| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹78.9 L+₹9.6 L (13.8%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L4 | |
| 4 | Rejected-Technical 25 P NO 310 | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | JINCE P JAMES L4 | adilmohammed L1 | SHAJI.P L3 | Abdul Khalam L2 |
|---|---|---|---|---|---|---|---|
| 1.00BUILDING PROPER | |||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 104.57 | cum | 375.55 ₹39,272.01 | 305.76 ₹31,973.93 Lowest | 380 ₹39,737.36 | 359.72 ₹37,616.64 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 4.8 | cum | 136.78 ₹656.54 | 111.37 ₹534.58 Lowest | 130 ₹624 | 131.02 ₹628.9 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 70 | hour | 360.74 ₹25,251.8 | 293.71 ₹20,559.7 Lowest | 350 ₹24,500 | 345.54 ₹24,187.8 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 27.15 | cum | 8,281.94 ₹2,24,871.23 | 6,742.96 ₹1,83,084.85 Lowest | 8,000 ₹2,17,216 | 7,900 ₹2,14,500.8 |
| 1.00 | OD34891/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately.All work upto plinth level | 40.21 | cum | 10,962 ₹4,40,825.87 | 9,256.13 ₹3,72,226.01 Lowest | 10,000 ₹4,02,140 | 10,800 ₹4,34,311.2 |
| 1.01 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 7.29 | cum | 8,732.61 ₹63,625.8 | 7,109.88 ₹51,802.59 Lowest | 8,500 ₹61,931 | 8,364.57 ₹60,944.26 |
| 1.01 | OD34892/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately.All work above plinth level upto floor V level | 114.07 | cum | 13,050 ₹14,88,626.55 | 10,985.45 ₹12,53,121.27 Lowest | 12,000 ₹13,68,852 | 12,800 ₹14,60,108.8 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 222.12 | sqm | 403.15 ₹89,547.68 | 328.24 ₹72,908.67 Lowest | 390 ₹86,626.8 | 386.16 ₹85,773.86 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 201.6 | sqm | 1,052.93 ₹2,12,270.69 | 857.27 ₹1,72,825.63 Lowest | 1,000 ₹2,01,600 | 950 ₹1,91,520 |
Tender Value
₹81.6 L
EMD Value
₹50,000
Closing Date
18 Oct 2025, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer PWD Buildings Division Kollam
GENERAL Plan fund 2022 23 Construction of School Building for Vengara LPS Karunagappally General Civil Work
2025_PWD_805463_1
PWD/BLDG/TR/11239/2022_5_1
Open Tender
Civil Works - Buildings
Item Rate
Vengara
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
18 Nov 2025
4 Oct 2025
22 Oct 2025
4 Oct 2025
18 Oct 2025
4 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.63 MB
BOQ_1340734.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .