| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.3 LAccepted-AOC | L1 | Accepted-AOC M/S MEJAR SINGH | |
| 2 | L2₹22.2 L+₹82,809.93 (3.88%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹25.9 L+₹4.6 L (21.4%)Rejected-AOC COAL INDIA LIMITED | L3 | Rejected-AOC L3 |
Tender Value
₹20.7 L
EMD Value
₹25,878
Closing Date
15 Jan 2026, 5:00 pmClosed
S.K.Panja
Office of the Project Officer,WJ Area
Dismentalling, Transportation, Assembling installation of 3no pumps and motor and misc. work in Main Pump Room 500MH and workshop of Moonidih Colliery, W J Area
2026_BCCL_350581_1
BCCL/WJA/MND/SUR/2025-26/88
Open Tender
Miscellaneous Works
Percentage
50 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹25,878
3 Feb 2026
5 Jan 2026
16 Jan 2026
5 Jan 2026
15 Jan 2026
5 Jan 2026
Dismentalling, Transportation, Assembling installation of 3no pumps & motor and misc. work in Main Pump Room 500MH & workshop of Moonidih Colliery, W J Area
Dismentalling and transportation of 2nos of 5m³ pump from main pump room to workshop. Analysis Manshift required = 8 Manshift(Unskilled) x 6 shift = 48 Manshift@(1367.60) = 48 x 1367.60 = Rs. 65,644.80 for 2 nos or 65,644.80/2 = 32822.40/Nos
Dismantling & transpotation of 800KW motor to Surface. Analysis Manshift required = 8 Manshift(Unskilled) x 8 shift = 64 Manshift@(1367.60) = 64 x 1367.60 = Rs. 87526.40 for 1 no or 87526.40 /no
Dismantling & transpotation soft starter to Surface. Analysis Manshift required = 8 Manshift(Unskilled) x 3 shift = 24 Manshift@(1367.60) = 24 x 1367.60 = Rs. 32822.40 for 1 nos or 32,824.8/no
Dismantling and transportation of Base frame of 5m³/min pump to surface. Manshift required =Analysis 8 Manshift(Unskilled) x 4 shift = 32 Manshift@(1367.60) = 32 x 1367.60 = Rs. 43763.20 for 1 nos or 43763.20/no
Dismantling and transportation of suction pipe along with foot valve of 5m³/min pump to surface for fabrication. Analysis Manshift required = 8 Manshift(Unskilled) x 4 shift = 32 Manshift@(1367.60) = 32 x 1367.60 = Rs. 43763.20 for 1 nos or43763.20/no
Dismantling and transportation of Non Return Valve along with delivery pipe with "F" shape of 5m³/min pump to surface and fitting of 2nos of 10inch metal plate on flange of suice valve . Analysis Manshift required = 8 Manshift(Unskilled) x 4 shift = 32 Manshift@(1367.60) = 32 x 1367.60 = Rs. 43763.20 for 1 nos or 43763.20/no
3no old foundation excavation work by Chipping hammer machine 5.5x1.2x1.5 mtr (lxbxh) = 9.9m³.Analysis Manshift required = 6 Manshift(Unskilled) x 9 shift = 54 Manshift@(1367.60) = 54 x 1367.60 = Rs. 73850.40 for 9.9m³, for 1m³ = Rs. 7459.64
Transportation of debris of volume 9.9m³ in trolley from main pump room to surface. Manshift required = 6 Manshift(Unskilled) x 4 shift = 24 Manshift@(1367.60) = 24 x 1367.60 = Rs. 32,822.40
Loading of materials such as cement, sand & 4 graded stone in the mine tubs at surface & transportation from surface to main Pump Room 500MH. Analysis Manshift required = 8 Manshift(Unskilled) x 2 shift = 16 Manshift@(1367.60) = 16 x 1367.60 = Rs. 21,881.60
Concreting and grouting for the foundation of base frame
Lowering, transportation & placing of new 7.5m³/min basefame on 3rd No existing foundation for measurement and marking of foundation bolt. Manshift required = 8 Manshift(Unskilled) x 4 shift = 32 Manshift@(1367.60) = 32 x 1367.60 = Rs. 43,763.20 for 1 nos or 43,763.20 /no
Lowering, transportation & placing of new 7.5m³/min pump on new base frame for measurement of Suction, delivery & concreting. Manshift required = 8 Manshift (Unskilled) x 4 shift = 32 Manshift@(1367.60) = 32 x 1367.60 = Rs. 43,763.20 for 1 nos or 43,763.20/no
Dismantling of 2nos of metal plates from delivey suice valve flange, transportation and Assembling of 10inch new "F" fabricated delivery pipe along with 10inch Non Return Valve (NRV) for measurement purpose. Manshift required = Analysis 8 Manshift(Unskilled) x 2 shift = 16 Manshift@(1367.60) = 16 x 1367.60 = Rs. 21,881.60 for 1 nos or 21,881.60 /no
Dismantling of New Non Return Valve along with delivery pipe with "F" fabrication for 7.5m³/min pump & transportation of "F" fabricated pipe to surface for welding purpose and fitting of 2nos of 10inch metal plate on flange of suice valve . Manshift required = Manshift required = 8 Manshift(Unskilled) x 2 shift = 16 Manshift@(1367.60) = 16 x 1367.60 = Rs. 21,881.60 for 1 nos or 21,881.60/no
Dismantling & transpotation of new 7.5m³/min pump from new baseframe to pit bottom. Manshift required = 8 Manshift(Unskilled) x 2 shift = 16 Manshift@(1367.60) = 16 x 1367.60 = Rs. 21,881.60 for 1 nos or 21,881.60/no
Dismentalling, transportation of new 7.5m³/min pump new base frame from main pump Room to Pit bottom. Manshift required = 8 Manshift(Unskilled) x 2 shift = 16 Manshift@(1367.60) = 16 x 1367.60 = Rs. 21,881.60 for 1 nos or 21,881.60/no
10nos of Holding bolt core Cutting in old foundation , size 150mm dia, depth 800mm
Loading of 155 bags sica cement the mine tubs at surface & transportation from surface to main Pump Room 500MH. Manshift required = Analysis 8 Manshift(Unskilled) x 2 shift = 16 Manshift@(1367.60) = 16 x 1367.60 = Rs. 21,881.60
Grouting for holding bolt 10 nos. total volume for 10nos of is .2m³. Total nos 30kg bag of Sica GP-2 cement required is 15
Transportation, placing of base frame in new foundation from pit bottom to Main Pump Room for leveling. Manshift required = 8 Manshift(Unskilled) x 2 shift = 16 Manshift@(1367.60) = 16 x 1367.60 = Rs.21,881.60 for 1 nos or 21,881.60/no
Leveling of new 7.5m³/min pump base frame. Manshift required = 6 Manshift(Unskilled) x 4 shift = 24 Manshift@(1367.60) = 24 x 1367.60 = Rs. 32,822.40 for 1 nos or 32,822.40/no
Sica Grouting for entire base frame of dimensions 4.75x1.62x.25 m³. total volume is 1.92375 m³. Total nos 30kg bag of Sica GP-2 cement required is 138
Transportation & placing of new 7.5m³/min pump on 3no new base frame. Manshift required =Analysis 8 Manshift(Unskilled) x 2 shift = 16 Manshift@(1367.60) = 16 x 1367.60 = Rs. 21,881.60 for 1 nos or 21,881.60/no
Transpotation, placing & installation of 1300KW motor from Surface to base frame of 3rd no pump. Analysis Manshift required = 8 Manshift(Unskilled) x 8 shift = 64 Manshift@(1367.60) = 64 x 1367.60 = Rs. 87,526.40 for 1 no or 87,526.40/no
Motor and pump allignment. Manshift required =Analysis 6 Manshift(Unskilled) x 5 shift = 30 Manshift@(1367.60) = 30 x 1367.60 = Rs. 41028.00 for 1 nos or 41028.00/no
Dismentalling, transportation of old 1250KW liquid starter & Shifting of various materials from Main Pump Room 500MH to Surface .Analysis Manshift required = 8 Manshift(Unskilled) x 3 shift = 24 Manshift@(1367.60) = 24 x 1367.60 = Rs. 32,822.40 for 1 nos or 32,822.40/no
Transpotation & placing of soft starter for 1300KW motor from Surface to Main Pump Room. Manshift required = 8 Manshift(Unskilled) x 3 shift = 24 Manshift@(1367.60) = 24 x 1367.60 = Rs. 32,822.40 for 1 nos or 32,822.4/no
Dismantling, transportation of 2 nos of 50mtr 95sq mm XLPEDWA cable from DR-3 substation and laying, hanging in Main Pump Room 500MH. Manshift required = 8 Manshift(Unskilled) x 8 shift = 64 Manshift@(1367.60) = 64 x 1367.60 = Rs. 87,526.40 for 100mtr or Rs. 875.26./mtr
Transportation of cable accessories such as 5 nos of cable entry box & multi core signalling cable from surface to Main Pump Room 500MH. Manshift required = 6 Manshift(Unskilled) x 2 shift = 12 Manshift@(1367.60) = 12 x 1367.60 = Rs. 16,411.20
Compounding of 4 nos of cable entry boxes. Manshift required = 2 Manshift(Unskilled) x 4 shift = 8 Manshift@(1367.60) = 8 x 1367.60 = Rs. 10940.80 for 4nos or Rs. 2,735.20/no
Connection of 4nos of entry boxes with cables. Manshift required = 4 Manshift(Unskilled) x 4 shift = 16 Manshift@(1367.60) = 16 x 1367.60 = Rs. 21881.60 for 4 nos or 5470.40/no
Dismentalling and transportation of 2nos of 7.5m³ pump from main pump room to workshop. For 1 pump Manshift required = Analysis 8 Manshift(Unskilled) x 4 shift = 32 Manshift@(1367.60) = 32 x 1367.60 = Rs. 43,763.20 for 1 no or 43,763.20/no
Transportation of 2no of 7.5m³ pump from suface to main pump room and assembling and placing of 7.5m³ of pump on base frame at main pump room 500mh. For 1 pump Manshift required = Analysis Manshift required = 8 Manshift(Unskilled) x 5 shift = 40 Manshift@(1367.60) = 40 x 1367.60 = Rs. 54704.00 for 1 no or 54704.00/no
2 nos of sump cleaning in Main Pump Room. Analysis 4 Manshift(Unskilled) x 2 shift = 8 Manshift@(1367.60) = 8 x 1367.60 = Rs. 10,941.6 for 2 nos or 5470.40/no
Water leakage arrest of 12" pipe line work. 6 Manshift(Unskilled) x 3 shift = 18 Manshift@(1367.60) = 18 x 1367.60 = Rs. 24616.80
Transportation of 2nos of 5m³ pump from suface to main pump room and assembling and placing of 2nos of pump on base frame at main pump room 500mh. Manshift required =Analysis 8 Manshift(Unskilled) x 8 shift = 64 Manshift@(1367.60) = 64 x 1367.60 = Rs.87,526.40 for 2 nos or 87,526.40/2 = 43,763.20/no
Dismantling & assembling of 2 nos of 7.5m³/min pump at workshop (surface). Manshift required = 6 Manshift(Unskilled) x 10 shift = 60 Manshift@(1250) = 60 x 1250 = Rs. 75,000 for 2nos or 75,000/2 = 37,500/no
Dismantling & assembling of 2 nos of 5m³/min pump at workshop (surface).Analysis Manshift required = 6 Manshift(Unskilled) x 10 shift = 60 Manshift@(1250) = 60 x 1250 = Rs. 75,000 for 2nos or 75,000/2 = 37,500/no
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
CMPF, Pension and admin. Charge of Employee Un Skilled
CMPF, Pension and admin. Charge of Employee semi Skilled
CMPF, Pension and admin. Charge of Employee Skilled
CMPF, Pension and admin. Charge of Employee UnSkilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.62 MB
BOQ_363334.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .