| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹43.3 L (25.0%)Admitted-Finance | ₹2.2 Cr+₹43.3 L (25.0%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Dilawar singh contractor L1 | Balbir Singh L2 |
|---|---|---|---|---|---|
| 1.00Construction of Tracking route from Mall Road to Gunhill | |||||
| 1.01 | Excavation for structures Earth work in excavation of foundation of structures as per drawing and technical specification including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil by Manual Means Depth upto 3mt. | 21.43 | Cum | - | - |
| 1.02 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work.(Based on PWD specifications) | 6 | Cum | - | - |
| 1.03 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications P.C.C. grade M 20 Nominal mix (1:2:4) (Hand mixed) | 3.24 | Cum | - | - |
| 1.04 | Randem Rubble in R.R. Stone masonry laid dry i/c s/o of all material, labour T&P etc. all for proper completion of work. (As per P.W.D. specification). | 162 | Cum | - | - |
| 1.05 | Providing and laying of stone set pavement over 2.5 cm thick bedding layer of PCC 1:1.5:3, which shall further be placed over 10 cm thick dry stone kharanja or crushed stones base over a prepared subgrade as per drawings and technical specifications. The size of stones shall not be less than 20 cm x 20 cm and thickness of stones shall vary from 10 cm to 15 cm. The work includes filling of joints with PCC 1:1.5:3 as per the standard drawings and instructions of the Engineer-in-Charge. | 810 | Sqm | - | - |
| 1.06 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls,retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications) | 40 | Cum | - | - |
| 1.07 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification In 1:3 cement mortar | 2.35 | Cum | - | - |
| 1.08 | Providing & Laying reinforced cement concrete arch complete including centering and shuttering excluding reinforcement as per drawings and technical specifications Clauses 800, 900 and 1205 RCC grade M25 | 13.14 | Cum | - | - |
| 1.09 | 40 mm thick marble chips flooring rubbed and polished to granolithic finish, under layer 34 mm thick cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size) and top layer 6mm thick with white, black, chocolate, grey, yellow or green marble chips of sizes from lmm to 4mm nominal size laid in cement marble powder mix 3:1 (3 cement: 1 marble powder) by weight in proportion of 4:7 (4 cement marble powder mix : 7 marble chips) by volume including cement slurry etc. complete | 39.2 | Sqm | - | - |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
17 Feb 2020, 11:00 amClosed
Superintending Engineer, 9th Circle, PWD, Dehradun
Superintending Engineer, 9th Circle, PWD, Dehradun
Construction of Tracking route from Mall road to Gunhill and Happy valley to Campty fall in Mussoorie Vidhansabha, District Dehradun under State Sector.
2020_pwd_22467_1
352/1C-9/2020, Dated 24-01-2020
Open Tender
Civil Works - Roads
Item Rate
540 days
Mall road to Gunhill and Happy valley to Campty fa
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer, Pro. Division, PWD, Dehradun
₹3.8 L
Superintending Engineer, 9th Circle, PWD, Dehradun
29 Feb 2020
3 Feb 2020
17 Feb 2020
3 Feb 2020
17 Feb 2020
10 Feb 2020
10 Feb 2020
Amount
Construction of Tracking route from Mall Road to Gunhill
Excavation for structures Earth work in excavation of foundation of structures as per drawing and technical specification including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil by Manual Means Depth upto 3mt.
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work.(Based on PWD specifications)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications P.C.C. grade M 20 Nominal mix (1:2:4) (Hand mixed)
Randem Rubble in R.R. Stone masonry laid dry i/c s/o of all material, labour T&P etc. all for proper completion of work. (As per P.W.D. specification).
Providing and laying of stone set pavement over 2.5 cm thick bedding layer of PCC 1:1.5:3, which shall further be placed over 10 cm thick dry stone kharanja or crushed stones base over a prepared subgrade as per drawings and technical specifications. The size of stones shall not be less than 20 cm x 20 cm and thickness of stones shall vary from 10 cm to 15 cm. The work includes filling of joints with PCC 1:1.5:3 as per the standard drawings and instructions of the Engineer-in-Charge.
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls,retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification In 1:3 cement mortar
Providing & Laying reinforced cement concrete arch complete including centering and shuttering excluding reinforcement as per drawings and technical specifications Clauses 800, 900 and 1205 RCC grade M25
40 mm thick marble chips flooring rubbed and polished to granolithic finish, under layer 34 mm thick cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size) and top layer 6mm thick with white, black, chocolate, grey, yellow or green marble chips of sizes from lmm to 4mm nominal size laid in cement marble powder mix 3:1 (3 cement: 1 marble powder) by weight in proportion of 4:7 (4 cement marble powder mix : 7 marble chips) by volume including cement slurry etc. complete
Plastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Cement plaster 15 mm thick 1:4 on stone masonry
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue tonne complete as per drawings and technicalspecification Clauses 1002, 1005, 1010 & 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS 1786:2008 clause no. 1.6)
Supply of Prefed GaJibo Consist Cast Iron Frame Work on Piller And RooftrussAnd G.I. Sheeting Roofing and Plank Wood Flooring Etc. Complete Size Of Gajibo Will Be (12ft x 6 ft) in floor area With Three Sheeting Bench.
Providing fitting and fixing mild steel railing complete as per drawing and technical metre specifications Clause 1208.2
Construction of Tracking route from Happy Vallet to Campty Fall
Excavation for structures Earth work in excavation of foundation of structures as per drawing and technical specification including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil by Manual Means Depth upto 3mt.
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge .
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls,retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)
Kharanja work on road in R.R. Stone masonry laid dry i/c s/o of all material, labour T&P etc. all for proper completion of work. (As per P.W.D. specification).
H.P stone filling in back of wallls including cost of all materials ,royality.t&p etc.complete.
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work.(Based on PWD specifications)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications P.C.C. grade M 20 Nominal mix (1:2:4) (Hand mixed)
Providing and laying of stone set pavement over 2.5 cm thick bedding layer of PCC 1:1.5:3, which shall further be placed over 10 cm thick dry stone kharanja or crushed stones base over a prepared subgrade as per drawings and technical specifications. The size of stones shall not be less than 20 cm x 20 cm and thickness of stones shall vary from 10 cm to 15 cm. The work includes filling of joints with PCC 1:1.5:3 as per the standard drawings and instructions of the Engineer-in-Charge.
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification In 1:3 cement mortar
Providing & Laying reinforced cement concrete arch complete including centering and shuttering excluding reinforcement as per drawings and technical specifications Clauses 800, 900 and 1205 RCC grade M20 (1:2.4) nominal mix
40 mm thick marble chips flooring rubbed and polished to granolithic finish, under layer 34 mm thick cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size) and top layer 6mm thick with white, black, chocolate, grey, yellow or green marble chips of sizes from lmm to 4mm nominal size laid in cement marble powder mix 3:1 (3 cement: 1 marble powder) by weight in proportion of 4:7 (4 cement marble powder mix : 7 marble chips) by volume including cement slurry etc. complete
Plastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Cement plaster 15 mm thick 1:4 on stone masonry
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue tonne complete as per drawings and technicalspecification Clauses 1002, 1005, 1010 & 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS 1786:2008 clause no. 1.6)
Supply of Prefed GaJibo Consist Cast Iron Frame Work on Piller And RooftrussAnd G.I. Sheeting Roofing and Plank Wood Flooring Etc. Complete Size Of Gajibo Will Be (12ft x 6 ft) in floor area With Three Sheeting Bench.
Providing fitting and fixing mild steel railing complete as per drawing and technical metre specifications Clause 1208.2
Providing joists (karries) including hoisting, fixing in position and applying wood preservative on unexposed surface etc. complete with : Sal Wood
Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture
Balbir Singh
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.32 MB
SBD.pdf
Tender Documents • 0.92 MB
BOQ_26811.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .