| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAdmitted-Finance | ₹3.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.7 Cr+₹38.88 (<0.01%)Admitted-Finance NUAGAON P S NIALI DIST CUTTACK BHUBANESWAR | CUTTACK | ODISHA | 752120 | ₹3.7 Cr+₹38.88 (<0.01%) | L2 | Admitted-Finance |
| 3 | L3₹4.1 Cr+₹35.3 L (9.47%)Admitted-Finance | ₹4.1 Cr+₹35.3 L (9.47%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | RANJAN KUMAR MOHANTY L2 | ABHIPSHA MOHANTY L3 | SAMRAT SWAIN L1 |
|---|---|---|---|---|---|---|
| 1.00Laying and Jointing HDPE Pipe. Heading | ||||||
| 2.00 | Supplying all materials labour T&P design drawing,soil testing etc .complete in all respect for construction of RCC roof building ,pump house and construction of compoundwall for pump house and laying testing and commissioning of Rising main &Distribution system pipe line such as ,HDPE,,GI pipes etc along with required fittings and specials and construction of rcc valve chamber,public stand post ,individual house hold connection,stand alone,installation of chlorination,installation of submersible pump with moter and wiring of pump house & installation of Servor Stabilizer etc as per supplied drawing in section-7 and detail scope of work&technical specification,quantity of work mention in section -5 and in (AnnexureA to H except G) .All materials required shall be supplied by the contractor as per terms and condition of DTCN &all dimentions are as per supplied drawings and as per direction of Engg-in -charge.All work manner that all house hold of entire village will get required quantity of drinking water with residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system PWS TO BAIGANIGAON | 1 | LS | 41,95,457.11 ₹41,95,457.11 Lowest | 45,92,916.6 ₹45,92,916.6 | 41,95,894.32 ₹41,95,894.32 |
| 3.00 | PWS TO MINJAPADA | 1 | LS | 43,49,487.77 ₹43,49,487.77 Lowest | 47,61,539.5 ₹47,61,539.5 | 43,49,941.03 ₹43,49,941.03 |
| 4.00 | PWS TO ALIJANGA | 1 | LS | 47,12,646.34 ₹47,12,646.34 Lowest | 51,59,102.1 ₹51,59,102.1 | 47,13,137.45 ₹47,13,137.45 |
| 5.00 | PWS TO KULIGAN | 1 | LS | 73,57,356.85 ₹73,57,356.85 Lowest | 80,54,361.1 ₹80,54,361.1 | 73,58,123.56 ₹73,58,123.56 |
| 6.00 | PWS TO KANTI | 1 | LS | 36,54,804.33 ₹36,54,804.33 Lowest | 40,01,044.7 ₹40,01,044.7 | 36,55,185.2 ₹36,55,185.2 |
| 7.00 | Design ,drawing construction erection,testing and commissioning of different capacity RCC elevated storage reservoir( circular type with spherical dome) of 15mtr staging height as per detail scope of work and technical specification mentioned in Section-5 and in Annexure-G including soil testing of SBC etc complete as per direction of Engg-in -charge. PWS TO BAIGANIGAON(50 KL PILE) | 1 | LS | 19,00,002 ₹19,00,002 Lowest | 20,80,000 ₹20,80,000 | 19,00,200 ₹19,00,200 |
| 8.00 | PWS TO MINJAPADA(100 KL PILE) | 1 | LS | 28,50,003 ₹28,50,003 Lowest | 31,20,000 ₹31,20,000 | 28,50,300 ₹28,50,300 |
| 9.00 | PWS TO ALIJANGA(50 KL RAFT ) | 1 | LS | 17,10,001.8 ₹17,10,001.8 Lowest | 18,72,000 ₹18,72,000 | 18,00,000 ₹18,00,000 |
| 10.00 | PWS TO KULIGAN(100 KL PILE) | 1 | LS | 28,50,003 ₹28,50,003 Lowest | 31,20,000 ₹31,20,000 | 28,50,300 ₹28,50,300 |
Tender Value
₹3.9 Cr
Closing Date
11 Oct 2022, 5:30 pmClosed
SE RWSS
O/O THE SUPERITENDING ENGINEER RWSS DIVISION JAGATSINGHPUR PIN 754103
EXECUTION OF 5 NOS INDIVIDUAL NEW RPWS SCHEME TO BAIGANIGAON MINJIPADA ALIJANGA KULIAGAON KANTI UNDER BALIKUDA BLOCK IN THE DISTRICT OF JAGATSINGHPUR
2022_RWSS_81665_1
2022-17-1
National Competitive Bid
Civil Works - Water Works
Lump-sum
365 days
JAGATSINGHPUR
DETAILS AS PER THE DTCN ATTACHED
2 documents required · 2 mandatory
₹10,000
Exempted
11 Nov 2022
22 Sept 2022
12 Oct 2022
22 Sept 2022
11 Oct 2022
22 Sept 2022
22 Sept 2022 - 7 Oct 2022
Amount
Laying and Jointing HDPE Pipe. Heading
Supplying all materials labour T&P design drawing,soil testing etc .complete in all respect for construction of RCC roof building ,pump house and construction of compoundwall for pump house and laying testing and commissioning of Rising main &Distribution system pipe line such as ,HDPE,,GI pipes etc along with required fittings and specials and construction of rcc valve chamber,public stand post ,individual house hold connection,stand alone,installation of chlorination,installation of submersible pump with moter and wiring of pump house & installation of Servor Stabilizer etc as per supplied drawing in section-7 and detail scope of work&technical specification,quantity of work mention in section -5 and in (AnnexureA to H except G) .All materials required shall be supplied by the contractor as per terms and condition of DTCN &all dimentions are as per supplied drawings and as per direction of Engg-in -charge.All work manner that all house hold of entire village will get required quantity of drinking water with residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system PWS TO BAIGANIGAON
PWS TO MINJAPADA
PWS TO ALIJANGA
PWS TO KULIGAN
PWS TO KANTI
Design ,drawing construction erection,testing and commissioning of different capacity RCC elevated storage reservoir( circular type with spherical dome) of 15mtr staging height as per detail scope of work and technical specification mentioned in Section-5 and in Annexure-G including soil testing of SBC etc complete as per direction of Engg-in -charge. PWS TO BAIGANIGAON(50 KL PILE)
PWS TO MINJAPADA(100 KL PILE)
PWS TO ALIJANGA(50 KL RAFT )
PWS TO KULIGAN(100 KL PILE)
PWS TO KANTI(50 KL PILE)
Contractor shall maintain the PWS project for (5) calender years from the completion date of defect liability period i.e one year from the completion of the work in such a manner that the house hold of PWS scheme covered area will get(adequate)required quantity of supply of water taking supply hour as8hour/day without facing any problem.The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complain either from public or from department.The contractor shall maintain all structure of pws schemes as per term and comditions of DTCN &technical specificationmentioned in section-5 PWS TO BAIGANIGAON
PWS TO MINJAPADA
PWS TO ALIJANGA
PWS TO KULIGAN
PWS TO KANTI
RANJAN KUMAR MOHANTY
ABHIPSHA MOHANTY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_411298.xls
BOQ • 0.28 MB
pdf.pdf
Tender Documents • 23.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .