| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-Finance | ₹2.0 L | 1 | Accepted-Finance O.K. |
| 2 | 2₹2.0 LAccepted-Finance | ₹2.0 L | 2 | Accepted-Finance O.K. |
| 3 | 3₹2.0 LAccepted-Finance | ₹2.0 L | 3 | Accepted-Finance O.K. |
| 4 | Not Admitted-Fee/PreQual/Technical 879 SHAHBAD BHOOR BAREILLY BHOOR BAREILLY BAREILLY BAREILLY UTTAR PRADESH 243001 UDYAM UP 15 0003299 | BAREILLY | UTTAR PRADESH | 243001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
18 Jan 2022, 5:00 pmClosed
SE ETC Bareilly
Superintending Engineer Transmission Campus Near L.I.C. Office Rampur Garden, Bareilly
Replacement of complete Gaskets of 40MVA Transformer-I (Technical Associates) alongwith other associated works at 132KV Substation Faridpur under E.T.D., Bareilly
2021_UPTCL_667929_1
E-tender No. 56/ETC(B)/2021-22
Open Tender
Electrical Works
20 days
Bareilly
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE ETC BAREILLY
₹2,000
24 Jan 2022
30 Dec 2021
19 Jan 2022
30 Dec 2021
18 Jan 2022
30 Dec 2021
Amount
Replacement of Complete Gaskets of 40MVA Transformer-I (Technical Associates) along with other associated Works at 132KV Sub Station Faridpur under E.T.D., Bareilly with all Cost of Men, Misc. Consumables, Crane/Hydra, Centrifuging Machine with Operator, Normal & Special T&Ps etc. required for Satisfactory Completion of the Job, as per Technical Specifications & Direction of the Supervising Engineer, as per Details below:
Safe Carriage of 20 KL Capacity Oil Storage Tank from Designated Primary Sub Station in Bareilly (Distance Approx 70 Km) to 132KV Sub Station Faridpur including Shifting & Loading of Oil Storage Tank at Designated Primary Sub Station and Unloading & Shifting of same in Switchyard at 132KV Sub Station Faridpur.
Complete Draining of the Transformer Oil from the above 40MVA Transformer-I into Oil Tanker.
Providing & Replacement of old Gaskets from different Parts (Top Inspection window, Radiators, Pipe Lines, Conservador, Drain valve of Buchholz Relay etc.) of the above 40MVA Transformer. The Scope of Work involves Removal of old Gaskets, Cleaning of Surfaces, Providing & Fabrication of Gaskets of Appropriate Sizes out of Gaskets of Thickness 12/10/8/6 mm of Konica/Torborze/Nu-cork make and Fixing of Gaskets at Proper Place with Adhesive along with other associated Works.
Centrifuging of the Transformer Oil Filled in Oil Tanker, Un-Interrupted till the desired BDV Value of the Oil is Achieved. Filling of Centrifuged Transformer Oil into Main Tank and Radiators of the above 40MVA Transformer from the Oil Tanker, then Centrifuging & Circulation of the Transformer Oil in Transformer with the Help of Centrifuging Machine, Un-Interrupted till the Desired BDV Values of the Transformer Oil and IR Values are Achieved including Recording of all the Parameters such as Temperature, Vacuum, Insulation Resistance, BDV etc. every 2 Hours.
Safe Carriage of 20KL Capacity Oil Storage Tank from 132KV Sub Station Faridpur to Designated Primary Sub Station in Bareilly (Distance Approx. 70 Km) including Shifting & Loading of Oil Storage Tank at Primiery Sub Station and Unloading, Shifting & Placing of same in Switchyard/Storage Place at the Designated Primary Sub Station.
LASHANI ENTERPRISES
SATKAR TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid