Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance DHOLPUR | RAJASTHAN | 328001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹21.3 L
EMD Value
₹42,600
Closing Date
25 Feb 2020, 6:00 pmClosed
Sr Regional Manager, RIICO ltd Bhiwadi
Sr Regional Manager, RIICO ltd Bhiwadi, RIICO Chowk ,Bhiwadi
As per Tender Documents
2020_RIICO_177362_1
34/2019-2020/5738-5748/(1-3)/1
Open Tender
Civil Works
Item Rate
355 days
Bhiwadi
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
RIICO LTD BHIWADI
₹42,600
29 Feb 2020
14 Feb 2020
28 Feb 2020
14 Feb 2020
25 Feb 2020
14 Feb 2020
Amount
Collection of domestic waste garbage non industrial solid waste generated from allottees of industrial area Bhiwadi Zone A as per enclosed map on daily basis from door to door of allottees by suitable commercial vehicle with hopper arrangment The work shall also include the regular cleaning and upkeeping of ROW of roads of industrial area by way of engaging man power machineries tools and plants excluding the drains but including the jungle clearance and disposal of solid waste lying in ROW of road The waste so collected will be transported and disposal of in proper manner by the agency at its own level and cost to the designated place of local bodies or as per direction of engineer in charge as per enclosed terms and conditions broad terms and conditions A The contractor should visit the site of work and rate should be quoted accordingly B The contractor should arrange required number of shall commercial vehicles with facility of hopper for door to door collection of waste and necessary vehicles required for transportation and disposal of waste to the designated place of local body or as per directions of engineer in charge C No was should be scattered around designated place and the transportation should be done on daily basis in proper manner as per direction of engineer in charge D All the vehicles shall equipped with proper alarm system to let the allottee know of their arrival at the door step regularly between 8 00 AM to 2 00 PM E The contractor has to execute work within the complete right of way of road that is plot boundary to plot boundary and disposal of all types of dead trees autumn leaves jungle dead animals etc. as per direction of engineer in charge F ROW areas to be kept neat and clean G All the requisite labour TandP machineries required for proper execution of work as per complete scope of work shall be arranged by the contractor The labour engaged in the work should be in uniform as prescribed and approved by engineer in charge H Contractor has to make all necessary alternate arrangement during holidays I Contractor shall be responsible for damage of any infrastructure like road drain etc during the execution of work J The contractor has to quote the complete rate on daily basis for complete one job for one day period No tender in which rate quoted in other manner shall be considered K All the complaints related to work shall be recorded by contractor in the complaint register maintained at concerned office of Industrial Association RIICO office L Contractor will display the contact details of himself and his authorized representative at prominent locations of industrial area like RIICO Office Association Building Water Supply Complex Fire Station and other places as directed by engineer incharge M The agency shall also take the Geo Tagged Photographs of the complete ROW at a regular interval of 15 days and submit the same to the Unit Office on the next day of taking the photographs for verification N The agency shall also provide the information to the Unit Office with regard to dumping of the hazardous nonhazardous industrial solid waste construction and demolition material dumped by the industrialists in the ROW along with Geo Tagged photographs showing the location of waste with plot no O The contractor will engage at least two labours apart from driver on each vehicle collecting the waste Further the contractor will engage atleast 4 labours on daily basis for cleaning and upkeeping of the industrial area P In case the vehicle along with labour collecting the door to door waste does not turn up on any day then no payment for that particular day is to be made and in addition the penalty equal to the payment at the rate of twice of the proportionate per day payment shall be levied and deducted from the bill Similarly in case the regular cleaning in the industrial area does not take place then no payment for that particular day is to be made and in addition the penalty equal to the payment at the rate twice of the proportionate per day payment shall be levied and deducted from the bill Q If the contractor agency dose not execute the work continuously for seven days then the penalty is to be imposed as proposed above and in addition the action is to be initiated in accordance with the relevant clauses of the contract R The contractor will be bound to follow all the rules and regulations order of NGT RSPCB EPCA etc as applicable from time to time agreement
M/s Perfect Construction Company
B. K. Contractor
M/S DEV CONSTRUCTION
M/S JAI GURU GORKH NATH JI
M/S R.K. CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .