Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC KANNAYI KKOODE KIZHAKOMBEL | PATHANAMTHITTA | KERALA | 689694 | ₹13.2 L | L1 | Accepted-AOC First lowest |
| 2 | L2₹13.4 L+₹20,246.29 (1.54%)Rejected-AOC ELAVUMKUDY ALLEPRA P O PERUMBAVOOR 683556 | ERNAKULAM | KERALA | 683556 | ₹13.4 L+₹20,246.29 (1.54%) | L2 | Rejected-AOC Second lowest |
| 3 | L3₹13.4 L+₹23,925.26 (1.81%)Rejected-AOC | ₹13.4 L+₹23,925.26 (1.81%) | L3 | Rejected-AOC Third lowest |
| 4 | L4₹14.2 L+₹97,075.87 (7.36%)Rejected-Finance | ₹14.2 L+₹97,075.87 (7.36%) | L4 | Rejected-Finance Fourth lowest |
| 5 | L5₹14.3 L+₹1.1 L (8.57%)Rejected-Finance ASAMANNOOR GRAMAPANCHAYATH ASAMANNOOR PO | KANNUR | KERALA | 670001 | ₹14.3 L+₹1.1 L (8.57%) | L5 | Rejected-Finance Fifth lowest |
| Sl No | Description | Qty | Unit | TNR Constructions and Developers L1 | RINIL JAMES GEORGE L2 | basil paul L5 | P T PAULOSE L3 | Muhammed Amar L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Car parking area and labours vehicle parking area | ||||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 100.88 | cum | 205 ₹20,680.61 | 257 ₹25,926.42 | 150 ₹15,132.15 Lowest | 190 ₹19,167.39 | 239.08 ₹24,118.63 |
| 1.00 | OD1290/2025-2026:51.2.3. Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 20.28 | cum | 1,291 ₹26,181.48 | 1,150 ₹23,322 | 900 ₹18,252 | 875 ₹17,745 | 844.08 ₹17,117.94 Lowest |
| 1.00 | OD1413/2025-2026:Modi-16.79 Providing , laying spreading and compacting graded stone aggregate ( below 50 mm ) including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers in sub - base / base course on well prepared surface and compacting with road roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer - in- Charge. | 81.2 | cum | 3,312 ₹2,68,934.4 | 2,850 ₹2,31,420 | 2,800 ₹2,27,360 Lowest | 2,870 ₹2,33,044 | 3,024.82 ₹2,45,615.38 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.44 | cum | 7,661 ₹18,692.84 Lowest | 8,000 ₹19,520 | 8,000 ₹19,520 | 8,900 ₹21,716 | 8,570.98 ₹20,913.19 |
| 1.00 | OD702/2025-2026:Mod:16.91.2 Providing and laying factory made chamfered edge Cement Concrete paver blocks
in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength,
thickness & size/ shape, made by table vibratory method using PU mould, laid in
required colour & pattern over 50mm thick compacted bed of sand, compacting and
proper embedding/laying of inter locking paver blocks into the sand bedding layer
through vibratory compaction by using plate vibrator, filling the joints with sand and
cutting of paver blocks as per required size and pattern, finishing and sweeping
extra sand. complete all as per direction of Engineer-in-Charge.80 mm thick C.C. paver block of M-30 grade with approved color design and pattern. | 805 | sqm | 1,016 ₹8,17,880 Lowest | 1,060 ₹8,53,300 | 1,200 ₹9,66,000 | 1,080 ₹8,69,400 | 1,144.14 ₹9,21,032.7 |
| 1.01 | OD1279/2025-2026:Modified :16.91.1-Providing and laying factory made chamfered edge Cement Concrete paver blocks
in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength,
thickness & size/ shape, made by table vibratory method using PU mould, laid in
required colour & pattern over 50mm thick compacted bed of sand, compacting and
proper embedding/laying of inter locking paver blocks into the sand bedding layer
through vibratory compaction by using plate vibrator, filling the joints with sand and
cutting of paver blocks as per required size and pattern, finishing and sweeping
extra sand. complete all as per direction of Engineer-in-Charge.60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern. | 169 | sqm | 892 ₹1,50,748 Lowest | 1,000 ₹1,69,000 | 1,000 ₹1,69,000 | 975 ₹1,64,775 | 1,008.77 ₹1,70,482.13 |
| 1.01 | 16.69:Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature jointed with cement mortar 1:3 ( 1 cement : 3 coarse sand) , including making joints with or without grooves ( thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge ( length of finished kerb edging shall be measured for payment ). ( Precast C.C. kerb stone shall be approved by Engineer-in-Charge) | 1.6 | cum | 9,453 ₹15,124.8 Lowest | 10,000 ₹16,000 | 10,000 ₹16,000 | 10,200 ₹16,320 | 10,023.77 ₹16,038.03 |
Tender Value
₹15.3 L
EMD Value
₹38,128
Closing Date
8 Sept 2025, 2:00 pmClosed
Assistant Exe. Engr(Agri)
O/oAssistant Exe. Engr(Agri) Ernakulam,Kakkanad
Tiling in car parking area and labours vehicle parking area at DAF Neriyamangalam
2025_AGRI_790409_1
AE (3)565/25
Open Tender
Civil Works - Others
Item Rate
240 days
DAF Neriyamangalam
Please refer tender document
9 documents required · 9 mandatory
₹2,760
₹38,128
29 Oct 2025
23 Aug 2025
10 Sept 2025
23 Aug 2025
8 Sept 2025
23 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1302557.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .