Executive Engineer, RWS & S Division,Guntur
Guntur
Augmentation of PWS Schemes in Burripalem Village of Tenali Mandal, Est. Cost Rs. 8.50 Lakhs
960314
08 ZPGF 15th Finance Tide (DW) 2026-27 EE RWS S Guntur
OPEN - NCB
Water Supply
GUNTUR
8 documents required · 8 mandatory
₹222
₹6,300
13 Jul 2026
13 Jul 2026
13 Jul 2026
Removal of peeled concrete surface including paint rust proof compound to old steel including all labour charges etc. complete, for OHSR Columns & Braces (rate incl. overheads & contractor's profit @13.615%)
Removal of peeled concrete surface including paint rust proof compound to old steel including all labour charges etc. complete, for OHSR Bottom Dome Slab inside (rate incl. overheads & contractor's profit @13.615%)
Cost of chemicals and labour charges for rust proof, bonding of steel with concrete, for OHSR Bottom Dome Slab inside (rate incl. overheads & contractor's profit @13.615%)
VRCC (1: 1/2:3) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc. but excluding cost of steel and its fabrication charges etc complete, (rate incl. overheads & contractor's profit @13.615%)
VRCC (1: 1/2:3) using 20mm HBG chips, cost & conveyance of materials & labour excl. steel and fabrication charges, for Column - 1st Brace to 2nd Brace, (rate incl. overheads & contractor's profit @13.615%)
VRCC (1: 1/2:3) using 20mm HBG chips, cost & conveyance of materials & labour excl. steel and fabrication charges, for Column - 2nd Brace to 3rd Brace, (rate incl. overheads & contractor's profit @13.615%)
VRCC (1: 1/2:3) using 20mm HBG chips, cost & conveyance of materials & labour excl. steel and fabrication charges, for Column - 3rd Brace to Bottom Slab, (rate incl. overheads & contractor's profit @13.615%)
VRCC (1: 1/2:3) using 20mm HBG chips, cost & conveyance of materials & labour excl. steel and fabrication charges, for GL Brace (Ring Beam level), (rate incl. overheads & contractor's profit @13.615%)
VRCC (1:1/2:3) using 20mm HBG chips, cost & conveyance of materials & labour excl. steel and fabrication charges, for 2nd Brace, (rate incl. overheads & contractor's profit @13.615%)
VRCC (1:1/2:3) using 20mm HBG chips, cost & conveyance of materials & labour excl. steel and fabrication charges, for 3rd Brace, (rate incl. overheads & contractor's profit @13.615%)
VRCC (1:1/2:3) using 20mm HBG chips, cost & conveyance of materials & labour excl. steel and fabrication charges, for Ring Girder Beam, (rate incl. overheads & contractor's profit @13.615%)
VRCC (1:1/2:3) using 20mm HBG chips, cost & conveyance of materials & labour excl. steel and fabrication charges, for Top Dome Slab, (rate incl. overheads & contractor's profit @13.615%)
Providing High Yield Deformed (HYSD) /Thermo Mechanically Treated (TMT) /Mild Steel (MS) steel bars(Fe 500 grade as per ISI 1786-1979 )of difference diameters for RCC works,including labour charges for straightening, cutting, bending to required sizes and sapers, placing in position with cover bolcks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars, including cost and conveyance of binding wire, cover blocks and all incidental ,operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all mterials etc,.completd for finished item of work in all floors ( APSS No 126 ) etc complete including over heads and contractors profit @ 13.615%. FE-500
Supply & delivery of 25mm dia Steel pipes for top railings and posts, (rate incl. overheads & contractor's profit @13.615%)
Supply & delivery of 25mm dia MS pipes for railings for existing staircase, (rate incl. overheads & contractor's profit @13.615%)
Painting to walls with 2 coats plastic emulsion paint over primer coat, external walls - Columns, upto 3.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting to walls with 2 coats plastic emulsion paint over primer coat, external walls - Columns, 3.00m to 6.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting to walls with 2 coats plastic emulsion paint over primer coat, external walls - Columns, 6.00m to 9.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting to walls with 2 coats plastic emulsion paint over primer coat, external walls - Columns, 9.00m to 12.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting to walls with 2 coats plastic emulsion paint over primer coat - Bottom Ring Beam & Bottom Slab @12.85m height, (rate incl. overheads & contractor's profit @13.615%)
Painting to walls with 2 coats plastic emulsion paint over primer coat - OHSR Side Walls @16.60m height, (rate incl. overheads & contractor's profit @13.615%)
Painting to walls with 2 coats plastic emulsion paint over primer coat - Top Slab @18.15m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 125mm dia CI Inlet Pipe, upto 3.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 125mm dia CI Inlet Pipe, upto 6.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 125mm dia CI Inlet Pipe, upto 9.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 125mm dia CI Inlet Pipe, upto 12.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 125mm dia CI Inlet Pipe, upto 12.85m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 150mm dia CI Outlet Pipe, upto 3.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 150mm dia CI Outlet Pipe, upto 6.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 150mm dia CI Outlet Pipe, upto 9.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 150mm dia CI Outlet Pipe, upto 12.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 150mm dia CI Outlet Pipe, upto 12.85m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 100mm dia CI Overflow & Scour Pipe, upto 3.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 100mm dia CI Overflow & Scour Pipe, upto 6.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 100mm dia CI Overflow & Scour Pipe, upto 9.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 100mm dia CI Overflow & Scour Pipe, upto 12.00m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with synthetic enamel paint 2 coats over primer (3 coats) for MS/GI material - 100mm dia CI Overflow & Scour Pipe, upto 12.85m height, (rate incl. overheads & contractor's profit @13.615%)
Painting with epoxy paint 3 coats, best quality - OHSR Inside Side Walls, (rate incl. overheads & contractor's profit @13.615%)
Painting with epoxy paint 3 coats, best quality - OHSR Inside Bottom Dome Slab, (rate incl. overheads & contractor's profit @13.615%)
Painting with epoxy paint 3 coats, best quality - OHSR Inside Top Dome Slab, (rate incl. overheads & contractor's profit @13.615%)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Burriplaem Schedule-8.50Lakhs.xlsx
TENDER_DOCUMENT • 0.02 MB
NIT Vol - I-Burripalem-8.50L.doc
TENDER_DOCUMENT • 0.17 MB
NITVol -II-Burripalem.doc
TENDER_DOCUMENT • 0.14 MB
Tenali Declaration.pdf
TENDER_DOCUMENT • 1.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].