Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.5 LAccepted-AOC | L1 | Accepted-AOC AGREEMENT ALREADY EXECUTED .DELAY OCCURRED IN EVALUATION STAGE | |
| 2 | L2₹15.5 L+₹5,708 (0.37%)Rejected-AOC | L2 | Rejected-AOC NOT ELIGIBLE FOR AOC | |
| 3 | Rejected-Technical | - | Rejected-Technical L5 | |
| 4 | Rejected-Technical ASSISTANT ENGINEER LSGD POOR GRAMA PANCHAYAT KIZHKKOMBEL KOORACHUNDU P O 686634 | KOTTAYAM | KERALA | 686634 | - | Rejected-Technical L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical L3 |
Tender Value
₹18.2 L
EMD Value
₹45,538
Closing Date
11 Oct 2024, 9:00 amClosed
ASSISTANT ENGINEER, MARADY GP
ASSISTANT ENGINEER, MARADY GP
DEPOSIT-228/24 Phc first-floor construction-Marady Gp
2024_LSGD_693716_1
ET1/228/AE/LSGD/MARADY/2024
Open Tender
Civil Works - Others
Item Rate
180 days
MARADY G P
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
₹45,538
30 Oct 2024
4 Oct 2024
14 Oct 2024
4 Oct 2024
11 Oct 2024
4 Oct 2024
Amount
BUILDING CONSTRUCTION
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.4.2:Hollow block masonry using pre cast block (Factory made) of size 40x20x20 cm or nearest available size confirming to IS 2185 part 1 of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
SAJI T JACOB
PRINCE M P
ELDHOSE PHILIP
Benny joseph
Bidder Name
PRINCE M P
SAJI T JACOB
Benny joseph
ELDHOSE PHILIP
DK INFRASOLUTIONS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1080494.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .