Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹77.0 LAccepted-AOC | ₹77.0 L Quoted ₹90.8 L | L-1 | Accepted-AOC L-1 AGENCY has ALREADY been AWARDED the package VIDE PO NO 4000385079-020-1041 Dated 06.04.2026 and WITH TERMS AND CONDITIONS MENTIONED THEREIN- BEING REGULARISED IN GEPNIC |
| 2 | L-2₹94.2 LRejected-Finance C 286 SECTOR 10 SECTOR 10 98112 GB NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹94.2 L | L-2 | Rejected-Finance OTHER THAN L-1 AGENCY |
| 3 | L-3₹1.3 CrRejected-Finance | ₹1.3 Cr | L-3 | Rejected-Finance OTHER THAN L-1 AGENCY |
| Sl No | Description | Qty | Unit | KASHIKA CONSTRUCTION L1 | DNV INDUSTRIAL SYSTEMS PVT LTD L2 | C CUBE TECHNOLOGIES L3 |
|---|---|---|---|---|---|---|
| 10.00 | SCHEDULE ITEMS | 1 | Nos | 16 ₹3.4 L | 10 ₹3.6 L | 5 ₹4.2 L |
| 20.00 | NON SCHEDULE ITEMS | 1 | Nos | 16 ₹87.4 L | 13 ₹90.6 L | 18.99 ₹1.2 Cr |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
2 Mar 2026, 4:00 pmClosed
G B SATAPATHY, DGM(CONTRACTS SERVICES)
Western Region Head QuartersII Plot No. -87, Sector-24, Atal RAIPUR 492018
ACOUSTIC TREATMENT WORKS AT DEEPANJALI NAGAR TOWNSHIP NTPC SIMHADRI
2026_NTPC_105415_1
NTPC/USSC-CPG1/9900320358
Limited
Civil Works
180 days
Simhadri Super Thermal Power Project
3 documents required · 3 mandatory
₹0
₹1 L
25 May 2026
21 Feb 2026
4 Mar 2026
21 Feb 2026
2 Mar 2026
23 Feb 2026
22 Feb 2026 - 27 Feb 2026
SCHEDULE ITEMS
NON SCHEDULE ITEMS
Scheduled Items List
BoQ_Ver3.0
Reference No: 9900320358
Bidder Name :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender.
NUMBER #
SCHEDULE ITEMS
DSR2023 item: 1.1.1(iv)
DSR2023 item: 13.2.2
DSR2023 item: 14.72
DSR2023 item: 15.57
DSR2023 item: 15.39.2
DSR2023 item: 15.7.4
NON SCHEDULE ITEMS
Providing and fixing of PVC pipes 50mm d
Providing and fixing of PVC pipes 110 mm
Dismantling of exisitng wall tiles
Supply and installation of ceiling tile
Supply and installation of wall ceiling
Supply and installation of wall ceiling
Deployment of mobile scaffolding
Preparation & Submission of drawings
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
TENDER-DOCUMENT-SECTION-II-TO-VIII-PACKAGE-150.rar
Tender Documents • 16.86 MB
BOQ_108648.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid