| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 LAccepted-AOC | ₹25.2 L | L1 | Accepted-AOC Being L1 Bidder |
| 2 | L2₹26.8 LRejected-Finance MECHUKHA P O P S MECHUKHA DISTRICT SHI YOMI ARUNACHAL PRADESH 791003 | MECHUKHA | SHI YOMI | ARUNACHAL PRADESH | 791003 | ₹26.8 L | L2 | Rejected-Finance Being L2 bidder |
| 3 | L3₹28.0 LRejected-Finance | ₹28.0 L | L3 | Rejected-Finance Being L3 bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Techno-commercially disqualified |
| Sl No | Description | Qty | Unit | NNNN ENTERPRISE L1 | K.D. ENTERPRISES L3 | YORDUNG TRADING CENTRE L4 | AANA ENTERPRISE L2 |
|---|---|---|---|---|---|---|---|
| 0.00Items | |||||||
| 1.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)(i) Ordinary soil. (B). Mechanical Means (Depth upto 3 m) | 96.77 | Cum | 550.2 ₹53,242.85 | 613.08 ₹59,327.75 | 628.8 ₹60,848.98 | 586.88 ₹56,792.38 |
| 2.00 | Centring and shuttering including strutting, propping etc and removal of form work for.a) Foundation, footings, bases of columns etc. and mass concrete | 71.84 | Sqm. | 495.39 ₹35,588.82 | 552.01 ₹39,656.40 | 566.16 ₹40,672.93 | 528.42 ₹37,961.69 |
| 3.00 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) Foundations and plinth | 20.08 | Cum | 6,879.29 ₹1.4 L | 7,665.49 ₹1.5 L | 7,862.04 ₹1.6 L | 7,337.9 ₹1.5 L |
| 4.00 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications including loading, unloading, transportation, etc.
(A) Random Rubble Masonry | 225.2 | Cum. | 6,844.95 ₹15.4 L | 7,627.23 ₹17.2 L | 7,822.8 ₹17.6 L | 7,301.28 ₹16.4 L |
| 5.00 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications including loading, unloading, transportation, etc. | 103 | Each | 254.1 ₹26,172.30 | 283.14 ₹29,163.42 | 290.4 ₹29,911.20 | 271.04 ₹27,917.12 |
| 6.00 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand).d) Raised and Cut pointing | 135 | Sqm. | 282.87 ₹38,187.45 | 315.2 ₹42,552 | 323.28 ₹43,642.80 | 301.73 ₹40,733.55 |
| 7.00 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications including loading, unloading, transportation, etc. | 55 | Sqm. | 227.96 ₹12,537.80 | 252.01 ₹13,860.55 | 260.52 ₹14,328.60 | 243.15 ₹13,373.25 |
| 8.00 | Neat cement punning including loading, unloading, transportation, etc. | 55 | Sqm. | 68.15 ₹3,748.25 | 75.93 ₹4,176.15 | 77.88 ₹4,283.40 | 72.69 ₹3,997.95 |
| 9.00 | Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip. | 429.1 | Cum | 255.15 ₹1.1 L | 284.31 ₹1.2 L | 291.6 ₹1.3 L | 272.16 ₹1.2 L |
Tender Value
₹24.0 L
EMD Value
₹48,000
Closing Date
20 Jan 2026, 2:00 pmClosed
DGM Tech CNP Wing Office of the HOP
Office of the HOP Tato-I II and Heo HEP AP
Construction of Slope Protection Wall for Assam Type Staff Hostels No 01 and 02 at Tato II H E Project Shi Yomi District Arunachal Pradesh
2026_NEEPC_261967_1
NEEPCO/HOP/TTH/2025-26/ 07 Dated 06.01.2026
Limited
Civil Works - Others
30 days
TATO-II HEP Tato Arunachal Pradesh
As per NIB
3 documents required · 3 mandatory
₹0
₹48,000
14 Feb 2026
7 Jan 2026
21 Jan 2026
7 Jan 2026
20 Jan 2026
7 Jan 2026
7 Jan 2026 - 10 Jan 2026
Items
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)(i) Ordinary soil. (B). Mechanical Means (Depth upto 3 m)
Centring and shuttering including strutting, propping etc and removal of form work for.a) Foundation, footings, bases of columns etc. and mass concrete
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) Foundations and plinth
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications including loading, unloading, transportation, etc. (A) Random Rubble Masonry
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications including loading, unloading, transportation, etc.
Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand).d) Raised and Cut pointing
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications including loading, unloading, transportation, etc.
Neat cement punning including loading, unloading, transportation, etc.
Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
Cost of Haulage of Bitumen Excluding Loading and Unloading on hill roads. Haulage of materials by truck excluding cost of loading, unloading and stacking.Surfaced Road
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_303311.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Bid_document.pdf
Tender Documents • 3.03 MB
BOQ_303311.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid