| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC work awarded being L1 |
| 2 | L2₹1.3 Cr+₹5,054 (0.04%)Rejected-Finance 3 4 JEEVAN DEEP BUILDING 10 PARLIAMENT STREET NEW DELHI 1 PH 011 43573493 9899713006 | ₹1.3 Cr+₹5,054 (0.04%) | L2 | Rejected-Finance rejected being L2 |
| 3 | L3₹1.4 Cr+₹9.4 L (7.13%)Rejected-Finance | ₹1.4 Cr+₹9.4 L (7.13%) | L3 | Rejected-Finance rejected being L3 |
| 4 | L4₹1.4 Cr+₹10.2 L (7.77%)Rejected-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹1.4 Cr+₹10.2 L (7.77%) | L4 | Rejected-Finance rejected being L4 |
| 5 | L5₹1.6 Cr+₹28.4 L (21.5%)Rejected-Finance PLOT NO F28 COMPLETE COOLING SOLUTIONS LLP PHASE 8 INDUSTRIAL AREA SAS NAGAR MOHALI PUNJAB 160055 UDYAM PB 20 0004625 | S A S NAGAR | PUNJAB | 160055 | ₹1.6 Cr+₹28.4 L (21.5%) | L5 | Rejected-Finance rejected being L5 |
Tender Value
₹1.7 Cr
EMD Value
₹2.1 L
Closing Date
12 Mar 2019, 10:00 amClosed
Executive Engineer Electrical Division HPPWD Mand
Executive Engineer Electrical Division HPPWD Mandi
Construction of 50 Bedded hospital at Bagsaid District Mandi HP SH Providing VRV System therein
2019_PWD_27987_1
PW/MED/TA/e-notice /18-19-10132-38 dt 14.02.19
Open Tender
Electrical Works
Item Rate
365 days
Bagsaid
Please refer to bid document
11 documents required · 11 mandatory
₹5,000
Executive Engineer Electrical Division HPPWD Mand
₹2.1 L
27 Feb 2020
2 Mar 2019
12 Mar 2019
2 Mar 2019
12 Mar 2019
2 Mar 2019
Amount
EQUIPMENT:- VRV Outdoor Unit:- SITC of Air Cooled VRV/VRF units with scroll Compressor capable of modulating capacity ,i,e it should be able to vary speed of the compressor as per the varying load conditions and works on R410A with heating & cooling both.The outdoor unit shall be a factory assembled unit housed in a sturdy weather proof casing constructed from rust-proofed mild steel panels coated with powder coated finish.The outdoor unit shall have multiple scroll compressors and be able to operate even in case of breakdown of one of compressor. Each ODU should have 100% Multiple Inverter Compressors . Each unit shall be equipped, with an oil separator to ensure stable operation with long refrigerant piping. Variable refrigerant flow modular type air- conditioning system suitable for Cooling/Heating by inverter driven capacity control compressor Outdoor unit having minimum COP at 100% Load to be 3.9 and at 50% Load to be 5.5 at 35 deg. Outside ambient conditions. Outdoor Units of bigger cacpacities>20HP shall be given preference. Make Daikin, Mitsubishi Elect, Samsang, Votas, Hitachi, Toshiba, Blue Star or any equivalent make. Cat-A
48 HP Module (Heat Pump Type)
VRV Indoor Unit :- Supply, installation, testing and commissioning of below mentioned Indoor type air conditioners complete with fan and fan motor, controls, Ref net joints, inter connecting it with refrigerant piping, insulation , cabling, Remote,Pannel etc. as per specification and drawing. Make Daikin, Mitsubishi Elect, Samsang, Votas, Hitachi, Toshiba, Blue Star or any equivalent make. Cat-A
Four Way Cassette 2.6 TR
Four Way Cassette 4.0 TR
Hi Wall 1.0 TR
Hi Wall 1.6 TR
Hi Wall 2.0 TR
Supply ,Installation, testing and Commissioning of Centralised Touch Controller as per PWD specification
PIPING AND VALVES:- Refrigerant Piping Supply and Installation of Interconnecting Refrigerant Piping of various sizes as required for the full functionality of the VRF system etc. complete in all respects duly insulated with closed cell nitrile rubber as per specifications of the manufacturer. the contractor shall submit a detailed drawing approved by the manufacturer showing the piping sizes & layout to be followed at the site with the tender document. the contractor shall also get the drawings showing outdoor units in connection with indoor units approved from the consultant in original from and then the head office of the manufacturer with a certificate stating that the piping layout is as per company specifications for full functioning of the VRF system. Standard make I.S.I. as approved by the Engineer in Charge of work.
41.28 mm OD (insulation = 19 mm)
38.10mm OD (insulation = 19 mm)
34.92 mm OD(insulation = 19 mm)
31.75 mm OD(insulation = 19 mm)
28.6 mm OD (insulation = 19 mm)
22.2 mm OD (insulation = 19mm)
19.1 mm OD (insulation = 19 mm)
15.9 mm OD (insulation = 13 mm)
12.7 mm OD (insulation = 13 mm)
9.5 mm OD (insulation = 13mm)
6.4 mm OD (insulation = 13 mm)
Condensate Drain Piping::- Providing UPVC pipes of various sizes for condensed water drainage from Indoor unit to nearest disposal point in toilet/ outside rain water harvesting system as approved by architect/consultant Standard make I.S.I. as approved by the Engineer in Charge of work
40 MM Dia
32 MM Dia
25 MM Dia
All necessary civil works like cutting & chasing of walls/floor/ glass etc. and make them good thereof as per PWD Specification.
Supply of R-410 Refrigerant
POWER & CONTROL WORKS:- Supply, laying, testing and commissioning of power cabling as per specification including end termination as required as per PWD Specification
From MCCB to VRV Outdoor Unit: 4C x 16 Sq. mm Copper Conductor Between Panel and Outdoor Unit
For VRV Indoor Unit :- Providing & fixing of electrical supply Cabling of 2 core x 2.5 sq. mm copper in suitable conduits between IDU & Room ODU. as per PWD Specification.
Control Cabling:- Providing & fixing control cum transmission wiring/ Control Cabling of 2 core x 1.0 sq. mm copper in suitable conduits between indoor and out door unit & indoor unit & its remote controller.
Cable Tray for all ODU power cable works from Min Panel to each ODU units
Earthing with copper earth plate 600 mmx600 mmx 3 mm thick, including accessories and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. ( but without charcoal or coke and salt ) complete as required complete in respect
Extra for using salt and charcoal for G.I. or copper plate earth electrode complete as required complete in respect
Providing and fixing 25mm x 5mm copper strip on surface or in recess for earth connections etc. as required.
Annual Maintenance of Cost.:- Providing comprehensive maintenance for a period of five years including one year warranty bound from date of commissioning & handing over of the equipment to the owner as certified by the Engineer-in-Charge. The contractor shall guarantee the equipment against all effects of materials and workmanship for the period of 5 years, including the compressor. Any effects arising during this comprehensive maintenance period shall be rectified and made good by the vendor at his own risk and cost to the satisfaction owner the contractor will provide sufficient No of service/ operator team (available 12 hours) along with the service spares during the guarantee ( defect) period at site. Any defects, including drain, arising will be attended with in 24 hours. The rates coated by the contractor shall be complete including cost of all labour and material etc
SNOWMEX ENGINEERS LIMITED
CHILL POINT ENGINEERS PVT LTD
Bluestar Ltd.
Complete Cooling Solutions
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .