| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | ₹4.0 L | L1 | Accepted-AOC Lowest Bidder |
| Sl No | Description | Qty | Unit | SANTHOSH MATHEW L1 |
|---|---|---|---|---|
| 1.00Civil works | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 83.08 | cum | 226.05 ₹18,781.14 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 41.54 | cum | 114.96 ₹4,775.67 |
| 1.00 | OD229960/2025-2026:
Dry Rubblemasonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 including cost of all materials and labour charges Etc. | 42.95 | cum | 3,503.97 ₹1.5 L |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 701.8 | kilogram | 98.64 ₹69,225.55 |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 7.02 | cum | 11,794.49 ₹82,773.73 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 27.7 | sqm | 843.42 ₹23,358.52 |
| 1.01 | 50.18.8.9.1:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chased and making good the wall etc. 110 mm pipe 6kgf/cm2 | 64 | metre | 721.24 ₹46,159.36 |
| 1.01 | 50.18.9.22.4:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement- 110 mm dia Bend | 6 | no | 153.57 ₹921.42 |
| 1.01 | 50.18.9.22.5:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes including jointing with PVC solvent cement 110x110x110 mm dia Tee | 4 | no | 166.6 ₹666.40 |
Tender Value
₹4.2 L
EMD Value
₹10,562
Closing Date
13 Mar 2026, 3:00 pmClosed
Assistant Executive Engineer
PWD Building Sub Division, Mananthavady
GENERAL-Construction of New Waste water Pit for Government Engineering College Boys Hostal Wayanad Mananthavady -works-General Civil Work-1-Urgent work
2026_PWD_839322_2
PWD/BLDG/17814/2025-2026
Open Tender
Civil Works - Buildings
60 days
Mananthavady
Please refer Tender documents.
11 documents required · 11 mandatory
₹935
Yes
₹10,562
Yes
17 Jun 2026
7 Mar 2026
16 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
Civil works
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
OD229960/2025-2026: Dry Rubblemasonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 including cost of all materials and labour charges Etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
50.18.8.9.1:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chased and making good the wall etc. 110 mm pipe 6kgf/cm2
50.18.9.22.4:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement- 110 mm dia Bend
50.18.9.22.5:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes including jointing with PVC solvent cement 110x110x110 mm dia Tee
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1427066.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
sbdnew.pdf
Tender Documents • 2.58 MB
BOQ_1427066.xls
BOQ • 0.30 MB
nitpiteng.pdf
Other Document • 0.03 MB
Download all tender documents and submit your bid