Tender Value
₹16.8 L
EMD Value
₹33,638
Closing Date
21 Jun 2024, 5:30 pmClosed
DGM, ED Kamalpur
O/o the DGM, ED Kamalpur, TSECL, Dhalai Tripura
Ext of HT LT line and installation of 5X25 KVA TD for improvement of Voltage at different SBDTW schemes Para under ED Kamalpur partial turn key basis
2024_POWER_49423_1
DGM/KMP/24-25/02 Dated 12/06/2024
Open Tender
Electrical Works
Turn-key
30 days
ED Kamalpur
As per NIT
3 documents required · 3 mandatory
₹1,000
Yes
₹33,638
Yes
ED Kamalpur
9 Jul 2025
13 Jun 2024
22 Jun 2024
14 Jun 2024
21 Jun 2024
14 Jun 2024
14 Jun 2024 - 15 Jun 2024
15 Jun 2024
Amount
A) Supply of the following materials :-
9 mtr long PCC Pole
8 Mtr. Long PCC Pole
Stay set complete
Stay wire, 7/2.50mm( stranded)
Stay insulator(11KV)
11KV, Pin insulator
11 KV Disc Insulator
11 KV Disc fittings
MS Channel (100*50*50*6)
MS Channel (75*40*40*6)
MS Angle (65*65*6)
MS Angle (50*50*6)
ACSR Weasel(6/1/2.59 mm)( for 11 Kv Line)
G.I Wire 8 SWG(ISS:280/1978)
LT Shackle insulator (3X3 1/2)"
LT Straps and bolts
11Kv G.O Switch ( 3 Phase ), 200 Amp Porcelin type
11Kv D.O Switch ( 3 Phase)Porcelin type
Danger Plate
Wooden Plank made with Segun/Karai tree with all accesseries for fittings
Pipe earthing with all accessories
PVC cable 70 mm².
Cut-out 100 Amps
Alluminium 120 sq. mm size Thimble
Stay insulator(LT)
B) Dismantling of the following :-
09 Mt. long PCC Pole
08 Mt. long PCC Pole
Stay Set Complete
0.3 mt 75x40x40x6 mm SP Top Bkt
1.2 mt.75x40x40x6 mm SP Bottom Bkt
1.5 mt.65X65X6 mm SP Guard Bkt.
11 KV bracket(1.7 mtr long DP TOP Bracket ch.75)
11kv bracket(2.5 mtr long DP Guard Bracket ang. 65)
MS angle X-arm bracket of 4 wire 1.1 mtr. Long
MS angle X-arm bracket of 2 wire 0.6 mtr. Long
Shakle insulator with Nuts & Bolts
11 KV polymer pin insulator.
11 KV single Disc polymer insulator set with fittings
ACSR 6/1/2.59 mm weasel (for 11 kv & LT line)
8 SWG GI wire
1-phase Service connection
3-phase Service connection
C) Re-Erection of dismantling items:
09 Mt. long PCC Pole
08 Mt. long PCC Pole
Stay Set Complete
0.3 mt 75x40x40x6 mm SP Top Bkt
1.2 mt.75x40x40x6 mm SP Bottom Bkt
1.5 mt.65X65X6 mm SP Guard Bkt.
11 Kv bracket(1.7 mtr long DP TOP Bracket ch.75)
11kv bracket(2.5 mtr long DP Guard Bracket ang. 65)
MS angle X-arm bracket of 4 wire 1.1 mtr. Long
MS angle X-arm bracket of 2 wire 0.55 mtr. Long
Shakle insulator with Nuts & Bolts
11 KV polymer pin insulator.
11 KV single Disc polymer insulator set with fittings
ACSR 6/1/2.59 mm weasel (for 11 kv & LT line)
8 SWG GI wire
1-phase Service connection
3-phase Service connection
D). Erection of the New Supply Materials
09 Mt. long PCC Pole
08 Mt. long PCC Pole
Stay Set Complete
Erection of Wooden Plank made with Segun/Karai tree with all accesseries for fittings
2.8 mt.long 100X40X40X6 mm ms channel Sub-Station Top bracket (line channel)
2.8 mt.long 75X40X40X6 mm ms channel for line Gang & Sub-Station (for GOS base & DOF unit base)
2.8 mt.long 100X50X50X6 mm ms channel Sub-Station bracket (for Txr base)
0.8 mt.long 100X50X50X6 mm ms channel Sub-Station bracket (for Txr cross bracket)
2.8 mt.long 65X65X6 mm ms angle for GOS Handle bracket
MS angle X-arm bracket of 4 wire 1.1 mtr. Long
MS angle X-arm bracket of 2 wire 0.55 mtr. Long
Shakle insulator with Nuts & Bolts
11 KV polymer pin insulator.
11 KV single Disc polymer insulator set with fittings
ACSR 6/1/2.59 mm weasel (for 11 kv & LT line)
8 SWG GI wire
11 KV GOS Set of 3 (three) phase
11 KV DOF unit set of 3 (three) phase.
Erection & commissioning of 11/0.430 KV,25 KVA three phase distribution transformer including all accessories
Sub-station Earthing by GI pipe 2.5 mtr. Long 40 mm dia i/c earth excavation and refilling with alternate layer of salt and charcoal, GI pipe,clamps, nuts & bolts.
Supply of 2.5 mtr long 40mm dia GI PIPE
Supply of 60kg Salt & 55 kg charcoal( For each pit)
E. Supply/Providing of the following materials :-
MS clamp made by 50X6 mm MS flate for bracket i/c 16X75 mm Nuts & bolt.
MS clamp made by 50X6 mm MS flate for stay set & strain screw i/c 16X75 mm Nuts & bolt.
Supply and erection of sub-station fencing with erection of 10 nos. 2.5 mt long (65X65X6 mm) MS Angle post with grouting of Vol 0.045 cum at the ratio of 1:2:4 (1 cement: 2 river sand: 4 jhama bri ck aggregate) per post.The fencing should be made 9(nine) horizontal of barbed wire and one gate with shutter (2X1.7)m i/c locking arrangement etc.complete as per direction of the Engineer-in-charge.
Supply of 4 sq.mm. PVC wire for service connection
Supply of 10 sq.mm. PVC wire for service connection
F).Carriage of the following by Mechanical/Handcart/Mannual transport from work Site to Sub-Division Store yard/ work site within 25 KM:-
Carriage of DTR from MMD Division Agartala to to Work Site
Carriage of 9 mtr length of P.C.C poles by Machnical Transport Beyond 25 KM upto the lead of 50 KM
Carriage of 8 mtr length of P.C.C poles by Machnical Transport Beyond 25 KM upto the lead of 50 KM
G) Stratenining/ stringing of the following:-
9mtr Steel pole
9mtr PCC Pole
8 mtr. PCC pole
8 mtr. Steel pole
A.C.S.R.6/1/2.59 mm
Maintaining adequate clearance from overhead live conductors by trimming of tree branches for way leaves
RATAN PAUL (BID ID -140318)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .