Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.5 LAccepted-AOC | 1 | Accepted-AOC L1 accepted | |
| 2 | 2₹21.6 L+₹1.5 L (7.66%)Rejected-AOC | 2 | Rejected-AOC L2 rejected |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
10 Oct 2022, 4:00 pmClosed
Executive Engineer Electrical
Office of the Executive Engineer Electrical Division Travancore Devaswom Board Chengannur 689121
Sabarimala Devaswom - MnM festivals in 1198ME-Annual Overhauling, repairs,maintenance, reconditioning and supply of spares for boilers installed at Sabarimala
2022_TDB_512093_1
TDB/EEE/ET-03/2022- 23
Open Tender
Repair and Maintenance Works
Item Rate
95 days
sabarimala
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,950
₹25,000
17 May 2023
1 Oct 2022
12 Oct 2022
1 Oct 2022
10 Oct 2022
1 Oct 2022
Amount
Appendix A.. Supply of Spares
COTACTOR 9A
CONTACTOR 16 A
DIGITAL TEMPERATURE CONTROLLER DTC 0-400 C -513
FUEL PUMP AJ6
GLAND WASHER
HT CABLE
METALLIC BRIADED HOSE 3/8X40
NOZZLE 5.5 GPH, 45 DEG HO, MONARCH
NOZZLE 6.5 GPH, 45 DEG HO, MONARCH
NOZZLE 9.5 GPH, 60 DEG HO, MONARCH
NOZZLE 3 GPH, 45 DEG HO, MONARCH
OLR 2.5 TO 4 AMP
SAFETY VALVE-1 1/2"
SAFETY VALVE-1"
SIGHT GLASS 50 MM
SEQUENCE CONTROLLER MA 810
THERMIC FLUID
VALVE SEAT ASSEMBLY
V BELT A 44
V BELT A 52
VALVE BLOW DOWN 3/4"
V BELT A 42
V BELT A 54
OPTIMISER RXA 02
DIESEL FILTER 1 LIT
PHOTO RESISTER
RESIN
Appendix B OVERHUALING & RECONDITIONING OF BOILERS
400000 Kcal/hr Thermax Make Thermic Fluid Boiler at Appapura for appom preparation. a) Reconditioning of thermic fluid generator TP-04 including cleaning of coil by using suitable wire brush and wiping the surface with cotton waste, combustion chamber, checking of top and bottom refractory, blower assembly, burner assembly like diffuser plate, electrode assembly, nozzle, photocell mountings, sight glass etc. and reassembling the coil with new standard high quality gaskets and packing. b) Cleaning the diesel tank, fuel line filters, strainers, fuel pump valves and providing proper packing to the valve, NRV, strainers and ensuring trouble free operation. c) Thermic fluid system - cleaning of thermic fluid pipeline falnges and cleaning and re-setting of SLSV, NRV, valves, etc. repairing and re-conditioning of damaged pipeline parts and fittings, providing proper gland packing for valves with fitting arrangement etc. and ensuring leak proof trouble free operation of thermic fluid heater. d) Repair and reconditioning of control panel of boiler ensuring perfect and trouble free operation of all switch gears , control gears and parts like MCBs, contactors, switches, OLRs, visual and alarm monitors, sequence controller, temperature controller, photocell, pressure switch, solenoid, motors, transformer, interconnecting cable etc. and keep the system ready for smooth operation. e) Rectification of minor fluid leaks and pipelines and karas. f) Painting of boiler such as panel board etc. g) Overhauling of thermic fluid pump.
850 Kg/hr Thermax make Steam Boiler installed at Aravanapura for aravana preparation. a) Dismantling, cleaning and reconditioning of steam boiler 850 Kg/hr, cleaning of coil using suitable wire brush and wiping the surface with cotton waste, combustion chamber, checking of top and bottom refractory, blower assembly, burner assembly, electrode assembly, nozzle, photocell mountings, sight glass etc. and reassembling the unit with high quality packings. b) Cleaning the water line, water tank, strainers, valves, optimizer, economizer tube, chamber and providing high quality gland packings, gaskets, etc. c) Descaling of coil and pipe line using 5% - 10% descaling chemicals or other type of harmless cleaning media of duration of 12 hr and ensuring the boiler water system of leak proof trouble free and smooth operation during festival season. d) Overhauling and reconditioning of feed water pump, fuel pump and blower assembly. e) Cleaning and reconditioning of diesel day tank, fuel and interconnecting pipe line, steam lines, steam valves, filters, strainers, NRV, valves and providing proper packing for leak proof and trouble free operation, steam line, steam valve. f) Painting of boiler such as panel board etc.
500 Kg/hr Thermax make Steam Boiler installed at Devaswom Mess for food preparation. a) Dismantling, cleaning and reconditioning of steam boiler 500 Kg/hr, cleaning of coil using suitable wire brush and wiping the surface with cotton waste, combustion chamber, checking of top and bottom refractory, blower assembly, burner assembly, electrode assembly, nozzle, photocell mountings, sight glass etc. and reassembling the unit with high quality packings. b) Cleaning the water line, water tank, strainers, valves, optimizer, economizer tube, chamber and providing high quality gland packings, gaskets, etc. c) Descaling of coil and pipe line using 5% - 10% descaling chemicals or other type of harmless cleaning media of duration of 12 hr and ensuring the boiler water system of leak proof trouble free and smooth operation during festival season. d) Overhauling and reconditioning of feed water pump, fuel pump and blower assembly. e) Cleaning and reconditioning of diesel day tank, fuel and interconnecting pipe line, steam lines, steam valves, filters, strainers, NRV, valves and providing proper packing for leak proof and trouble free operation, steam line, steam valve. f) Painting of boiler such as panel board etc.
300 Kg/hr Thermax make Steam Boiler installed at Medicated drinking water plant for medicated drinking water preparation. a) Dismantling, cleaning and reconditioning of steam boiler 300 Kg/hr, cleaning of coil using suitable wire brush and wiping the surface with cotton waste, combustion chamber, checking of top and bottom refractory, blower assembly, burner assembly, electrode assembly, nozzle, photocell mountings, sight glass etc. and reassembling the unit with high quality packings. b) Cleaning the water line, water tank, strainers, valves, optimizer, economizer tube, chamber and providing high quality gland packings, gaskets, etc. c) Descaling of coil and pipe line using 5% - 10% descaling chemicals or other type of harmless cleaning media of duration of 12 hr and ensuring the boiler water system of leak proof trouble free and smooth operation during festival season. d) Overhauling and reconditioning of feed water pump, fuel pump and blower assembly. e) Cleaning and reconditioning of diesel day tank, fuel and interconnecting pipe line, steam lines, steam valves, filters, strainers, NRV, valves and providing proper packing for leak proof and trouble free operation, steam line, steam valve. f) Painting of boiler such as panel board etc.
600 Kg/hr Thermax make Steam Boiler installed at Annadanamandapam for annadanam preparation a) Dismantling, cleaning and reconditioning of steam boiler 600 Kg/hr, cleaning of coil using suitable wire brush and wiping the surface with cotton waste, combustion chamber, checking of top and bottom refractory, blower assembly, burner assembly, electrode assembly, nozzle, photocell mountings, sight glass etc. and reassembling the unit with high quality packings. b) Cleaning the water line, water tank, strainers, valves, optimizer, economizer tube, chamber and providing high quality gland packings, gaskets, etc. c) Descaling of coil and pipe line using 5% - 10% descaling chemicals or other type of harmless cleaning media of duration of 12 hr and ensuring the boiler water system of leak proof trouble free and smooth operation during festival season. d) Overhauling and reconditioning of feed water pump, fuel pump and blower assembly. e) Cleaning and reconditioning of diesel day tank, fuel and interconnecting pipe line, steam lines, steam valves, filters, strainers, NRV, valves and providing proper packing for leak proof and trouble free operation, steam line, steam valve. f) Painting of boiler such as panel board etc.
200 Kg/hr Thermax make Steam Boiler installed at Medicated Drinking water preparation plant a) Dismantling, cleaning and reconditioning of steam boiler 200 Kg/hr, cleaning of coil using suitable wire brush and wiping the surface with cotton waste, combustion chamber, checking of top and bottom refractory, blower assembly, burner assembly, electrode assembly, nozzle, photocell mountings, sight glass etc. and reassembling the unit with high quality packings. b) Cleaning the water line, water tank, strainers, valves, optimizer, economizer tube, chamber and providing high quality gland packings, gaskets, etc. c) Descaling of coil and pipe line using 5% - 10% descaling chemicals or other type of harmless cleaning media of duration of 12 hr and ensuring the boiler water system of leak proof trouble free and smooth operation during festival season. d) Overhauling and reconditioning of feed water pump, fuel pump and blower assembly. e) Cleaning and reconditioning of diesel day tank, fuel and interconnecting pipe line, steam lines, steam valves, filters, strainers, NRV, valves and providing proper packing for leak proof and trouble free operation, steam line, steam valve. f) Painting of boiler such as panel board etc.
300 Kg/hr Thermax make Steam Boiler installed at Police mess for food preparation a) Dismantling, cleaning and reconditioning of steam boiler 300 Kg/hr, cleaning of coil using suitable wire brush and wiping the surface with cotton waste, combustion chamber, checking of top and bottom refractory, blower assembly, burner assembly, electrode assembly, nozzle, photocell mountings, sight glass etc. and reassembling the unit with high quality packings. b) Cleaning the water line, water tank, strainers, valves, optimizer, economizer tube, chamber and providing high quality gland packings, gaskets, etc. c) Descaling of coil and pipe line using 5% - 10% descaling chemicals or other type of harmless cleaning media of duration of 12 hr and ensuring the boiler water system of leak proof trouble free and smooth operation during festival season. d) Overhauling and reconditioning of feed water pump, fuel pump and blower assembly. e) Cleaning and reconditioning of diesel day tank, fuel and interconnecting pipe line, steam lines, steam valves, filters, strainers, NRV, valves and providing proper packing for leak proof and trouble free operation, steam line, steam valve. f) Painting of boiler such as panel board etc.
500 Kg/hr Thermax make Steam Boiler installed at Police mess for food preparation a) Dismantling, cleaning and reconditioning of steam boiler 500 Kg/hr, cleaning of coil using suitable wire brush and wiping the surface with cotton waste, combustion chamber, checking of top and bottom refractory, blower assembly, burner assembly, electrode assembly, nozzle, photocell mountings, sight glass etc. and reassembling the unit with high quality packings. b) Cleaning the water line, water tank, strainers, valves, optimizer, economizer tube, chamber and providing high quality gland packings, gaskets, etc. c) Descaling of coil and pipe line using 5% - 10% descaling chemicals or other type of harmless cleaning media of duration of 12 hr and ensuring the boiler water system of leak proof trouble free and smooth operation during festival season. d) Overhauling and reconditioning of feed water pump, fuel pump and blower assembly. e) Cleaning and reconditioning of diesel day tank, fuel and interconnecting pipe line, steam lines, steam valves, filters, strainers, NRV, valves and providing proper packing for leak proof and trouble free operation, steam line, steam valve. f) Painting of boiler such as panel board etc.
Appendix C…. Replacing the defective steam and condesate piping inside the Aravana preparation plant, devaswom mess, police mess, medicated drinking water etc. Design, supply, fabrication and erection of condensate line and drain lines from to various cooking vessels and distribution lines made of MS C class pipes, 314 SS pipes and steam Globe valves including cutting and welding charges. Transportation charges, consumables, necessary flanges, bends, gaskets, barrel nipple, nut and bolt etc
80 NB MS C Class pipe
50NB MS C Class pipe
40 NB MS C Class pipe
25 NB MS C Class pipe
20 NB MS C Class pipe
15 NB MS C Class pipe
Insulation of steam pipelines using mineral wool covered with chicken mesh and cladded with aluminum sheet of suitable thickness for a total insulation thickness of 50 mm
HARILAL P.V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_733617.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .