Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC AT UPPER KULHI JHARIA P O JHARIA DIST DHANBAD | DHANBAD | DHANBAD | JHARKHAND | L1 | Accepted-AOC Awarded | |
| 2 | L2₹1.7 L+₹6,425 (3.92%)Rejected-Finance AT PHUSBUNGLOW PO BHAGA DIST DHANBAD 828301 | DHANBAD | DHANBAD | JHARKHAND | 828301 | L2 | Rejected-Finance due to higher rate quoted | |
| 3 | L3₹1.7 L+₹8,754 (5.34%)Rejected-Finance NICHE KULHI SINDRI ROAD JHARIA DHANBAD DHANBAD 828111 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | L3 | Rejected-Finance due to higher rate quoted |
Tender Value
₹1.6 L
EMD Value
₹1,962
Closing Date
14 Dec 2022, 10:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
INCHARGE AAW,KA
office of The GM, Kusunda Area
Repair work of Tata Hyva Reg. No-JH10AE-0308 of Area Auto Workshop, Kusunda Area
2022_BCCL_264161_1
BCCL/KA-VI/TRPT/E-NIT/22-23/27
Open Tender
Miscellaneous Works
Item Rate
20 days
AAW, Kusunda Area
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,962
Yes
17 Dec 2022
5 Dec 2022
15 Dec 2022
5 Dec 2022
14 Dec 2022
5 Dec 2022
Amount
Repair work of Tata Hyva.
Jobs to be done: 1. Complete clutch Assy. removing, dismantling and refitting after repairing. 2. Clutch Pressure plate body refacing. 3. Clutch booster complete overhauling and fitting. 4. Complete Gear box dismantling and fitting after new fly Wheel assy. changing. 5. Self-starter O/H and repairing with armature rewinding. 6. Rear suspension support complete O/H and changing their damage parts. 7. Complete FIP & Nozzle calibration, O/H & fitting. 8. Rear and front spring leaf spring recambering and all damage Pin, bush, Hanger etc. changing. 9. Steering pump removing, changing and fitting. 10. Complete hydraulic tipping valve assy. dismantling, dismounting and refitting after repairing. 11. Hydraulic tipping valve body complete refacing. 12. Complete Silencer assy. removing, cutting, changing, welding and fitting. 13. Tie rod and push rod Assy. complete removing, changing and fitting. Note:-During re-cambering of spring leaf broken spring will be provided departmentally if required. Repairing work should be completed with all required materials and manpower.
Total impact of GST for the purpose of CTC
Naz Automobile and Tyre Repairing Works
MARSHAL GAIS WELDING
stage.html
html • 0.04 MB
techsummary_273231.pdf
PDF • 0.09 MB
finsummary_273231.pdf
PDF • 0.09 MB
AOC-27.pdf
PDF • 0.35 MB
finance_273231.pdf
PDF • 0.09 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .