| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.3 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹5.6 L+₹26,259.90 (4.93%)Rejected-Finance AYICKAL HOUSE ADIMALY | IDUKKI | KERALA | 685501 | 2 | Rejected-Finance Highest amount quoted | |
| 3 | 3₹5.7 L+₹41,636.06 (7.82%)Rejected-Finance | 3 | Rejected-Finance Highest amount quoted |
| Sl No | Description | Qty | Unit | Bose John L2 | Rajan C P L1 | Shaji Mani L3 |
|---|---|---|---|---|---|---|
| 1.00Renovation work | ||||||
| 1.00 | 2.8.1
Earthworkinexcavationbymechanicalmeans(Hydraulicexcavator)/manualmeans in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 6.88 | cum | 392.09 ₹2,696.01 | 373.75 ₹2,569.91 Lowest | 402.88 ₹2,770.2 |
| 1.00 | 7.1.1
Random rubble masonry with hard stone in foundation and plinth including levelling upwithcementconcrete1:6:12(1cement:6coarsesand:12gradedstoneaggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 10.74 | cum | 9,094.4 ₹97,710.23 | 8,668.89 ₹93,138.55 Lowest | 9,344.7 ₹1,00,399.46 |
| 1.00 | 5.3
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plainwindowsills,staircasesandspiralstaircasesuptofloorfivelevelexcludingthe cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 1.72 | cum | 14,651.93 ₹25,186.67 | 13,966.38 ₹24,008.21 Lowest | 15,055.19 ₹25,879.87 |
| 1.00 | 5.22A.6
SteelreinforcementforR.C.Cworkincludingstraightening,cutting,bending,placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 230.92 | kg | 122.54 ₹28,296.69 | 116.81 ₹26,973.53 Lowest | 125.92 ₹29,077.2 |
| 1.00 | 5.9.5
Centeringandshutteringincludingstrutting,etc.andremovalofformfor:Lintels, beams, plinth beams, girders bressumers and cantilevers | 11.46 | sqm | 831.53 ₹9,529.33 | 792.63 ₹9,083.54 Lowest | 854.42 ₹9,791.65 |
| 1.01 | 50.6.2.1
Solidblockmasonryusingprecastsolidblocks(Factorymade)ofsize30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 7.83 | cum | 7,445.94 ₹58,331.49 | 7,097.55 ₹55,602.21 Lowest | 7,650.87 ₹59,936.92 |
| 1.01 | 13.2.1
15mmcementplasterontheroughsideofsingleorhalfbrickwallofmix:1:4(1 cement :4 fine sand) | 108.93 | sqm | 464.35 ₹50,581.65 | 442.62 ₹48,214.6 Lowest | 477.13 ₹51,973.77 |
| 1.01 | 4.1.8
Providingandlayinginpositioncementconcreteofspecifiedgradeexcludingthe cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 0.88 | cum | 8,646.85 ₹7,591.93 | 8,242.27 ₹7,236.71 Lowest | 8,884.83 ₹7,800.88 |
| 1.01 | 50.9.1.1
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fastenerso frequired dia&length(holdfastlugsordas hfastenershallbepaid for separately), using good quality Anjili wood /jack wood | 0.17 | cum | 1,23,234.76 ₹20,703.44 | 1,17,468.74 ₹19,734.75 Lowest | 1,26,626.55 ₹21,273.26 |
Tender Value
₹5.1 L
EMD Value
₹12,825
Closing Date
25 Aug 2025, 5:00 pmClosed
WILDLIFE WARDENWILDLIFE WARDEN,MUNNAR,MUNNAR
WILDLIFE WARDEN,MUNNAR
Cost of Renovation of Deputy range forest officer quarters building at Manathalam in Pambadum Shola National Park under Shola National Parks during 2025-2026
2025_FD_785377_1
07/2025-2026
Open Tender
Civil Works - Buildings
Item Wise
90 days
Manathalam
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,211
Yes
₹12,825
Yes
12 Nov 2025
12 Aug 2025
27 Aug 2025
12 Aug 2025
25 Aug 2025
12 Aug 2025
12 Aug 2025 - 25 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .