| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.8 LAccepted-AOC | L1 | Accepted-AOC L1 PARTY | |
| 2 | L2₹28.5 L+₹70,600 (2.54%)Rejected-AOC | L2 | Rejected-AOC L2 PARTY | |
| 3 | L3₹31.0 L+₹3.2 L (11.4%)Rejected-AOC | L3 | Rejected-AOC L3 PARTY |
Tender Value
₹27.9 L
EMD Value
₹50,000
Closing Date
15 Dec 2023, 3:00 pmClosed
HOU(TP/TSP)
KMML,CHAVARA
Demolishing AC/FRP sheets, Fixing AC/FRP /Polymer/Metallic sheets, Repalcing bolts, Fixing AC/FRP ridges,Barge, boards,louvers,valley gutters, Plastering sides of sheet , Applying Tar felt, Cleaning the deposits over valley gutters,sheets
2023_KMML_626122_1
EAF/CIV/0313/2023-2024,Dtd 09/11/2023
Open Tender
Civil Works - Others
Item Rate
365 days
KMML, CHAVARA
Refer Tender Documents
6 documents required · 6 mandatory
₹2,950
₹50,000
11 Mar 2024
1 Dec 2023
16 Dec 2023
1 Dec 2023
15 Dec 2023
1 Dec 2023
Amount
Demolishing AC/FRP/Metallic/Polymer Sheets from all heights
Demolish AC/FRP/PVC sheet in roofing/cladding/walling/louvers partly or completely including removal of debris away from the site to scrap yard , all type polycoated bolts,nuts and washer, labour charges,scaffolding charges,tools, tackles etc complete at all heights and upto a lead of 500m]
Dismantling AC/FRP/Metallic/Polymer Sheet . Up to 10 m level
Dismantling existing AC / FRP sheet/PVC sheet carefully in roofing including ridges, hips, valleys and gutters etc.,including all type polycoated bolts,nuts and washer etc; and lowering and stacking reusable material within 500 metres lead including tools tackles, labours, scaffolding etc all.Up to 10m level.
Dismantling AC/FRP/Metallic/Polymer Sheet from 10m to 20 m level
Dismantling existing AC / FRP sheet/PVC sheet carefully in roofing including ridges, hips, valleys and gutters etc.,including all type polycoated bolts,nuts and washer etc; and lowering and stacking reusable material within 500 metres lead including tools tackles, labours, scaffolding etc all. from 10mtr to 20mtr level
Dismantling AC/FRP/Metallic/Polymer Sheet from 20 m to 30 m from GL level
Dismantling existing AC / FRP sheet/PVC sheet carefully in roofing including ridges, hips, valleys and gutters etc.,including all type polycoated bolts,nuts and washer etc; and lowering and stacking reusable material within 500 metres lead including tools tackles, labours, scaffolding etc all. from 20mtr to 30mtr level
Dismantling AC/FRP/Metallic/Polymer Sheet from 30m to 40 m level
Dismantling existing AC / FRP sheet/PVC sheet carefully in roofing including ridges, hips, valleys and gutters etc.,including all type polycoated bolts,nuts and washer etc; and lowering and stacking reusable material within 500 metres lead including tools tackles, labours, scaffolding etc all. from 30mtr to 40mtr level
Dismantling AC/FRP Sheet walling for level up to 10m from GL
Dismantling existing AC/FRP sheet walling carefully including removal of all type polycoated bolts,nuts and washer etc; all labour charges,scaffolding charges etc; clearing the debris away from the site to scrap yard and lowering and stacking reusable material within 500 metres lead complete.For level upto 10m from GL, including tools tackles, labours, scaffolding etc all.
Dismantling AC/FRP Sheet walling for level from 10m to 20m from GL
Dismantling existing AC/FRP sheet walling carefully including removal of all type polycoated bolts,nuts and washer etc; all labour charges,scaffolding charges etc; clearing the debris away from the site to scrap yard and lowering and stacking reusable material within 500 metres lead complete.For level from 10 m upto 20 m from GL, including tools tackles, labours, scaffolding etc all.
Dismantling AC/FRP Sheet walling for level from 20m to 30m from GL
Dismantling existing AC/FRP sheet walling carefully including removal of all type polycoated bolts,nuts and washer etc; all labour charges,scaffolding charges etc; clearing the debris away from the site to scrap yard and lowering and stacking reusable material within 500 metres lead complete.For level from 20 to 30 from GL, including tools tackles, labours, scaffolding etc all.
Dismantling AC/FRP Sheet walling for level from 30m to 40m from GL
Dismantling existing AC/FRP sheet walling carefully including removal of all type polycoated bolts,nuts and washer etc; all labour charges,scaffolding charges etc; clearing the debris away from the site to scrap yard and lowering and stacking reusable material within 500 metres lead complete.For level from 30 m upto 40m from GL, including tools tackles, labours, scaffolding etc all.
Dismantling existing AC/FRP/PVC Valley gutters/Ridges/barge boards/louvers for level upto 10 m from GL
Dismantling existing AC/FRP/PVC Valley gutters/Ridges/barge boards/louvers and stacking the material within 500 mlead.For level upto 10 m from GL including tools, tackles, labours, scaffolding etc all.
Dismantling existing AC/FRP/PVC Valley gutters/Ridges/barge boards/louvers for level from 10m to 20m from GL
Dismantling existing AC/FRP/PVC Valley gutters/Ridges/barge boards/louvers and stacking the material within 500 mlead.For level from 10m upto 20m from GL including tools, tackles, labours, scaffolding etc all.
Dismantling existing AC/FRP/PVC Valley gutters/Ridges/barge boards/louvers for level from 20m to 30m from GL
Dismantling existing AC/FRP/PVC Valley gutters/Ridges/barge boards/louvers and stacking the material within 500 mlead.For level from 20m upto 30m from GL including tools, tackles, labours, scaffolding etc all.
Dismantling existing AC/FRP/PVC Valley gutters/Ridges/barge boards/louvers for level from 30m up to 40m from GL
Dismantling existing AC/FRP/PVC Valley gutters /Ridges/barge boards/louvers and stacking the material within 500 mlead.For level from 30m upto 40m from GL including tools, tackles, labours, scaffolding etc all.
Dismantling old plaster or skirting raking out joints and cleaning the surface for level upto 10m from GL
Dismantling old plaster or skirting raking out joints and cleaning the surface for re plaster including disposal of rubbish to the dumping ground within 500 metres lead including tools tackles, labours, scaffolding etc all. For level upto 10m from GL.
Dismantling old plaster or skirting raking out joints and cleaning the surface for level from 10m upto 20m from GL
Dismantling old plaster or skirting raking out joints and cleaning the surface for re plaster including disposal of rubbish to the dumping ground within 500 metres lead including tools tackles, labours, scaffolding etc all..For level from 10m upto 20m from GL
Dismantling old plaster or skirting raking out joints and cleaning the surface for level from 20m upto 30m from GL
Dismantling old plaster or skirting raking out joints and cleaning the surface for re plaster including disposal of rubbish to the dumping ground within 500 metres lead including tools tackles, labours, scaffolding etc all..For level from 20m upto 30m from GL
Dismantling old plaster or skirting raking out joints and cleaning the surface for level from 30m upto 40m from GL
Dismantling old plaster or skirting raking out joints and cleaning the surface for re plaster including disposal of rubbish to the dumping ground within 500 metres lead including tools tackles, labours, scaffolding etc all..For level from 30m upto 40m from GL
Dismantling and removing existing damaged tar felt over roofing area for level up to 10m from GL.
Dismantling and removing existing damaged tar felt over the roofing area and cleaning the surface neatly and dispode the waste within 500 metres lead and supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports as per the specifications directed by the company representatives and ensure leak proof including cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete.For level upto 10m from GL.
Dismantling and removing existing damaged tar felt over roofing area for level from 10m up to 20m from GL
Dismantling and removing existing damaged tar felt over the roofing area and cleaning the surface neatly and dispode the waste within 500 metres lead and supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports as per the specifications directed by the company representatives and ensure leak proof including cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete.For level From 10m to 20mtr
Dismantling and removing existing damaged tar felt over roofing area for level from 20m up to 30m from GL
Dismantling and removing existing damaged tar felt over the roofing area and cleaning the surface neatly and dispode the waste within 500 metres lead and supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports as per the specifications directed by the company representatives and ensure leak proof including cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete.For level From 20m to 30mtr
Dismantling and removing existing damaged tar felt over roofing area for level from 30m up to 40m from GL
Dismantling and removing existing damaged tar felt over the roofing area and cleaning the surface neatly and dispode the waste within 500 metres lead and supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports as per the specifications directed by the company representatives and ensure leak proof including cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete.For level From 30m to 40mtr
Fixing asbestos corrugated sheets (New/Old) up to 10m from GL
Fixing asbestos corrugated sheets (New/Old) upto any pitch in horizontal /vertical / curved surfaces with polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers etc. complete (excluding the cost of purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company) including shifting, lifting, cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.For level upto 10m from GL.
Fixing asbestos corrugated sheets (New/Old) from level 10m up to 20m
Fixing asbestos corrugated sheets (New/Old) upto any pitch in horizontal /vertical / curved surfaces with polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers etc. complete (excluding the cost of purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company) including shifting, lifting, cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.For level from 10m to 20mtr
Fixing asbestos corrugated sheets (New/Old) from level 20m up to 30m
Fixing asbestos corrugated sheets (New/Old) upto any pitch in horizontal /vertical / curved surfaces with polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers etc. complete (excluding the cost of purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company) including shifting, lifting, cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.For level from 20m to 30mtr
Fixing asbestos corrugated sheets (New/Old) from level 30m up to 40m
Fixing asbestos corrugated sheets (New/Old) upto any pitch in horizontal /vertical / curved surfaces with polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers etc. complete (excluding the cost of purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company) including shifting, lifting, cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.For level from 30m to 40mtr
Fixing FRP/poly carbonate/PVC /metallic sheets up to 10m from GL
Fixing FRP/poly carbonate/PVC /metallic sheets upto any pitch in horizontal /vertical / curved surfaces and fixing with polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers or sheets shall be fixed using self drilling / self tappingscrew of size (5.5X55mm) with EPDM seal complete , but excluding the cost of purlins, rafters, trusses, and including cutting to size and shapes where ever required. etc. complete (excluding cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company), including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.For level upto 10m from GL.
Fixing FRP/poly carbonate/PVC /metallic sheets from level 10m to 20m
Fixing FRP/poly carbonate/PVC/metallic sheets upto any pitch in horizontal /vertical / curved surfaces and fixing with polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers or sheets shall be fixed using self drilling / self tappingscrew of size (5.5X55mm) with EPDM seal complete , but excluding the cost of purlins, rafters, trusses, and including cutting to size and shapes where ever required. etc. complete (excluding cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company), including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.For level from 10mtr to 20mtr.
Fixing FRP/poly carbonate/PVC /metallic sheets from level 20m to 30m
Fixing FRP/poly carbonate/PVC /metallic sheets upto any pitch in horizontal /vertical / curved surfaces and fixing with polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers or sheets shall be fixed using self drilling / self tappingscrew of size (5.5X55mm) with EPDM seal complete , but excluding the cost of purlins, rafters, trusses, and including cutting to size and shapes where ever required. etc. complete (excluding cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company), including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.For level from 20mtr to 30mtr.
Fixing FRP/poly carbonate/PVC /metallic sheets for level from 30 m upto 40m
Fixing FRP/poly carbonate/PVC /metallic sheets upto any pitch in horizontal /vertical / curved surfaces and fixing with polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers or sheets shall be fixed using self drilling / self tappingscrew of size (5.5X55mm) with EPDM seal complete , but excluding the cost of purlins, rafters, trusses, and including cutting to size and shapes where ever required. etc. complete (excluding cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company), including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.For level from 30mtr to 40mtr.
Fixing AC/FRP/PVC/metallic ridges for level up to 10m from GL
Fixing AC/FRP/PVC/metallic ridges and hips AC/FRP/PVC/metallic valleys and barges fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers including shifting,lifting,tools tackles, labours, scaffolding etc in roofing with suitable fixing accessories or self drilling fastener and EPDM washer etc.(excluding the cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company)Corrugated serrated adjustable ridges including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.Level upto 10 m.
Fixing AC/FRP/PVC/metallic ridges for level from 10m to 20m
Fixing AC/FRP/PVC/metallic ridges and hips AC/FRP/PVC/metallic valleys and barges fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers including shifting,lifting,tools tackles, labours, scaffolding etc in roofing with suitable fixing accessories or self drilling fastener and EPDM washer etc.(excluding the cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company)Corrugated serrated adjustable ridges, including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.For level from 10mtr to 20mtr
Fixing AC/FRP/PVC/metallic ridges for level from 20m to 30m
Fixing AC/FRP/PVC/metallic ridges and hips AC/FRP/PVC/metallic valleys and barges fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers including shifting,lifting,tools tackles, labours, scaffolding etc in roofing with suitable fixing accessories or self drilling fastener and EPDM washer etc.(excluding the cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company)Corrugated serrated adjustable ridges, including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.For level from 20mtr to 30mtr
Fixing AC/FRP/PVC/metallic ridges for level from 30m up to 40m
Fixing AC/FRP/PVC/metallic ridges and hips AC/FRP/PVC/metallic valleys and barges fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers including shifting,lifting,tools tackles, labours, scaffolding etc in roofing with suitable fixing accessories or self drilling fastener and EPDM washer etc.(excluding the cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company)Corrugated serrated adjustable ridges, including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.For level from 30mtr to 40mtr
Replacing the damaged L/J bolts , polycoated bolts of AC / FRP sheet roofing from level up to 10m from GL
Replacing the damaged L/J bolts , polycoated bolts of AC / FRP sheet roofing, side cladding ridges, barge board with new special type polycoated bolts, nuts,washers ctc. After rearranging the required overlap as per the instruction of the company representatives and collecting reusable poly coated bolts including all labour charges, scaffolding charges etc.complete (excluding cost of special type poly coated bolts, nuts washers etc.)including tools tackles, labours, scaffolding etc all. For level upto 10m from GL.
Replacing the damaged L/J bolts , polycoated bolts of AC / FRP sheet roofing for level from 10m up to 20m
Replacing the damaged L/J bolts , polycoated bolts of AC / FRP sheet roofing, side cladding ridges, barge board with new special type polycoated bolts, nuts,washers ctc. After rearranging the required overlap as per the instruction of the company representatives and collecting reusable poly coated bolts including all labour charges, scaffolding charges etc.complete (excluding cost of special type poly coated bolts, nuts washers etc.)including tools tackles, labours, scaffolding etc all. For level from 10mtr 20mtr.
Replacing the damaged L/J bolts , polycoated bolts of AC / FRP sheet roofing for level from 20m up to 30m
Replacing the damaged L/J bolts , polycoated bolts of AC / FRP sheet roofing, side cladding ridges, barge board with new special type polycoated bolts, nuts,washers ctc. After rearranging the required overlap as per the instruction of the company representatives and collecting reusable poly coated bolts including all labour charges, scaffolding charges etc.complete (excluding cost of special type poly coated bolts, nuts washers etc.)including tools tackles, labours, scaffolding etc all. For level from 20mtr 30mtr.
Replacing the damaged L/J bolts , polycoated bolts of AC / FRP sheet roofing for level from 30m up to 40m
Replacing the damaged L/J bolts , polycoated bolts of AC / FRP sheet roofing, side cladding ridges, barge board with new special type polycoated bolts, nuts,washers ctc. After rearranging the required overlap as per the instruction of the company representatives and collecting reusable poly coated bolts including all labour charges, scaffolding charges etc.complete (excluding cost of special type poly coated bolts, nuts washers etc.)including tools tackles, labours, scaffolding etc all. For level from 30mtr 40mtr.
Plastering the sides of sorrounding structural column support or edge between AC sheet with masonry wall from level up to 10m from GL
Plastering the sides of sorrounding structural column support or edge between AC sheet with masonry wall with 12 mm cement plaster of mix. 1:3 (1 cement : 3 fine sand). including tools tackles, labours, scaffolding etc all.For level upto 10m from GL(Cement shall be supplied by the company)
Plastering the sides of sorrounding structural column support or edge between AC sheet with masonry wall for level from 10m to 20m
Plastering the sides of orrounding structural column support or edge between AC sheet with masonry wall with 12 mm cement plaster of mix. 1:3 (1 cement : 3 fine sand). including tools tackles, labours, scaffolding etc all.For level from 10m to 20mtr(Cement shall be supplied by the company)
Plastering the sides of sorrounding structural column support or edge between AC sheet with masonry wall for level from 20m to 30m
Plastering the sides of sorrounding structural column support or edge between AC sheet with masonry wall with 12 mm cement plaster of mix. 1:3 (1 cement : 3 fine sand). including tools tackles, labours, scaffolding etc all.For level from 20m to 30mtr(Cement shall be supplied by the company)
Plastering the sides of sorrounding structural column support or edge between AC sheet with masonry wall for level from 30m to 40m
Plastering the sides of sorrounding structural column support or edge between AC sheet with masonry wall with 12 mm cement plaster of mix. 1:3 (1 cement : 3 fine sand). including tools tackles, labours, scaffolding etc all.For level from 30m to 40mtr(Cement shall be supplied by the company)
Clearing away disposal over roofs at different levels including disposal of debris for level upto 10m from GL
Clearing away disposal over roofs at different levels including disposal of debris within 500m including tools tackles, labours, scaffolding etc all.For level upto 10m from GL
Clearing away disposal over roofs at different levels including disposal of debris for level from 10m up to 20m
Clearing away disposal over roofs at different levels including disposal of debris within 500m including tools tackles, labours, scaffolding etc all.For level upto 20m from 10m level
Clearing away disposal over roofs at different levels including disposal of debris for level from 20m up to 30m
Clearing away disposal over roofs at different levels including disposal of debris within 500m including tools tackles, labours, scaffolding etc all.For level upto 30m from 20m level
Clearing away disposal over roofs at different levels including disposal of debris for level from 30m up to 40m
Clearing away disposal over roofs at different levels including disposal of debris within 500m including tools tackles, labours, scaffolding etc all.For level upto 40m from 30m level
Fixing AC/FRP louvers for level up to 10m from GL
Fixing AC/FRP louvers fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete. 1.60 mm thick with zinc coating not less than 350 gm/ m2, including shifting,lifting, tools tackles, labours, scaffolding etc all.(excluding the cost of sheet, purlins, rafters and trusses,the required sheet and fixtures shall be supplied by the company)For level upto 10m from GL.
Fixing AC/FRP louvers for level from 10m upto 20m
Fixing AC/FRP louvers fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete. 1.60 mm thick with zinc coating not less than 350 gm/ m2, including shifting,lifting, tools tackles, labours, scaffolding etc all.(excluding the cost of sheet, purlins, rafters and trusses,the required sheet and fixtures shall be supplied by the company)For level from 10mtr to 20mtr
Fixing AC/FRP louvers for level from 20m upto 30m
Fixing AC/FRP louvers fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete. 1.60 mm thick with zinc coating not less than 350 gm/ m2, including shifting,lifting, tools tackles, labours, scaffolding etc all.(excluding the cost of sheet, purlins, rafters and trusses,the required sheet and fixtures shall be supplied by the company)For level from 20mtr to 30mtr
Fixing AC/FRP louvers for level from 30m upto 40m
Fixing AC/FRP louvers fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete. 1.60 mm thick with zinc coating not less than 350 gm/ m2, including shifting,lifting, tools tackles, labours, scaffolding etc all.(excluding the cost of sheet, purlins, rafters and trusses,the required sheet and fixtures shall be supplied by the company)For level from 30mtr to 40mtr
Clearing disposal over valley gutter for level upto 10m from GL
Clearing away the deposit over the valley gutters at all levels including disposal of debris within 500m. Level upto 10 m
Clearing disposal over valley gutter for level from 10m up to 20m
Clearing away the deposit over the valley gutters at all levels including disposal of debris within 500m. Level upto 20 m from 10 mtr
Clearing disposal over valley gutter for level from 20m up to 30m
Clearing away the deposit over the valley gutters at all levels including disposal of debris within 500m. Level upto 30 m from 20 mtr
Clearing disposal over valley gutter for level from 30m up to 40m
Clearing away the deposit over the valley gutters at all levels including disposal of debris within 500m. Level upto 40 m from 30 mtr
Extra for circular cut in AC sheet
Extra for circular cutting in AC/FRP corrugated sheet roofing for making openings for any height for making openings of area exceeding 40 square decimeter.
Supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports for level upto 10m from GL
Supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports after surface preparation as per the specifications directed by the company representatives and ensure leak proof including cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete.For level upto 10m from GL.
Supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports for level from 10m upto 20m
Supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports after surface preparation as per the specifications directed by the company representatives and ensure leak proof including cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete.For level from 10mtr to 20mtr
Supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports for level from 20m upto 30m
Supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports after surface preparation as per the specifications directed by the company representatives and ensure leak proof including cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete.For level from 20mtr to 30mtr
Supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports for level from 30m upto 40m
Supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports after surface preparation as per the specifications directed by the company representatives and ensure leak proof including cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete.For level from 30mtr to 40mtr
UTHAMAN K
U. AZEEZKUNJU
Bidder Name
SNEHALATHA D
U. AZEEZKUNJU
UTHAMAN K
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .