| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Technical | L1 | Admitted-Technical All required doucuments were found. | |
| 2 | L2₹5.0 L+₹7,383 (1.51%)Admitted-Technical | L2 | Admitted-Technical All required doucuments were found. | |
| 3 | L3₹5.0 L+₹12,893 (2.63%)Admitted-Technical | L3 | Admitted-Technical All required doucuments were found. |
| Sl No | Description | Qty | Unit | M/S FANCY ELECTRIC AND STEEL FABRICATORS L2 | M/S POWER PACK ELECTRICAL n MECH ENGG WORKS L3 | M/S MALIK ELECTRICAL WORKS L1 |
|---|---|---|---|---|---|---|
| 2.00 | Supply,Carraige upto site, Installation, testing and Commissioning of 11/0.433KV,100 KVA 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2 | 1 | Nos | 1,98,800 ₹1,98,800 | 1,99,500 ₹1,99,500 | 1,98,000 ₹1,98,000 Lowest |
| 3.00 | Supply,Carraige upto site, Erection, testing and commissioning of Steel Tubular Pole, 9 Mtr. Long Pole(ST-410 SP33) with planting depth of 1/6 th of the height of the pole, (9 mtr. Long ) | 3 | Nos | 72,600 ₹72,600 | 73,800 ₹73,800 | 72,000 ₹72,000 Lowest |
| 4.00 | Supply, Carriage up to site, Erection, testing and commissioning of Steel Tubular Pole, 8 Mtr. Long Pole(SP15) with planting depth of 1/6 the of the height of the pole, (8 mtr. Long ) | 2 | Nos | 38,000 ₹38,000 | 37,600 ₹37,600 | 37,200 ₹37,200 Lowest |
| 5.00 | Supply, Carriage up to site, laying ,stringing, tensioning , binding of ACSR Conductor, (30mm2 ACSR Conductor) | 0.45 | Kms | 18,607.5 ₹18,607.5 | 18,720 ₹18,720 | 18,450 ₹18,450 Lowest |
| 6.00 | Supply, Carriage up to site, laying ,stringing, tensioning , binding of ACSR Conductor, (50mm2 ACSR Conductor) | 0.2 | Kms | 14,180 ₹14,180 | 14,400 ₹14,400 | 14,000 ₹14,000 Lowest |
| 7.00 | Supply,Carraige upto site, and fixing of GI Channel Iron x-arm 9' long 100x50x6mm including suitable clamps/collars (32 kg/No.) | 64 | Kgs | 11,904 ₹11,904 | 12,096 ₹12,096 | 11,840 ₹11,840 Lowest |
| 8.00 | Supply,Carraige upto site, and fixing of GI Channel Iron x-arm 9' long 75x40x6mm including suitable clamps/collars (22 kg/No.) | 176 | Kgs | 32,912 ₹32,912 | 33,264 ₹33,264 | 32,560 ₹32,560 Lowest |
| 9.00 | Supply, Carriage up to site, and fixing of GI V-Cross & F-Top duly fabricated as per REC Standards including clamps(50x6 mm) & GI Nuts & Bolts (19 kg/No.) | 57 | Kgs | 10,659 ₹10,659 | 10,773 ₹10,773 | 10,545 ₹10,545 Lowest |
| 10.00 | Supply, Carriage up to site, Installation, testing and Commissioning of GI Angle iron 9' length 50X50X6mm along with complete clamping arrangement (for Tranformer Belting) (16 KG/No.) (16 KG/No.) | 32 | Kgs | 6,016 ₹6,016 | 6,080 ₹6,080 | 5,920 ₹5,920 Lowest |
| 11.00 | Supply, Carriage up to site, Installation, testing and Commissioning of 11 KV Pin Insulators (Polymer) with Pins (5KN) | 9 | Nos | 3,240 ₹3,240 | 3,600 ₹3,600 | 3,150 ₹3,150 Lowest |
Tender Value
₹5.0 L
Closing Date
16 Oct 2021, 4:00 pmClosed
EXECUTIVE ENGINEER ELECTRIC DIVISION BARAMULLA
EXECUTIVE ENGINEER ELECTRIC DIVISION BARAMULLA
Creation of 100kVA substation at Reshimuqam Panjiwara under UT and District Capex Budget 2021-22 PRI Grants
2021_PDD_142235_1
EDB/177
Open Tender
Electrical Works
Turn-key
45 days
Creation of 100kVA substation at Reshimuqam Panjiw
Please refer Tender documents.
6 documents required · 6 mandatory
₹221
EXECUTIVE ENGINEER ELECTRIC DIVISION BARAMULLA
Exempted
25 Oct 2021
1 Oct 2021
18 Oct 2021
1 Oct 2021
16 Oct 2021
2 Oct 2021
1 Oct 2021 - 2 Oct 2021
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .