Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.1 LAccepted-AOC | L1 | Accepted-AOC the bidder was lowest | |
| 2 | L2₹28.4 L+₹3.3 L (13.1%)Rejected-AOC | L2 | Rejected-AOC The bidder was second lowest |
Tender Value
₹29.4 L
EMD Value
₹50,000
Closing Date
27 Aug 2020, 4:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER TRANSMISSION SUB DIVISION PARUTHIPPARA
Bay extension work of 110kV Substation,Paruthippara Tower rearrangement and line stringing work
2020_KSEB_374209_1
04/TSD PPRA/2020-21 DATED 29-07-2020
Open Tender
Civil Works - Others
Percentage
90 days
TSD PARUTHIPPARA
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
Yes
online
₹50,000
Yes
1 Oct 2020
30 Jul 2020
7 Sept 2020
30 Jul 2020
27 Aug 2020
30 Jul 2020
Amount
Quoted Amount of BOQ1 in figures
GST Rate in percentage
K RAJENDRAN NAIR
K RAJENDRAN NAIR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .