Executive Engineer, Und Irrigation Division, Jamnagar
Repairing of Chorbedi-2 checkdam on river Rupavati near village : Chorbedi, Tal. Lalpur, Dist. Jamnagar.
348794
10 of 2026-27
Open
Civil Works
Works
Jamnagar
7 documents required · 7 mandatory
₹900
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹9,000
24 Sept 2026
24 Sept 2026
24 Sept 2026
8 Oct 2026
24 Sept 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : REPAIRING OF CHECKDAM
Repairing of Chorbedi-2 checkdam on river Rupavati near village :
Chorbedi, Tal. Lalpur, Dist. Jamnagar.
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No. and reference to book of specifications) figures
1 Dismantling C.C. foundation or flooring sorting & 52.00 Cum. 828.00
stacking useful and unuseful material in lead upto
200mt. as directed etc. complete.
2(a) Excavation in all sort of strata and formations incl. 38.50 Cum. 79.00
depositing the unuseful excavated stuff as and where
directed incl. sorting and stacking useful materials as
directed upto 200 mt lead and all lift etc. complete
incl. dewatering.
(A) IN OVER BURDEN HARD MURRUM.
2(b) (B) IN SOFT ROCK 38.50 Cum. 176.00
2(c) (C) IN HARD ROCK 33.00 Cum. 590.00
3 Drilling 25mm dia. holes at distant as specified upto 51.00 Rmt. 252.00
3.00 mt. depth in checkdam foundation and fixing
anchor bars of specified diameter with cement grout
including cleaning holes as directed etc. (Excluding
4 Prov. & Laying in position cement concrete using 135.00 Cum. 3465.00
cement , sand and crushed metal coarse aggregate by
mass and machine mix for PCC/RCC including
necessary formworks compaction by vibrator, curing
as directed with all lead & lift etc
complete.(Excluding cost of steel) FOR .BODY WALL,
APRON, TRAINING WALL, SIDE WALL, SPLAY WALL,
KEY WALL, CUT OF WALL ETC.
4/E) “NOMINAL MIX” Concrete Grade 1:2:4 and MSA-
5 Providing, cutting, bending, binding and fixing in 2.80 M.T. 76574.00
position as per drawing TMT BAR, reinforcement for
R.C.C. works and anchor bars incl. cost of black
annealed 16 to 18 BWG M.S.. Wire etc. complete with
all lead and lift. (B) Fe-500
6 Transporting including rehandling and spreading of 26.00 Cum. 84.00
the useful excavated materials of C.O.T. Spillway
foundation, Approach channel, Tail Channel, HR,
inspection road, approach road, etc. for embankment
raising including spreading in uniform layers of
specified thickness, dressing, breaking clods & rolling
at requisite moisture content to required dry density
with suitable type of roller and watering at OMC for
lead upto 1.0 km and all lift etc. complete.
7 Providing and laying STONE 15 LAUNCHING APRON 105.00 Cum. 765.00
by using 50% stone which having weighing not less
than 40 Kg or as specified incl. hand packing and
filling the interstices by spouls etc. complete with all
8 Providing and laying dry rubble pitching with 20 cms 18.00 Sqmt. 526.00
gravel / metal and 20 cms and layers as base of
inverted graded filter and without header stone but
incl. hand packing trimming & dressing of slopes etc.
complete. (A) 30 Cms thick stone pitching.
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 8,59,354=70 Estimated Amount Rs. 8,59,354=70
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Signature of Contractor Deputy Executive Engineer
Irrigation Project Sub Division No.6/1
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
4.pdf
BOQ.pdf
Tender Notice No.10.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .