Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAccepted-Finance VILLAGE BHAMNA KAHANGARH ROAD SAMANA DISTT PATIALA | SAMANA | PATIALA | PUNJAB | L1 | Accepted-Finance Due to L1 | |
| 2 | L2₹15.4 L+₹1.5 L (10.4%)Rejected-Finance | L2 | Rejected-Finance Due to L2 |
Tender Value
₹12.3 L
EMD Value
₹24,600
Closing Date
17 Aug 2021, 11:00 amClosed
EE Bilaspur Division No. 2 HPPWD Bilaspur
EE Bilaspur Division No. 2 HPPWD Bilaspur
Performance based financial incentive 2019-20 (During the year 2020-21) for periodic maintenance etc. (PMGSY roads) on link road to village Gujjar Basti Julakhari in Km. 0/0 to 1/140 (SH-Providing and laying 30mm thick bituminous concrete (VR-0186)
2021_PWD_50993_3
PW-NBT/CB/Tender/2020/5211-16 dated 28.07.2021
Open Tender
Civil Works
Item Rate
90 days
Bilaspur
Refer in SBD
8 documents required · 8 mandatory
₹500
₹24,600
25 Aug 2021
9 Aug 2021
17 Aug 2021
9 Aug 2021
17 Aug 2021
9 Aug 2021
Amount
Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.20 to 0.25Kg(zero point twenty to zero point twenty five kilogramme )per square metre on the prepared bitumenious surface cleaned with Hydraulic broom as per MORD Technical Specification ,2014 Clause-503. including carriage of materials, within all leads , lifts and other incidentals as per direction of Engineer-in-charge.The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying bitumenious concrete with 100-120 TPH batch type hot mix plant producing an average output of 75(Seventy five) Tonne per hour using crushed stone aggregates of specified grading premixed with bitumenious binder V.G 30(Viscosity grade Thirty @ 5.4 to 5.6 (Five point four to Five point Six)percent of mixed and filler transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled vibratory and tandern rollers to achieve the desired degree of compaction as per IRC 29-1988 complete in all respect .(Bitumen concrete )Thickness 25mm(Twenty five milimetre) including carriage of materials, within all leads , lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 KN static roller to achieve the desired degree of compaction as per Technical Specification,2004Clause 506, 50mm(Fifty milimetre ) thick with bitumen V.G-10)(Viscosity grade ten).including carriage of materials, within all leads , lifts and other incidentals as per direction of Engineer-in-charge.The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms. Per Sqm. Area , thickness of 2.5mm is exclusive of surface applied glass beads as per IRC-35 .The finished surface to be level uniform and free from streaks and holes as per MORTH Specifications ncluding carriage of material with in all leads and lifts and other incidentals as per direction of Engineer-in-Charge..The rates includes octroi, ,Malkana toll tax ,goods and serivice tax ,building and other construction workers, welfare cess royality of any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Shivalik Construction Company
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .