| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.3 LAccepted-Finance ANWALKHEDA MR | ₹66.3 L | L1 | Accepted-Finance DUE TO LOWER RATE |
| 2 | L2₹66.6 LRejected-Finance 01 JYOTI VIHAR COLONY DELHI ROAD SAHARANPUR SAHARANPUR SAHARANPUR UTTAR PRADESH 247001 UDYAM UP 64 0004159 | SAHARANPUR | UTTAR PRADESH | 247001 | ₹66.6 L | L2 | Rejected-Finance DUE TO HGIHER RATE |
| 3 | Rejected-Technical BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | - | - | Rejected-Technical NON RESPONSIVE AS PER ATTACHED DISPOSAL REPORT OF COMMITTEE |
| 4 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE AS PER ATTACHED DISPOSAL REPORT OF COMMITTEE |
Tender Value
₹66.6 L
EMD Value
₹1.3 L
Closing Date
20 May 2026, 12:00 pmClosed
SE RED CIRCLE BAREILLY
SE RED CIRCLE BAREILLY OFFICE
Construction of the road from Bakenia Veerpur to Dunka. Development Block Shergarh
2026_REDUP_1145357_25
13/RED/Nivida file Bareilly/E Nivida/2026-27 dated 01-04-2026
Open Tender
Civil Works - Roads
120 days
SHERGARH BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.3 L
SE RED CIRCLE BAREILLY
1 Jul 2026
6 May 2026
20 May 2026
6 May 2026
20 May 2026
6 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | BOQ | - | - | - | - |
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 4,097.81 | cum | 82.65 | ₹3,38,684 |
| 2 | Excavation in foundation in ordinary soil, loame, clay or sand inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches. SI. No. 251. | 101.73 | cum | 198.55 | ₹20,198.49 |
| 3 | First class Brick work in 1:4 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305. | 4.17 | cum | 5,225 | ₹21,788.25 |
| 4 | Struck Pointing with cement mortar consisting of one part of cement and two parts of coarse sand of 2.25 FM on brick work inculding supply of all Material, Labour and T & P etc. required for proper completion the work. As per S.I. No. 574. | 10.5 | Sqm | 233.7 | ₹2,453.85 |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 280.04 | cum | 2,756.62 | ₹7,71,963.86 |
| 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber applying and brooming stone screening / binding material to fill up the interstics of coarse aggregate, watering and compacting to the required dencity . Grading - II ( with 45-63 mm size stone ballast) As per technical specification clause 405. | 484.18 | cum | 3,836.39 | ₹18,57,503.31 |
| 7 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber applying and brooming stone screening / binding material to fill up the interstics of coarse aggregate, watering and compacting to the required dencity . Grading - III ( with 22.40-53 mm size stone ballast) As per technical specification clause 405. | 440.16 | cum | 3,609.72 | ₹15,88,854.36 |
| 8 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 | 5,868.75 | Sqm | 50.07 | ₹2,93,848.31 |
| 9 | Providing and applying Tack coat with bitumen emulsion(RS-1) using emulsion distributor @ 0.275 kg. per Sqm. On the prepared granuler surface treated with priner & cleaned with Hydaulic broom as per Technical Specification Clause 503. | 5,868.75 | Sqm | 24.8 | ₹1,45,545 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.80 MB
BOQ_2141366.xls
BOQ • 0.25 MB
25-T2ofBakenia.pdf
Tender Documents • 4.19 MB