| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-AOC | ₹14.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.4 LRejected-Finance | ₹15.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹15.5 LRejected-Finance | ₹15.5 L | L3 | Rejected-Finance L3 |
| 4 | L4₹15.7 LRejected-Finance KERALA KL | ₹15.7 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | NERIAHTECHNOLOGIES AND SYSTEMS L1 | SUNIL KUMAR F CONTRACTOR L2 | R SURESH KANCHANAM BUILDERS L3 | SAJAN DANIEL L4 |
|---|---|---|---|---|---|---|---|
| 1.00Smart Anganwadi | |||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 370.02 | sqm | 5 ₹1,850.13 | 17.24 ₹6,379.23 | 17 ₹6,290.43 | 18 ₹6,660.45 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 24.6 | cum | 200 ₹4,919.80 | 341.01 ₹8,388.50 | 341 ₹8,388.26 | 320 ₹7,871.68 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.32 | cum | 7,500 ₹54,862.50 | 7,520.38 ₹55,011.58 | 7,536 ₹55,125.84 | 7,700 ₹56,325.50 |
| 1.00 | OD229609/2025-2026:60.7.1. DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 16.22 | cum | 3,800 ₹61,628.40 | 3,785.8 ₹61,398.10 | 3,794 ₹61,531.09 | 3,900 ₹63,250.20 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 6.39 | cum | 7,490 ₹47,831.14 | 7,909.63 ₹50,510.90 | 7,927 ₹50,621.82 | 8,000 ₹51,088 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 16.3 | sqm | 650 ₹10,595 | 723.21 ₹11,788.32 | 725 ₹11,817.50 | 730 ₹11,899 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 15.86 | sqm | 380 ₹6,027.94 | 366.08 ₹5,807.13 | 367 ₹5,821.72 | 380 ₹6,027.94 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.5 | cum | 10,000 ₹35,040 | 9,943.35 ₹34,841.50 | 10,000 ₹35,040 | 10,000 ₹35,040 |
| 1.01 | 50.6.1.8:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete | 19.78 | cum | 7,390 ₹1.5 L | 7,291.49 ₹1.4 L | 7,380 ₹1.5 L | 7,600 ₹1.5 L |
Tender Value
Refer Docs
EMD Value
₹40,632
Closing Date
3 Nov 2025, 6:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER LIDEW KOTTARAKKARA MUNCIPALITY
GENERAL WORK-ANNUAL PLAN PRO.154/2025-26 KOTTARAKKARA MUNCIPALITY CONSTRUCTION OF ANGANVADI IN TOWN WARD
2025_LSGD_815500_2
06/AE/LIDEW/KTRMC/2025-26
Open Tender
Civil Works - Buildings
180 days
KOTTARAKKARA
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹40,632
Yes
6 Mar 2026
27 Oct 2025
4 Nov 2025
27 Oct 2025
3 Nov 2025
27 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1365287.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
PRE.pdf
Tender Documents • 0.25 MB
FRT.pdf
Tender Documents • 0.25 MB
AFF.pdf
Tender Documents • 0.23 MB
NIT.pdf
Tender Documents • 0.03 MB
SBD.pdf
Tender Documents • 1.89 MB
BOQ_1365287.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid