EXECUTIVE ENGINEER
JAL SHAKTI DIVISION DHARMSHALA
Laying jointing and testing of DI K7 pipe 150mmdia and Co RCC manhole chamber near house of Col.AD Singh at Dharamkot
2025_HPIPH_107266_1
EE-JSD-EA-2025- 3507-3608
Open Tender
Civil Works
Item Wise
90 days
DHARMSHALA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹6,030
19 Jun 2025
9 Jun 2025
19 Jun 2025
9 Jun 2025
19 Jun 2025
12 Jun 2025
9 Jun 2025 - 12 Jun 2025
Amount
Excavation in foundation (trenches for M/holes) upto all depths in all classification of earth work such as pick work, jumper work, blasting soft/hard rock or chieselling soft/hard rock where blasting is prohibited, cutting of matelled bitumenous roads / pucca pavements i/c saturated soil/ bailing or pumping out water in all lifts including trimming and dressing of sides,levelling of beds to correct grade including shoring,strutting, planking, timbering and dewatering wherever required, stacking the useable and un-usable material/soil separately and after laying, jointing and testing of pipes returning the useable soil to trenches in 15cm (fifteen centimeters)layers including consolidating of each deposited layer by ramming and watering and then disposing of all surplus excavated soil,un-usable materials as directed within all leads and lifts including restoration of un-metalled surfaces to its original condition and also including cost of diversion of traffic,night signals,fixing caution boards,crossing over trenches for access to houses, fencing etc. complete in all respects as per direction and to the entire satisfaction of Engineer-in-charge witnin all leads and lifts.
Excavation in foundation, trenches etc.in earth work, lift up to 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the excavated soil in 15cm. Layers, when required in to plinth, side of foundation etc.consolidating each deposited layer by renmming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick jumper work complete in all respect as per the dircetion and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. .
Providing and laying cement concrete 1:4:8(1:cement :4 sand:8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth i/c carriage of material complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts.
Providing and Laying cement concrete 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:-
In foundation and plinth complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge.
In suspended floor roofs,landings, shelves and their supports balconies, beams girders bressumers and centilevers upto floor two level i/c carriage of material complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge.
Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batterns and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in-situ-reinforced concrete and plain concrete work in:-
Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge.
Flat surfaces such as soffits of sunspended floor, roofs landings and the like floors etc upto 200mm thickness complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge..
Providing and laying reinforcement cement concreate work 1:1½:3 (1 cement: 1½ sand:3 graded Stone 20 mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work: In walls(any thickness) and not less than 0.10 mtr thickness attached pillaster buttresses, plinth and string courses etc from top of foundation level up to floor two level complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts.
Providing and laying of Mild steel /Tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level (tor steel) complete in all respect including all leads and Lifts as per the direction and satisfection of Engineer-In-Charge.
Providing & fixing of precast RCC (SFRC) manhole cover with frame conforming to IS specifications Code- 12592 Part-I & II with latest amendment (Medium duty) complete in all respect within all leads and lifts as per the directions and to the entire satisfaction of Engineer-in-charge.
Laying, jointing and testing of Ductile Iron pipes conforming to IS : 8329 : complete in all respects as per direction and to the entire satisfaction of Engineer-in-charge witnin all leads and lifts.
150 mm dia Ductile Iron Class K-7 pipes
Laying push-on-joints to Ductile Iron Pipes including testing of joints and the cost of Ruber Gaskets Conforming to I.S 5382 of S.B.R quality 150mm dia. complete in all respect i/c all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge.
Ajay kumar (BID ID -526009)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .