Loading…
Loading…
| Sl No | Description | Qty | Unit | ANILKUMAR L2 | SHAMEJ T L1 |
|---|---|---|---|---|---|
| 1.00Construction of Super passage | |||||
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 2.32 | cum | 758 ₹1,758.56 | 757 ₹1,756.24 Lowest |
| 1.00 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 6 | sqm | 443 ₹2,658 Lowest | 443 ₹2,658 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 3.8 | cum | 257 ₹977.63 Lowest | 257 ₹977.63 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 2.16 | sqm | 385 ₹831.6 Lowest | 385 ₹831.6 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.35 | cum | 7,941 ₹18,677.23 Lowest | 7,941 ₹18,677.23 Lowest |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 12.38 | sqm | 840 ₹10,402.56 Lowest | 840 ₹10,402.56 Lowest |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.71 | cum | 8,578 ₹31,841.54 Lowest | 8,578 ₹31,841.54 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1.68 | sqm | 763 ₹1,281.84 Lowest | 763 ₹1,281.84 Lowest |
| 1.01 | 5.9.16.2:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsAbove 20 cm wide | 3.04 | sqm | 969 ₹2,945.76 Lowest | 969 ₹2,945.76 Lowest |
Tender Value
₹13.3 L
EMD Value
₹33,217
Closing Date
27 Aug 2025, 6:55 pmClosed
O/ O Executive Engineer KyIP Division Perambra
O/ O Executive Engineer KyIP Division Perambra
Rectification of canal
2025_Irrig_788571_1
IRR/PI/TR/2752/2025_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
kakkodi
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹33,217
Yes
23 Oct 2025
19 Aug 2025
29 Aug 2025
19 Aug 2025
27 Aug 2025
19 Aug 2025
19 Aug 2025 - 27 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1298071.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .