Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | L1 | Accepted-AOC L1 Accepted | |
| 2 | L2₹21.2 L+₹1.4 L (7.10%)Rejected-AOC NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | L2 | Rejected-AOC L2 Rejected | |
| 3 | L3₹26.1 L+₹6.3 L (32.1%)Rejected-AOC | L3 | Rejected-AOC L3 Rejedcted |
Tender Value
₹30.3 L
EMD Value
₹50,000
Closing Date
28 Mar 2020, 5:00 pmClosed
Executive Engineer
Executive Engineer Irrigation Division Ernakulam
Desilting
2020_Irrig_352252_1
55/EE/I/2019-20/S
Open Tender
Civil Works - Others
Item Rate
120 days
Thuravom bridge
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,250
online
₹50,000
Yes
8 Jun 2020
20 Mar 2020
31 Mar 2020
20 Mar 2020
28 Mar 2020
20 Mar 2020
20 Mar 2020 - 28 Mar 2020
Amount
SCHEME 1
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME -2
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 3
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 4
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 5
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 6
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 7
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 8
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 9
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 10
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SHEME11
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SHEME 12
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SHEME 13
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SHEME 14
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SHEME 16
od51948/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 16
od54285/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 17
od54285/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 18
od54285/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 19
od54285/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 20
od54285/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 21
od54285/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
DAISY JOSE
YEM PEES CONTRACTING
Bidder Name
DAISY JOSE
P.C TOMY
YEM PEES CONTRACTING
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .