Tender Value
₹54.4 L
EMD Value
₹1.1 L
Closing Date
17 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
WORKS 2
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less: where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Electrical contractor license: - The contractor should have valid electrical contractor license issued by government and submit along with tender document. If valid electrical contractor license is not submitted along with tender document, then offer will be summarily rejected.
3 conditions · 1 needing a document upload
Bidder / Tenderer should submit GST registration certificate along with PAN card & Bank mandate while bidding / uploading tender documents.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
I / We have visited the works site and I / We am / are aware of the site conditions.
Repairing, rewinding, reconditioning and lowering/lifting etc. of submersible pumps over JU Division for the period of 22 months
10Rof2026-27
10Rof2026-27
Open
Works - General
22 Months
Jodhpur, Rajasthan
₹0
₹1.1 L
17 Jul 2026
24 Jun 2026
3 Jul 2026
63 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 54,41,170.2 | ||
| — | Breakup | for details. | — | ||
| Repairing/servicing of Borewell Submersible pumps (Vertical) Motor:- Repairs/ rewinding of submersible pump motor including reconditioning, machining & replacing defective rotor shaft, bush bearing, bottom thrust bearing, shaft sleeves, stud nut bolts & jali ( if required) including attending other defects whatever as required to make the rotor in proper working condition including painting, trial and testing. | — | — | — | 5,15,367.41 | |
| — | Breakup | for details. | — | ||
| Pump:- Repairing of submersible pump set including replacement/ recondition of defective impellers, shaft, bushes, distance pieces, defuses, sleeves including machining (if required) and any other defects whatever as required to make the pump in proper wiring condition including painting and trial and testing | — | — | — | 2,72,511.95 | |
| — | Breakup | for details. | — | ||
| Repairing/Servicing of monoblock Submersible pumps.-Repairs/ rewinding of monoblock submersible pump motor including reconditioning, machining & replacing defective parts & testing and making the pump set in proper working condition including attending other defects whatever as required to make the pump set in proper working condition including painting, trial and testing. | — | — | — | 8,64,800.09 | |
| — | 40.00 | — | — | ||
| Supply, install, test & commissioning of Contactors in starter for up to 15HP pump (to suit fitment in existing panel). As per specification. | — | — | — | 58,366 | |
| — | 10.00 | — | — | ||
| Supply, Install, test & Commissioning of Contactors in Starter for 20HP to 30 HP Pump. (to suit fitment in existing panel).As per specification. | — | — | — | 42,294 | |
| — | 70.00 | — | — | ||
| Supply, install, test & commissioning of Over load relay in starter for 5 to 30 HP pump. (to suit fitment in existing panel). As per specification. | — | — | — | 97,792.1 | |
| — | 75.00 | — | — | ||
| Supply, install, test & commissioning of single phase preventer with timer type in starter. (to suit fitment in existing panel). As per specification. | — | — | — | 1,56,396.75 | |
| — | 30.00 | — | — | ||
| Supply, Install, test &Commissioning of R/Y/G/A indicating lamp in starter. (to suit fitment in existing panel). As per specification | — | — | — | 5,406 | |
| — | 100.00 | — | — | ||
| Supply, install, test & commissioning of terminal block 3way in starter. (to suit fitment in existing panel). As per specification. | — | — | — | 10,213 | |
| — | 100.00 | — | — | ||
| Supply, install, test & commissioning of terminal block 6way in starter. (to suit fitment in existing panel). As per specification. | — | — | — | 17,964 | |
| — | 15.00 | — | — | ||
| Supply, install, test & commissioning of electronic timer in starter for Star-Delta. (to suit fitment in existing panel). As per specification. | — | — | — | 23,580.9 | |
| — | 30.00 | — | — | ||
| Supply, install, test & commissioning of On-Off (Start-Stop) push button in starter panel. (to suit fitment in existing panel). As per specification. | — | — | — | 4,542 | |
| — | 35.00 | — | — | ||
| Supply, install, test & commissioning of Ammeter (0- 125Amp) in starter. (to suit fitment in existing panel). As per specification | — | — | — | 20,334.65 | |
| — | 35.00 | — | — | ||
| Supply, install, test & commissioning of Voltmeter (0-500Volt) in starter. (to suit fitment in existing panel). As per specification | — | — | — | 19,957 | |
| — | 35.00 | — | — | ||
| Supply, install, test & commissioning of Voltmeter selector switch in starter. (to suit fitment in existing panel). As per specification | — | — | — | 20,676.25 | |
| — | 15.00 | — | — | ||
| Supply, Install, test & Commissioning of Ammeter Selector Switch in Starter. (to suit fitment in existing panel). As per specification. | — | — | — | 13,785.3 | |
| — | 60.00 | — | — | ||
| Supply, install, test & commissioning of Standard operating coil (440volt) for contactors in starter. (to suit fitment in existing panel contractor). As per specification | — | — | — | 38,892.6 | |
| — | 10.00 | — | — | ||
| Supply, Install, test & Commissioning of Time Switch in Starter. (to suit fitment in existing panel)as per specification. | — | — | — | 18,931.6 | |
| — | 75.00 | — | — | ||
| Removal & Lowering of pump from the Bore Well including provision of nut bolts, washer, gasket, flange and Welding/turning work and other associate items . | — | — | — | 3,68,941.5 | |
| — | 10.00 | — | — | ||
| Removal &Lowering of pump from the Open Well including provision of nut bolts, washer, gasket, flange and Welding/turning work and other associate items as per specification. | — | — | — | 40,036.2 | |
| — | 55.00 | — | — | ||
| Removal & Lowering of pump from the GLR (Sump) including provision of nut bolts, washer, gasket, flange and welding/turning work and other associate items. As per specification. | — | — | — | 1,29,886.9 | |
| — | 1000.00 | — | — | ||
| Supply and fixing of GI pipe 50 mm dia B class with flange for delivery with flanges, clamps, nut-bolts etc as per spec | — | — | — | 5,79,970 | |
| — | 10.00 | — | — | ||
| Supply and fixing of Fully automatic Star Delta Starter 30kW, Amp Rating 20-32Amp. In sheet- steel enclosure, Motor Rating AC-3 duty 3 Phase of reputed make similar to L& T model no. MU2FASD | — | — | — | 1,26,163 | |
| — | 100.00 | — | — | ||
| Supply and laying of submersible cable 3 core PVC insulated flat with copper conductor 2.5sq. mm. size. | — | — | — | 15,249 | |
| — | 800.00 | — | — | ||
| Supply and laying of submersible cable 3 core PVC insulated flat with copper conductor 3x4sqmm as per spec | — | — | — | 1,79,400 | |
| — | 1500.00 | — | — | ||
| Supply and laying of submersible cable 3 core PVC insulated flat with copper conductor 3x6sqmm as per spec | — | — | — | 4,96,800 | |
| — | 30.00 | — | — | ||
| Supply of starter for motor up to 20HP(Make: L&T/ABB/Siemens/Schneider/BCH) | — | — | — | 7,08,000 | |
| — | 30.00 | — | — | ||
| Replacement of defective starter for motor up to 20HP (Make: L&T/ ABB/ Siemens/ Schneider/ BCH) | — | — | — | 70,800 | |
| — | 20.00 | — | — | ||
| Supply of starter for motor up to 10HP(Make: L&T/ABB/Siemens/Schneider/BCH) | — | — | — | 3,54,000 | |
| — | 20.00 | — | — | ||
| Replacement of defective starter for motor up to 10HP (Make: L&T/ ABB/ Siemens/ Schneider/ BCH) | — | — | — | 35,400 | |
| — | 200.00 | — | — | ||
| Supply and installation of UPVC COLUMN PIPE INNER DIA 50MM (2inch) each pipe length 3 meter, socket ended with elastomeric ring, IS: 2008:1086 with ISI mark, 19 kg/cm2 pressure as per spec. | — | — | — | 1,34,712 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TechSpecSORPUMP.pdf
ATTACHMENT
TenderDocument10ROF202627_1.pdf TENDER DOCUEMENT 10R OF 2026 27
ATTACHMENT
ACS1TO11COMPRESSED.pdf
ATTACHMENT
TenderDocument10ROF202627_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .