Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.0 CrAccepted-AOC | ₹27.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹35.0 CrRejected-AOC | ₹35.0 Cr | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
Tender Value
₹28.0 Cr
EMD Value
₹5 L
Closing Date
8 Sept 2020, 5:30 pmClosed
CEO SCTL
4th floor, Felicity Square Statue
for Selection of Contractor for Design, Supply, Installation and Maintenance of Electro- Mechanical Car Parking System at A Block
2020_SCTLT_347585_3
SCTL-PRJ/208/2019-MUP/02
Open Tender
Miscellaneous Works
450 days
Trivandrum
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,850
Yes
Online
₹5 L
Yes
5 Nov 2020
18 Aug 2020
10 Sept 2020
18 Aug 2020
8 Sept 2020
18 Aug 2020
18 Aug 2020 - 25 Aug 2020
Amount
Design, Supply, installation, erection, testing & commissioning & of G+6 / (Multi-level) Multi Grid over-ground Parking System with Electro Mechanical technology to accommodate for a total number of 568 (minimum) cars with suitable steel structure frame work, Independent motorized pallet having up/down movement with electro-mechanical technology which can take the load of 2000 kg. Capacity complete with PLC and electrical installation etc.as per specification and direction of Engineer In Charge. The system shall be designed to accommodate cars of size 5200 mm length and 2250 mm width and height 2100mm (SUV) in ground floor, cars of 5000 mm length 2250 width and 1500 mm height in Upper floors , with average retrieval/parking time not more than 300 seconds.Including parking management system and accessories (Boom barrier and CCTV surveillance cameras), Including Foundation with Basement ,Retaining wall and all Civil & PHE and Electrical works etc complete as per technical specification, scope of work mentioned in RFP and directions of Engineer in charge.
Comprehensive AMC which includes cost for spares and consumables for 2nd Year after one year of warranty period.
Comprehensive AMC which includes cost for spares and consumables charges for 3rd Year .
Comprehensive AMC which includes cost for spares and consumables charges for 4th Year .
Comprehensive AMC which includes cost for spares and consumables charges for 5th Year .
Sotefin Parking Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid