Loading…
Loading…
Tender Value
₹11 L
EMD Value
₹22,000
Closing Date
10 Aug 2026, 12:00 pm
xen mlalad
jda jodhpur
sports complex constructionw work at public place at meera nagar jhalamand
2026_JDAJO_579833_1
JoDA/Nit-06/MLAlad/2026-27
Open Tender
Civil Works
Percentage
180 days
jda jodhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
secretary jda jodhpur and md risl jaipur
₹22,000
Yes
30 Jul 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART (A) civil work | - | - | - | - |
| 2 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: | - | Cum. | 641 | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | - | Cum. | 178 | - |
| 4 | Providing & laying in position cement concrete including curing, compaction etc. complete using stone aggregate 40mm nominal size in foundation plinth, excluding the cost of shuttering using 1 Cement : 4sand : 8 aggregate mix.) | - | Cum. | 3,302 | - |
| 5 | Random Rubble stone masonry for foundation and plinth in Cement Sand mortar above 30CM thick wall in: Cement Mortar 1:6 (1 cement : 6 sand) | - | Cum. | 2,838 | - |
| 6 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : | - | Cum. | 3,479 | - |
| 7 | Add extra for facing as per design and detailed specifications including additional cost of stones Course rubble facing First sort. | - | Sqm. | 618 | - |
| 8 | Extra for facing as per design and detailed specifications including additional cost of stones over item No. for :Course rubble facingSecond sort. | - | Sqm. | 491 | - |
| 9 | Add extra for rock facing with proper projection and chisel 2 line dressing and building corners and jambs etc. incl. Uniform joints for 15cm to 20 cm thick courses excl. c.r. facing. | - | Sqm. | 290 | - |
| 10 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | - | Sqm. | 157 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_1030290.xls
BOQ • 0.34 MB
Binder1.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].