wood work shall be filled in with party and other similar materials as directed
and the whole wooden surface shall be made good s before.
3.0 Mode of measurements and payment :
3.1 The work shall be measured for the finished work in sq. meter including frame.
3.2 The out to out of frame shall be measured as width and from top flooring to top of frame shall be
as height. This area includes for treating frame and shutters both.
3.3 The rate includes cost of all labours and materials, required for satisfacotry completion of this item.
3.4 The rate includes drilling holes plugging the same after treatment completed and making good as
3.5 The rate shall be for a unit of one sq. meter.
Item No 64 :- Provdg. & fixing 100 mm size P or S trap for water closet squatting pan incl. jointing
the trap with the pan & soil pipe in cement mortar 1 :1 (cement : 1 fine sand) (Bldg.Sor
15-16) (A) Vitreous China :
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 65 :- Providing and fixing wash down water closet (Europeantype,W.C.Pan) with integral P
or S trap including jointing the trap with soil pipe in Cement Mortar1:1(1-Cement:1-
finesand) (Sea land cover to be measured and paid for separately) (A)vitreous China
Pattern :(i) in white colour (Bldg.Sor 15-16) page no-263,it no-23.112,23010
As per Item and instructed by engineer incharge.
The measurement shall be given in each no. basis
Item No 66 :- Providing and fixing water closet s quatting P an (IndiantypeW.C.Pan)size580mm
(Earthwork,bedconcrete,footresteandtraptobemeasured and paid for
separately)(A)VitreousChina.(I)Long pattern = White colour (Bldg.Sor 15-16) page no-
As per Item and instructed by engineer incharge.
The measurement shall be given in each no. basis
Item No 67 :- P/F. wash basin with single hole for pillar tap with C.I. or M.S. brackets painted white
incl. cutting holes and making good the same including all necessary fittings like
bottle trap CP waste coupline, pillar tap, stop cock, lead connections (At any floor (a)
Viterous China : : 550 mm x 400 mm size white/ colour(Bldg.Sor 15-16,ITEM
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 68 :- Provdg. & fixing C.P. Brass screw down bib taps of following size Bldg.s.o.r.2015-
The measurement shall be given in one no. basis
Item No 69 :- Providing & Fixing Angle Cock Of "Ess Ess" Trend Series Or Equivalent
Standard Make As Approved By Engg.In Charge All Complete.(N.S.)I00103
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 70 :- Provdg. & Fixing Gun Metal Check Or Nonruturn Full Wheel Valve.(P.269,Item
No.23.99 A To D) (A) 15 Mm Dia
1.0 Materials :
1.1 The gun metal check or non return full way wheel valve of specified dia. shall conform to I.S. 778-
1964. The non return valve shall be of tested quality.
2.0 Workmanship :
2.1 The gun metal check or non return valve shall be fully cleared of all foreign matter before fixing.
The fixing of valve shall be done by means of bolts nuts and 3 mm. rubber insertions with flanges
of spigot and socketed tail pieces, drilled to the same specification as in case of socket and spigot
and with flanges in case of flanged pipes. The jointing shall be done leak proof.
3.0 Mode of measurements & payment :
3.1 The rate includes all labour, materials, tools and plant etc. required for satisfactory completion of
3.2 The rate shall be for a unit of one number
Item No 71 :- Supplying necehardware,G.I. Fittngsetc.comp of app.quality as under
(a)1/2 '' Half turn bib cock
(b)1/2 '' Gun metal check or
nonruturn full wheel valve.
(c) 1/2 '' Piller tap
(d) 1/2 '' stop cock
(e) 1/2 '' G.I. Nipple -3 "'
(f) 1/2 '' G.I. Nipple -6 "'
(g) 1/2 '' G.I. Nipple -9 "'
(h) 1/2 '' G.I. Nipple -12 "'
(j) S.S.Soap dish
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 72 :- Provdg. & fixing ball cock of approved qaulity as directed. (23037A1,SOR-15-16)
(A) Copper metel.
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 73 :- Provdg. & Fixing Flat Back Large Urinal of White/ color of "Cera" or " Hindware" incl.
C.P. Brass waste coupline , waste pipe, pvc connection etc. Complete.( size
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 74 :- Providing & Fixing Chromium Plated Brass Flush Cock With Lever Of "Ess
Ess" - Trend Series Or Equivalent Make Incl.Fixing In Pipe
Etc.Comp.AsDir.OfEngg.In Charge.(N.S.) (1) 25 Mm Dia.I00117
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 75 :- Provdg. & fixing 600mm x 450 mm Bevelled edge mirror of superior glass mounted
of .6 mm th. A.C. sheet or plywood sheet and fixed to wooden pluge with C.P. brass
screws and washers.Bldg.s.o.r.2015-2016,it. No.23.143 Ch-23 )
As per Item and instructed by engineer incharge
The measurement shall be given in one no. basis
Item No 76 :- Provdg. & laying S.W. Gully trap with C.I. garting brick masonry chamber & water
tight C.I. cover with frame of 300 mm x 300 mm size ( inside) with standard
weight.sqare mouth trap size 150 x100 mm P trap Bldg.s.o.r.2015-2016,it. No.24.19b
As per Item and instructed by engineer incharge
The measurement shall be given in one no. basis
Item No 77 :- Provdg. And Fixing Cast Pvc/C.I.(Span) Nahni Trap Of The Following Nominal
Diameter Of Self Clenising Design With C.I. Scread Down Or Hinged Gratiing Incl.
Cost Of Cutting & Making, Good The Walls And Floors 100 Mm Inlet And 50 Mm Outlet
Etc.Comp.(P.263,Item No.23.857)23008
1.0 Materials :
1.1 The cast iron (spun) Nahni trap shall be conform to M-69. The C.I. hinged of screwed down cover
shall be of best quality.
2.0 Workmanship :
2.1 The Nahni trap with 100 mm. dia. inlet and 50 mm. dia. outlet shall be fixed as per drawings or as
2.2 The Nahni trap shall be jointed with C.I. Pipe, 75 mm. dia. with lead joints. The lend joints shall be
done in conformation with I.S. 782-1976.
3.0 Mode of measurements & payment :
3.1 The rate includes cost of all labour, materials, tools and plants etc. required for satisfactory
completion of this item including lead jointing and testing.
3.2 The payment of seat and cover shall be made separately.
3.3 The rate shall be for a unit of each one number.
Item No 78 :- Provdg. & fixing plastic seat & cover for wash down water closet with C.P.brass
hinges and rubber buffers.(P.265,Item No.23.121)23017(B) plastci seat & cover
As per Item and instructed by engineer incharge.
The measurement shall be given in each no. basis
Item No 79 Provdg. & fixing 12.5 lit.PVC Flush tank with nece.fixturesetc.comp as per site condition
(Bldg.Sor 15-16)
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 80 :- P/F Jet Spreay at Europeon WC Pan, incl nece. lath connection, stop cock, and other
fixing material and labour as per inst. of engineer in charge
As per Item and instructed by engineer incharge.
The measurement shall be given in one no. basis
Item No 81 :- Construction Of Under Ground Tank With 23 Cm Th.Masonary Wall In C.M.1:6
Incl.Excavation,Necessary 23 Cm B.B.C.C.1:5:10 For Foundation And Providing
R.C.C.1:2:4 For Top & Bottom Slab Of 12 Mm Th.And 7.5 Mm Th.R.C.C.Paradi On
Face Of Internal Side Of Periphary Of The Tank Incl.FormworkT.M.T.Steel
Reinforcement As Per Given Design,Vibrating Curing & Mixing Of Approved
Water Proofing Material With Every 50 Kg.Bag Of Cement,Inside Plaster In
C.M.1:3 And Vatta In C.M.1:1 Inside Tank,P&FF.R.C.Frame Cover Of Size600 X
Mm,Fiber Steps Etc.Comp.As Dire.(N.S.)I00149
As per Item and instructed by engineer incharge
The measurement shall be given in Liter basis
Item No 82 :- Providing & Fixing Polytheline Over Head Tank With Necessary Dia.Holes For
Outlet,Inlet Over Flow And Washout Necessary Washer And
CheckputEtc.Comp.(N.S.)I00105
Mode of measurement and payment
2..01 The measurement shall be given in Liter basis
As per Item and instructed by engineer incharge
Item No 83 :- Providing & Fixing Door closer-complete of Approved make to wooden / Alluminium
Doors as per direction of engg.in charge.(N.S.)
As per Item and instructed by engineer incharge
The rate shall be for a unit of one no. basis
Item No 84 :- P & F app.quality for Conseal lock in Alu.door .as per inst of engg in charge
.etc.comp.(app.rate)
As per Item and instructed by engineer incharge
The rate shall be for a unit of one no. basis
Item No 85 :- P & f app.quality for brass baby latch (door stopper) as per inst of engg in charge
.etc.comp (app.rate)
As per Item and instructed by engineer incharge.
The rate shall be for a unit of one no. basis
Item No 86 :- Providing throating or plaster drip, grooves and moulding to Wall , R.C.C. chajja and
slab. Bldg.s.o.r.2015-2016,it. No.5.4.18 Ch-5 )
Providing the throuting , Grooves or plaster drip &moulding to Wall , Ceiling , R.C.C. chajja& slab
at any floor level with finishing the edges drip of size 1.5 cm. wide and 1.0 cm deep incl. floating
coat of neat cement as dire by eng. in charge.
The rate shall be for running meter.
Item No 87 :- Providing & Fixing In Position Alluminium Doors With Frame Using Approved
Quality Anodised Extruded Alluminium Section As Approved By Engg.In
Charge(Jindal Alluminium) (A)Frame Sections 101.6x44.45 Mm(B)Shutter Bottom
Vertical & Top Section 83.5x44.45 (Wt.1.31 Kg/Mt.)(At 1.31Kg/Mt)(C)Shutter Bottom
Section At14.3x44.45 Mm At (1.37 Kg/Mt) Shutter Middle Section At 100x44.3
Wt.(1.37Kg/Mt) Incl.Providing& Installing 5 Mm Thick Approved Color Acrylic Sheet
Of Standard Quality Fixed With Glazing Chips On Upper Pannel & Laminated
Sheet On Lower Pannel (Wtt.0.13 Kg/Rmt) Etc.Comp.As Direction Of Engg.In
Charge. (N.S.)I00134
As per Item and instructed by engineer incharge.
The rate shall be for a unit of one smt basis
Item No 88 :- Providing & Fixing In Position Alluminium Window Sliding / Fix Type With Frame
Using Approved Anodised Extruded Alluminium Section As Approved By Engg.In
Charge.(Jindal Alluminium) Units Equivalent (A) Frame Sections 65 X 25 Mm (At
0.41kg/Mt) (B) Sliding Frame Bottom Section Of 61.85 X31.75 Mm (At 0.41 Kg/Rmt)
(C) Shutter Top & Bottom Section 40 X 18 Mm (Wt.0.41 Kg/Rmt) (D) Shutter
Interlock Vertical Section 10 X18 Mm.(0.41 Kg/Rmt) (E) Shutter Vertical Of 40 X
18 Mm (0.41 Kg/Rmt) Including P/F Installing 5 Mm Thick Approved Color Acrylic
Sheet Of Standard Quality Etc.Comp.(N.S.)
As per Item and instructed by engineer incharge
The rate shall be for a unit of one smt basis
Item No 89 :- Providing & Fixing In Position Alluminium Vents With Frame Using Approved
Anodised Extruded Alluminium Section As Approved By Engg.In Charge.(Jindal
Alluminium) Units Equivalent (Approved Rate) Frame Section Of 63.50 X 38.50Mm
(Wt.0.68 Kg/Rmt) Incl.Providing& Installing 5 Mm Thick Approved Color Acrylic Sheet
Of Standard Quality Etc.Comp.I00136
As per Item and instructed by engineer incharge
The rate shall be for a unit of one smt basis
Item No 90 :- Providing and fixing in position collapsible steel shutters with vertical channels
20x10x2 mm braced with flat iron diagonals 20x5 mm size with top & bottom rails of T-
iron 40x40x6 mm with 38 mm dia. Steel pulleys complete with bolts , nuts , locking
arrangement , stoppers , handles including applying a priming coat of red lead paint &
two coats of enamel paint of selected shade & approved make. ( Bldg.s.o.r.2015-
Materials: The collapsible steel gate shall conform to M-33.
T-rails shall be fixed to the floor and to the lintel at top by means of anchor bolts, embedded in
cement concrete on floor and lintel. The anchor bolts shall be placed approximately at 45 mm
centers alternatively in the two flanges of the T iron. In the bottom runner (T-iron) shall be
embedded in the floor and proper groove shall be formed along the runner for the purpose. The
collapsible gate shall be fixed at the sites by fixing the end double channels in the T-Iron rail and
also by hold fasts bolted to the end double channel and fixed in the masonry of the side walls or
the otherwiseIn case where the collapsible gate is not required to the lintel beams or slop above, a
tee iron suitably designed may be fixed at the top embedded in masonry and provided with
necessary clamps and roller arrangement at the top.
All the adjoining work damaged while fixing of gate shall be made good to match the existing work
without any extra payment.
All the members of the collapsible gate including T-Iron shall be thoroughly cleaned of rust, scales,
dust etc. and given a priming coat of red lead before fixing them in position.
Mode of measurements and payment:
The collapsible gate shall be measured in sq. meter. The height of the gate shall be measured as
the length of double channels and breadth from outside to outside of the end fixed double
channels in open position of the gate. The rate includes providing handles, locking arrangements,
The rate shall be for unit of one sq. meter.
Item No 91 :- Providing corrugated 0.80 mm (22 gauge) thick G.I. sheets roofing fixed with
galvanized iron ‘J’ or ‘L’ hook bolts, and nuts 8 mm. dia with bitumen and G.I. limpet
washers filled with white lead complete excluding the cost of purlines, rafters and
trusses. ( Bldg.S.O.R. 2015-2016 It. no.15.1 )
As per Item and instructed by engineer incharge
The rate shall be for a unit of one smt basis
Item No 92 :- Providing valleys 900 mm. overall in plain 1.6 mm. thick G.I. sheet Class – 3 fixed
with ‘J’ or ‘L’ hook bolts and nuts galvanized from ‘J’ or ‘L’ hook bolts and bitumen
washers complete.( Bldg.S.O.R. 2015-2016 It. no.15.8 )
As per Item and instructed by engineer incharge
The rate shall be for a unit of one smt. basis
Item No 93 :- Providing and fixing rolling shutters of approved make made of 80 mm wide
M.S.laths interlocked together through their entier length &joinned together at the
enda by & locks mounted on specially design pipe shaft with bracket plates giudes
channel & arrangement for inside &out side locking with push pull operation incl. the
the hood cover & spring etc. including priming , oil painting etc complete.(
(A) Shutters having width below 3.5 meter
As per Item and instructed by engineer incharge
The rate shall be for a unit of one smt basis
Item No 94 :- Provdg. & fixing UPVC handle valve of Prince,Supreme , Astral, finolex or equivalent
make as per dir. Of engg. In charge.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one no. basis
Item No 95 Provdg. And fixing to wall ,ceiling and floor 6.00 kg. F/Sq.Cm working pressure
polythelene pipes of the following outside diameter, low, density, complete with
special flange compression type fittings, wall clips etc. making good wall ceiling and
floor. Bldg.s.o.r.2015-2016,it. No. 23.8f , 23.8 g, Ch- 23)
1.1 The low density polythene pipe of specified diameter with 10 Kg/Sq.cm. working pressure shall
conform to I.S. 3076/1968. The specials and fitting required shall be of best quality.
1.0 Workmanship :
2.1 The P.V.C. Pipes of specified diameter shall be fixed as directed. Due to thermal expansion of rigid
P.V.C. Pipes, due allowance shall be made particularly in over ground pipe lines for any change in
length of pipe line which may occur during installation or when pipe line is in service.
2.2 Above ground installation of rigid P.V.C. pipe should be undertaken after preparations are
observed for their protection against direct sun rays and mechanical damage.
2.3 The rigid P.V.C. pipe lines should not be kept exposed above ground when if passes through
public places, railway lines, road side and foot paths.
2.4 P.V.C. pipes shall be supported at the following intervals :
20 mm dia. 500 mm. 32 mm. dia. 900 mm.
25 mm. dia. 750 mm.
2.5 Closer support spacing shall be provided if recommended by the manufacture.
2.6 The guide lines indicated by the manufacturer regarding, handling, transportation, storing laying
and jointing of pipes shall be kept in view during execution.
2.7 P.V.C. pipes shall be fixed on wall with wooden plugs and suitable plastic clamps.
2.8 Jointing the pipes :
2.8.1 The pipes and sockets shall be accurately cut. The ends of the pipes and fittings should be
absolutely free from dirt and dust. The outside surface of the pipes and the inside of the fittings
shall then be roughened with emery paper, and then solvent cement joint. Since solvent cement is
aggressive to P.V.C., care must be taken to avoid applying excessive cement to the inside of pipe
sockets as any surplus cement cannot be wiped off after jointing. Empty solvent cement tins,
brushes rags, or paper unpregnated with cement should not be buried in the trenches. They
should be gathered, not left scattered about, as they can prove to be a hazard to animals, which
2.8.2 If manufacture recommends its own methods of jointing, the same shall be adopted after
necessary approval from the Engineer-in-charge.
2.9 Laying pipes in Trenches :
2.9.1 The pipe shall be laid over uniform relatively soft fine grained soil found to be free of presence of
hard objects such as large flints, rocky projections, large tree roots etc. The width of the trenches
shall be minimum width required for working.
2.9.2 The pipes laid underground shall not be less than one metre from the ground level. The pipe shall
be positioned in the trenches so as to avoid any induced stresses due to deflection. Any deviation
required shall be obtained by using proper type of rubber ring joints.
3.0 Mode of measurements & payment :
3.1 The relevant specifications of item 23.2 (A) shall be followed except that the P.V.C. pipes of
specified dia. shall be paid under this item.
3.2 The unit rate shall be for a unit of one running metre.
Item No 96:- P/F. To Wall Ceiling And Floor 10.0 Kgf/Cm2 Working Pressure Pvc Pipes Of The
Following Outside Dia Complete With Special Flange Type Fittings,Wall Clamps
Incl. All Necessary Fittings Etc. Complete. (At Any Floor Level)I00226 (A) 75mm Dia.
I00227 (B) 110mm Dia.
2.0 Materials :
1.1 The low density polythene pipe of specified diameter with 10 Kg/Sq.cm. working pressure shall
conform to I.S. 3076/1968. The specials and fitting required shall be of best quality.
3.0 Workmanship :
2.1 The P.V.C. Pipes of specified diameter shall be fixed as directed. Due to thermal expansion of rigid
P.V.C. Pipes, due allowance shall be made particularly in over ground pipe lines for any change in
length of pipe line which may occur during installation or when pipe line is in service.
2.9 Above ground installation of rigid P.V.C. pipe should be undertaken after preparations are
observed for their protection against direct sun rays and mechanical damage.
2.10 The rigid P.V.C. pipe lines should not be kept exposed above ground when if passes through
public places, railway lines, road side and foot paths.
2.11 P.V.C. pipes shall be supported at the following intervals :
20 mm dia. 500 mm. 32 mm. dia. 900 mm.
25 mm. dia. 750 mm.
2.12 Closer support spacing shall be provided if recommended by the manufacture.
2.13 The guide lines indicated by the manufacturer regarding, handling, transportation, storing laying
and jointing of pipes shall be kept in view during execution.
2.14 P.V.C. pipes shall be fixed on wall with wooden plugs and suitable plastic clamps.
2.15 Jointing the pipes :
2.15.1 The pipes and sockets shall be accurately cut. The ends of the pipes and fittings should be
absolutely free from dirt and dust. The outside surface of the pipes and the inside of the fittings
shall then be roughened with emery paper, and then solvent cement joint. Since solvent cement is
aggressive to P.V.C., care must be taken to avoid applying excessive cement to the inside of pipe
sockets as any surplus cement cannot be wiped off after jointing. Empty solvent cement tins,
brushes rags, or paper unpregnated with cement should not be buried in the trenches. They
should be gathered, not left scattered about, as they can prove to be a hazard to animals, which
2.15.2 If manufacture recommends its own methods of jointing, the same shall be adopted after
necessary approval from the Engineer-in-charge.
2.9 Laying pipes in Trenches :
2.9.3 The pipe shall be laid over uniform relatively soft fine grained soil found to be free of presence of
hard objects such as large flints, rocky projections, large tree roots etc. The width of the trenches
shall be minimum width required for working.
2.9.4 The pipes laid underground shall not be less than one metre from the ground level. The pipe shall
be positioned in the trenches so as to avoid any induced stresses due to deflection. Any deviation
required shall be obtained by using proper type of rubber ring joints.
3.0 Mode of measurements & payment :
3.3 The relevant specifications of item 23.2 (A) shall be followed except that the P.V.C. pipes of
specified dia. shall be paid under this item.
3.4 The unit rate shall be for a unit of one running metre.
Item No 97:- Provdg. And fixing to wall, ceiling & floor in true line and level UPVC pipe Schedule-
40 of Prince , Supreme , astral , finolex or equivalent make as approved by engg.
incharge. pipe shall be fix on wall with the help of clamp at every twi meter center to
center of shall be concealed as directed in cludingneccesarry fitting etc. in cluding
testing of pipe and jointd and fixing the same with adhesive solvent , including cost of
all materials of following nominal bore Bldg.s.o.r.2015-2016,it code 23061.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one rmt basis
Item No 98:- Providing & Laying & Jointing glazed stoneware pipes incl. excavation up to
mt.,refilling, trasporting the pipe to work site, unloading, lowering in trenches, laying
and jointing the pipes in c.m. 1:1 incl. all jointing materials such as cement, sand,
hemp, bitumen as dire. testing the pipe line to a head of 1.5 mt. and hydraulic test as
dire incl. watering trenches, spreading , and carting away of surplus earth within
mt.lead as dire. etc. comp.Bldg.s.o.r.2015-2016,it. No.24.1 Ch- 24)
As per Item and instructed by engineer incharge
The rate shall be for a unit of one rmt basis
Item No 99:- Supply of Graout Material for Paving work in KLF & work carry out as per
Instructed by engineer Incharge.(Market Rate)I01430
As Per Item & Instructed by Engineer incharge,
The rate shall be for a unit of one kg basis
Item No 100:- P/F. to wall ceiling and floor galvanized mild steel tubes (Medium grade) of the
following nominal dia. with all tube fittings and clamps incl. making good the wall,
ceiling and floor. (At any floor level) (Bldg.Sor 2015-16,23.2,23001 a to 23001d)
1.0 Materials: Galvanized mild steel tubes of specified dia. nominal bore shall conform to I. S. 1239-
1968. The galvanized fittings, clamps, etc. required for specified dia. bore pipes shall be of best
quality and make as approved by the Engineer-in-charge.
2.0 Workmanship :
2.1 Cutting, Laying and Jointing :
2.1.1 When the tubes are to be cut or retheraded, the end shall be carefully filed out so that no
obstruction to bore in offered. The ends of the tubes shall then be threaded conforming to the
requirements of I. S. 554-1955 with pipe dies and taps carefully in such a manner as will not result
in slackness of joints when the two pieces are screwed together.
2.1.2 The taps and dies shall be used only for straightening screw threads which have become bent or
damaged and dies shall not be used for turning of the threads so as to make them slacks as the
latter procedure may not result in watertight joints. The screw threads for tube and fittings shall be
protected form edge unit they are fitted.
2.1.3 In jointing the tubes, the inside of the socket and the screwed end of the tubes shall be oi8led and
smeared with white or red lead an wapping around with a few turn of fine spun yarn round the
screwed end of the tube. The end shall then be tightly screwed in the socket, tees etc. with a pipe
wrench. Care shall be taken that all pipes and fittings are properly jointed so as to make the joints
completely water tight and pipes are kept at all times free from dust, and dirt during fixing. Burr
joints shall be removed after screwing. After laying the open ends of the pipes shall be temporarily
plugged to prevent access of water, soil or any other foreign matter.
2.1.4 Any threads exposed after jointing shall be painted or in the case of underground piping thickly
coated with approved anti-corrosive a paint to prevent corrsion.
2.2 Fixing of the tube fitting to wall ceiling and floors :
2.2.1 In case of fixing of tubes and fittings to the walls or ceilings these shall run on the surface of the
wall or ceiling (not in chase) unless otherwise specified. The fixing shall be done by means of
standard pattern, holder clamps keepings the pipes about 15 mm clear of the wall. When it is
found necessary to conceal the pipes and when specified so, chasing may be adopted or pipe
fixed in ducts or resesses etc. provided that there is sufficient space to work on the pipe with usual
tools. The pipe shall not ordinarily be buried in walls or solid floor, where unavoidable, pipes may
be buried for short distances provided that adequate protection is given against damage and
where so required joints are not buried. When required M. S. tube sleave shall be fixed at a palace
a pipe is passing through a wall or floor for expansion and contraction and other movements. In
case the pipe is embedded in walls or floors, it should be painted with anti-corrosive bitumastic
paint of approved quality. The pipe should not come in contact with lime mortar or lime concrete as
the pipe is affected by lime. Under the floors, the pipe shall be laid in layer of sand filling.
2.2.2 All pipes and fittings shall be fixed truly vertical and horizontal unless unavoidable. The pipes shall
be fixed to walls with standard pattern clamps of required size and shape, one end of which shall
be properly plugged or cemented into walls with cement mortar 1:3(1 cement : 3 coarse sand) and
the other tightened round the pipes to hold it securely. These clamps shall be spaced at regular
intervals in straight length at 2 M C/C interval in horizontal run and 2.5 M. interval in vertical run.
For pipe of 15 mm dia. up to 25 mm. dia. the holes in the walls and floors shall be made by drilling
with chisel or jumper and not by dismantling the brick work or concrete. However for bigger
diameter pipes, the holes shall be carefully made of the smallest required size. After fixing the pipe
the holes shall be made good with cement mortar 1:3(1 cement : 3 coarse sand) and properly
finished to match the adjacent surface.
2.3 Testing of joints :
2.3.1 After laying and jointing the pipes and fittings shall be inspected under working conditions of
pressure and flow. Any joint found leaking shall be redone, and all leaking pipes removed and
replaced without extra cost.
2.3.2 The pipes and fittings as they are laid shall be tested to hydraulic pressure of 6 Kg/sq. cm. The
pipe shall be slowly and carefully charged with water allowing all air to escape and avoiding all
shock and water hammer. The draw off takes and stop cock shall then be closed and specified
hydraulic pressure shall be applied gradually. The pressure gauge must be accurate. The pipes
and fittings shall be tested in sections as the work of laying proceeds keeping the joints exposed
for inspection during the testing.
3.0 Mode of measurements and payment :
3.1 The description of each item shall unless otherwise stated, be held to include where necessary,
conveyance, and delivery, handling unloading, storing fabrication, hoisting, all labour for finishing
to required shape and size; testing, fitting in position, straight, cutting and waste, return of packing
3.2 The length shall be measured on running meter basis of finished work. The length shall be taken
along the center line of the pipe and fittings. The pipes fixed to walls, ceiling, floors etc shall be
measured and paid under this item.
3.3 All the work shall be measured in decimal system as fixed in its place, subject to tolerance given
below unless otherwise stated:
(i) Dimension shall be measured to the nearest 0.01 meter
(ii) Area shall be worked out to the nearest 0.01 sq. meter.
3.4 All measurements of cutting shall unless otherwise stated be held to include the consequent
3.5 In case of fitting of unequal bore, the largest bore shall be measured for the test.
3.6 Testing of pipe lines fittings and joints include for providing all plant and appliances necessary for
obtaining access to the work to be tested and carrying out the tests.
3.7 The rate includes galvanized steel tubing with screwed socket joints, together with all fittings (such
as bends, sockets, springs, elbows, tees, crosses, short pieces, clamps and plugs unions etc.) and
fixing complete with clamping wall-hooks, wooden plugs etc and also cutting ,screwing and waste
and for making forged (or hand made) bends on piping as required. Connector shall be inserted,
where required or directed. The rate also includes cutting through walls, floors etc. and their
making good and painting exposed threads with anti corrosive paint as above and testing. Where
tubes are to be fixed to wall, ceiling and flooring, the rate shall not include painting of pipes,
providing sleeves and sand filling under floor for which separate payment shall be made.
3.8 The rate shall be for a unit of one running meter.
Item No 101:- Providing & Fixing 5 mm Thick Mirror in Diff Toilet Block Unit in Kankaria Lake Front
with S.S Studds & also Removing Existing Break Mirror etc comp as Directed (Market
As Per Item & Instructed by Engineer incharge,
The rate shall be for a unit of one smt. basis
Item No 102:- Providing & Fixing 15 Cm Wide Chicken Mesh Jali With Nails & Then Application Of
15 Mm Plaster On R.C.C.&Masonary Joints As Per Dir.OfEngg.In Charge
As per Item and instructed by engineer incharge
The rate shall be for a unit of one rmt basis
Item No 103:- Providing and laying (To level or slopes) and jointing reinforced concrete light duty
Non-pressure pipes I.S ClassNP2 of the following internal diameter with collars and
butt ends prepared for collar joints including testing of joints complete.
As per Item and instructed by engineer incharge
The rate shall be for a unit of one rmt. basis
Item No 104:- Constructing Slab type Chamber of following size including excavation, refilling,
BBCC (1:5:10), for foundation, C.C.Channel (1:2:4) finished, 15 mm thick cement
plaster inside & outside in CM 1:3, finishing with cement slurry, P/F 4 mm diaM.S.Steel
HDPE coated steps 35 cm c/c at 35 cm staggered masonary in CM 1:5, RCC Slab in CC
1:1.5:3, including Centering & reinforcement but excluding the cost of chamber seat
cover etc..completed.
(A) 0.60 X 0.45 mt. size Inside Clear,
Depth from 0.0 to 0.90meter for pipe
(Drainage SOR 2009-10,
P.H.E.Chamber, Item No.243 Page No.
0.75 X 0.75 mt. size (Inside Clear)
Depth from 0.0 to
meter for pipe dia<=20 mm
depth 0 to 1.2 mt. item including nece. Excavn. B.B.C.C. in 1:5:10 (1 cement ,5 coarse sand,
graded bk.agg.& ramming & curing etc. comp. Bricks work with bricks having crushing strength not
less then 35 kg./sq.cm.in C.M.1:5 the thickness of bk.masonary wall 0.35 mt. for 1 mt.depth and
mt.th.1mt. depth & racking out joint crushing.
The inside of wall shall be plastered 15mm th. C.M.1:3(1cement ,3 coarse sand)and finishing
with floating coating of neat cement channel shall be semicircular in bommom and of dia.equal to the
sewer. Above the horizontal dia.the sides shall be extended vertically same level as the crown of the
out going pipe and top edge shall be suitably rounded of the channel and benching shall be done c.c
1:2:4(1 cement 2coarse sand 4 graded stone agg.20 mm down graded )rising at a slop in line from
adges of channel the channel of the bottom of chamber.shall be plaster with C.M.1:2 and smooth
finish.P/F C.I steps also.
The cover of slab of R.C.C.1:2:4 & 15 mm th. Reinforced with 10 mm brass at 15 cms
c/c both way.surface and edges finished fair full bearing equal to the width of wall shall be given to the
slab on all sides the frame of M.H.cover shall be embedded firmly R.C.C. slab so that the top of the frame
remains flush with the top of the R.C.C.club.Aftercopletion of work back filling with water & chamber cover
of F.R.C. medium duty etc.comp.as dire. & details given by the Engg.incharge. The rate shall be for a unit
of one no. basis
Item No 105:- Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation,
Refilling, Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel
(1:2:4) of thickness 10 C.M., finished 15 mm thick cement plaster inside & outside
(Only for shaft) In Cm 1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.SteelHdpe
Coated Steps 35 Cm C/C At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In
Cc1:1.5:3 of thickness 15 C.M.,Including Cantering & Reinforcement (Single jalli at
C.M. c/c bothway 10 mm dia.)But Excluding The Cost Of Manhole Seat Cover
Etc..Completed Of Size 0.75 X 1.00 Meter (Inside Clear, M.H. length should be parallel
to the flow) (Based on Drainage SOR 2009-10)
1.00 to 2.00 meter depth, (Slab at Ground level) (for pipe
Mt depthManhole shall be provided at every change of alignment, gradient or diameter of
sewer/storm water drains, Bends and junctions in the sewer/drain shall be grouped together in manhole
as far as possoble. The maximum distance between inspection chambers shall be about 25 meters.
Where the diameter of sewer/drain is increased, the soffit of the pipe shall be fixed at the same level
and necessary slope given to the channel of manhole/inspection chamber. The minimum internal sizes
of manhole/inspection chamber shall be as per the respective item of work. The manhole/inspection
chamber shall be constructed as per the detailed drawings and as directed by Engineer. The bed
concrete and the brick masonry shall be constructed of such thickness as shown on drawing. The brick
masonry shall be constructed in C.M. (1:5), plastered on both faces inside and out side with 15 mm
cement plaster in C.M. (1:3). The channel shall be semicircular in the bottom half and of diameter equal
to the sewer/drain. Above the horizontal diameter, the sides shall be extended vertically to the same
level as the crown of the outgoing pipe and the top edge shall be suitable rounded off. The branch
channels shall also be similarly constructed with respect to the benching out at their junction with the
main channel as appropriate fall suitable rounded off in the direction of flow in the main channel shall be
given. The channel at the bottom of manhole / inspection chamber shall be plastered with C.M. (1:3)
and finished smooth. Rungs shall be provided in all manholes/inspection chambers over 0.6 mtr in
depth and shall be of cast iron conforming to IS:5455. These rungs shall be fixed staggered in two
vertical runs, 300 mm apart horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below
the manhole/ inspection chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and shall conform
to the requirements given in IS:1726. The covers and frames shall be cleanly cast and they shall be
free from airand sand holes and from clod shuts. They shall be neatly dressed and carefully trimmed.
All castings shall be free from voids whether due to shrinkage, gas inclusion or other causes. Covers
shall have a raised chequered design on the top surface to provide an adequered nonslip grip. Cover
shall be capable of easy opening and closing and it shall be fitted in the frame in workmanship like
manner. The cover shall be gas tight and water tight. The size of covers specified shall be considered
as the clear internal dimensions of the frame. Covers and frames shall be coated with a black
bituminous composition. The coating shall be smooth and tenaceous. The frame of manhole/inspection
chamber cover shall be firmly embeded to correct alignment and level in cement concrete on the top of
the masonry. The item shall be executed as per the detailed drawing and as directed by Engineer.
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed
by engineer in charge or Additional City Engineer (South zone)
Mode of measurement:-
The rate shall be for a unit of one number basis.
Item No 106:- CatchPit Jali Fixing P/F FRC catchpit jali with frame 600mm x 600mm clear opening
etc. comp.. As directed by engineer in charge. Road SOR , 2006-07, Item No.
32CatchPit Jali Fixing P/F FRC catchpit jali
comp.. As directed by engineer in charge.
For detailed specification refer R & B Dept. booklet for General Technical Specification for
building works , Road SOR , 2006-07, Item No.
The measurement shall be as per no. basis.
Item No 107:- Fixing M.H. seat cover supplied by corporation incl. Carting from store of AMC of
from and place to the work size & fixing in comp. as directed.
As per Item & Instructed by Engineer Incharge
The rate shall be for a unit of one no. basis
Item No 108:- Making connection to the ex.M.H.in running sewer incl.Dewatering and other
required machinery etc. of following dia pipes at any convenient time. All damaged
work shall be well repaired as per instructions. etc..complete. (Based on Drainage
a. 150 mm to 300 mm dia.
b. 400 mm to 600 mm dia.
c. 700 mm to 900 mm dia.
The pipe of any dia any material shall be cut as per requirement to make connection in
ex.M.H.reinforcement bar shall also have to be cut down. The rate also incl.dismentalling the wall of
ex.M.H.as per requirement and making good the same carting the debries with all lead is dore.by
Eng.incharge .If dire the work have to be done at night.
Measurement shall be given in No. basis.
Item No 109:- Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged
brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I.steps and existing MH sheet cover, removing the debris from MH and carting
the same as directed. (Based on Drainage SOR 2009-10)
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
(D) up to 0.90 mt. (@ Ten Coarse )
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender no.917.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .