Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAdmitted-Finance MAIN ROAD RAMGARH CANTT 829122 | RAMGARH | RAMGARH | JHARKHAND | 829122 | L1 | Admitted-Finance | |
| 2 | L2₹5.6 L+₹48,586 (9.46%)Admitted-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical NEAR RELIANCE PETROL PUMP RAMGARH CANTT 829122 DIST RAMGARH JHARKHAND | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | - | Rejected-Technical NOT SUBMITTED RELEVANT ASKED SHORTFALL DOCUMENTS |
| Sl No | Description | Qty | Unit | M.k. Traders L1 | coalfields engineering works L2 |
|---|---|---|---|---|---|
| 2.00 | 12 SWG Dual Coated Copper Wires, Class H+, Temperature Index 200 DEG Centrigrad | 504 | KG | 1,285 ₹6,47,640 Lowest | 1,335 ₹6,72,840 |
| 3.00 | Less Scrap value Sl No-2 @ 60% | 1 | L/S | 3,88,584 ₹-3,88,584 Lowest | 4,03,704 ₹-4,03,704 |
| 4.00 | Insulation cost @15% of Sl.No.-2 | 1 | L/S | 97,146 ₹97,146 Lowest | 1,00,926 ₹1,00,926 |
| 5.00 | Labour cost @ 15% of Sl.No.-2 | 1 | L/S | 70,000 ₹70,000 Lowest | 1,00,926 ₹1,00,926 |
| 6.00 | Profit 10% Sl.No. 2 to 5 | 1 | L/S | 43,100 ₹43,100 Lowest | 47,000 ₹47,000 |
| 7.00 | Supply and installation of 11 KV rated Bushing Stud with insulator for | 1 | nos | 15,000 ₹15,000 | 14,000 ₹14,000 Lowest |
| 8.00 | Filtration of transformer oil for 11/0.4 KV 3 phase 50 cycle oil immersed, naturally cooled, distribution transformer upto desired break down value. | 450 | L | 30 ₹13,500 Lowest | 32 ₹14,400 |
| 9.00 | Dismantalling and installation of transformer | 1 | Job | 16,000 ₹16,000 Lowest | 16,000 ₹16,000 Lowest |
| 10.00 | Total impact of GST for the purpose of CTC | 1 | nos | - | - |
Tender Value
Refer Docs
EMD Value
₹7,600
Closing Date
6 Jan 2026, 6:55 pmClosed
SO(ENM)
GM UNIT KUJU
Rewinding of 630KVA, 11KV/440V, SI.No. Ara/Tr/02 distribution transformer, installed at Ara Kanta Sub-station of Ara Colliery, which was being used for lighting power supply to 11No. Colony, 48No. Colony and Ara Kanta Colony of
2025_CCL_350149_1
GM (K)/EnM/eTender/25-26/172
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹7,600
31 Jan 2026
26 Dec 2025
7 Jan 2026
26 Dec 2025
6 Jan 2026
26 Dec 2025
26 Dec 2025 - 3 Jan 2026
12 SWG Dual Coated Copper Wires, Class H+, Temperature Index 200 DEG Centrigrad
Less Scrap value Sl No-2 @ 60%
Insulation cost @15% of Sl.No.-2
Labour cost @ 15% of Sl.No.-2
Profit 10% Sl.No. 2 to 5
Supply and installation of 11 KV rated Bushing Stud with insulator for
Filtration of transformer oil for 11/0.4 KV 3 phase 50 cycle oil immersed, naturally cooled, distribution transformer upto desired break down value.
Dismantalling and installation of transformer
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.91 MB
BOQ_362899.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .