| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.1 CrAccepted-AOC OPPOSITE SRI SANATAN DHARMA MANDIR SHIVAM VIHAR COLONY GHAZIABAD U P | ₹2.1 Cr | L-1 | Accepted-AOC Work awarded |
| 2 | L-2₹2.1 Cr+₹22,828.15 (0.11%)Rejected-Finance | ₹2.1 Cr+₹22,828.15 (0.11%) | L-2 | Rejected-Finance Due to higher rate |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Due to non submission of tender cost DD and rate validity |
Tender Value
Refer Docs
EMD Value
₹4.3 L
Closing Date
25 Jan 2024, 12:00 pmClosed
Superintending Engineer
Electricity Distribution Circle, Rudrapur
Replacement of 33 KV line ACSR Panther conductor to HTLS Panther conductor emanating from 220/132/33 KV Substation Pantnagar to 33/11 KV S/s Sector-03, SIDCUL, Pantnagar under Electricity Distribution Division, Rudrapur-I
2024_UPCL3_67489_1
EDC(USN)53/2023-24
Open Tender
Electrical Works
Item Rate
90 days
SIDCUL, Rudrapur
Pl. refer tender document
4 documents required · 4 mandatory
₹11,800
EE ETD Rudrapur
₹4.3 L
14 May 2024
10 Jan 2024
27 Jan 2024
10 Jan 2024
25 Jan 2024
10 Jan 2024
Amount
Annexure -A ( Works )
Erection of SP-72 single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual.
Erection of SP-72 double support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings & clamps as per RESPO manual.
Dismantling of existing LT/HT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light connections etc. including rolling of conductor and cartage back from site to JE store (SP-72 Double Pole)
Guarding of 33 KV Line over (Telephone/ Road / L.T. line crossing as per drawing with 6/8 SWG G.I. wire including fixing of guarding channel/ angle as per RESSPO manual.
Cartage of ST pole SP-72 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 0-20 Km)
Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(distance 0-20 Km)
Headload cartage of SP-72 Pole from road to site(distance 0-1 Km)
Dismantling of 33 kv line(panther/dog)
Laying G.S. Earth wire 7/16 SWG for providing Earth Wire on 33 KV Line.
Erection / Installation, Testing, Commissioning of Proposed HTLS Composite Carbon Core Conductor with Hardware Fittings and Accessories in the above Line as per Technical Specification, Direction of The Engineer-in-Charge, complete in all respect.
Back Cartage of Scrap Materials
Annexure - B ( Supply )
Supply of Holding Clamp for Gaurding
Supply of X ARM F Type Hold Clamp MS SP72- 75x8mm
Supply of PP & Clamp with N&B, ST Pole SP-72
Supply of Stay Clamp For SP-72 with N&B
Supply of Eye Bolt.
Supply of Earth Clamp STP SP-33/55/72 Pole
Supply of Suspension Clamp HTLS
Supply of Dead End Clamp HTLS
Supply of Vibration Damper HTLS
Supply of Repair Sleeve HTLS
Supply of Mid Span Joint HTLS
Supply of alignment ties for ACSS HTLS Conductor
Supply of HTLS (ACSS) Conductor 700 Amp Capacity
Raj Shyama Constructions Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .