Tender Value
₹10.2 L
EMD Value
₹10,500
Closing Date
11 May 2026, 6:00 pmClosed
Chief Officer, Sihor Nagarpalika, Sihor
Providing, Supplying, Lowering, Laying and Jointing of RCC Pipe Drainage Line and PVC Pipe Line, At Various Location Chart, At. Sihor. Under 15 Percentage Vivkeadhin Grant Year-2023-24 and 24-25.(Second Attempt)
299281
77/2026
Open
Civil Works - Water Works
Bhavnagar
3 documents required · 3 mandatory
₹900
Chief Officer, Sihor Nagarpalika
₹10,500
28 Apr 2026
28 Apr 2026
28 Apr 2026
11 May 2026
28 Apr 2026
NAME OF WORK: PROVIDING, SUPPLYING, LOWERING, LAYING AND JOINTING OF RCC PIPE DRAINAGE
LINE AND PVC PIPE LINE AT VARIOUS LOCATION CHART, AT. SIHOR.
TOTAL AMOUNT PUT TO TENDER
TOTAL AMOUNT PUT TO TENDER
PERCENTAGE RATE TENDER
Sr.No. Schedule Amount
1 Schedule - "B"- 1
2 Schedule - "B"- 2
3 Schedule - "B"- 3
4 Schedule - "B"- 4
5 Schedule - "B"- 5
Total Amount Rs…...
Total Amount Rs…...
I/We am/are willing to carry out the work @ ________% Above / Below_________Percentage (should be writen in
figures and words) of the Estimated rates mentioned above amount of my / our Tender works out as under.
Estimated Amount Estimated Amount
Put to Tender Rs. 10,22,468=00 Put to Tender Rs. 10,22,468=00
Add ..............% Rs. Deduct %Rs.
Total Rs. Total Rs.
(In Words (In Words
Stamp with Signature of Contractor
Consl. Engineer Engineer
"DESIGN POINT" Shihor Nagarpalika
Chief Officer President
Shihor Nagarpalika Shihor Nagarpalika
SIHOR NAGARPALIKA - SIHOR
DIST. : BHAVNAGAR
SCHEME :- 15% VIVEKADHIN GRANT YEAR-2024-25
NAME OF WORK:- PROVIDING, SUPPLYING, LOWERING, LAYING AND JOINTING OF 300MM DIA. RCC (NP3)
LOCATION : Ramnagar Plot Area, Himmatbhai's House To Dhanjibhai's House, Sihor.
SCHEDULE - "B-1"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Providing and supplying ISI Standard R.C.C. pipes in standard lengths
of following class and diameter suitable for either collar joints or rubber
ring joints including all taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS - 458/ 1989) Note :
One collar should be supplied with each full length plain ended RCC
pipe, cost included in rates below. One rubber ring should be supplied
with each full length socketed pipe, cost included in rates below.
(D) Class NP-3 Test Pressure 0.7 kg/Sqcm. 300mm dia 78.00 755.00 Rmt
Providing and constructing Sewer manholes, scraper manholes and unit
house connection chamber, as per the type design in brick masonary in
C. M. 1:5 and outsice plastering in C. M. 1:3 necessary 100mm coping
with reinforcement in R.C.C.M. 200 fixing C. I. steps and fixing manhole
frame and covers (But excluding supply of manhole frame and covers)
over manholes and house connection chambers and fixing Manhole
covers (but excluding supplying of manhole covers) over scraper
manhole etc. complete, providing and fixing safety chain wherever
necessary as per the stipulations in the type desing comp. as per latest
CPHEEO manual (incl. excavation)
a) Manhole type 'A' - Circular, having inside diameter of 1200mm
for depth up to 1.50m (For 150 mm to 500mm dia. sewers).
Manhole type "A" as above but upto 1.0m depth 2.00 12179.00 No
RCC precast M.H. Frame & Cover Manufacture, supply & Delivery at
store or at site of work precast RCC M.200 Frame & cover suitable to
drainage M.H. and as per type design & Drawing including cost of
reinforcement M.S. Angles or Flate, curring mold work etc. Heavy Duty
Frame Suitable for 50cm opening of MH 2.00 1121.00 No
Cover Suitable for 50cm opening of MH 2.00 1173.00 No
Excavation for pipe line trenches incl. all safety provisions using site rails
and stacking excavated stuff up to a lead of 90 mts. cleaning the site
etc. complete for lifts and strata as specified. # 0.00 to 1.50m a) In all
sorts of soil and soft murrum (50%) 37.45 89.00 M3
b) In hard murrum, boulders Incl. macadam road (50%) 37.45 135.00 M3
Lowering, laying and jointing R.C.C. pipes with gasket joint of following
diameters in proper position, grade and alignment as directed by
Engineer-in-charge including conveyance from stores to site of work,
labour, giving hydraulic testing as per ISI code, etc complete including
cost of jointing materials. R.C.C. NP-3 300MM Dia 78.00 119.00 Rmt
Refilling the pipe line trenches including ramming,watering,consolidating
& disposal of surplus stuff as directed within a radius of 3km. 61.82 22.00 Cumt
Total Amounts Rs...……
Total Amounts Rs...……
Stamp with Signature of Contractor
Consl. Engineer Municipal Engineer Chief Officer President
"DESIGN POINT" Sihor Nagarpalika Sihor Nagarpalika Sihor Nagarpalika
Amreli Sihor Sihor Sihor
SIHOR NAGARPALIKA - SIHOR
DIST.: BHAVNAGAR
SCHEME :- 15% VIVEKADHIN GRANT YEAR-2023-24
NAME OF WORK :- PROVIDING, SUPPLYING, LOWERING, LAYING AND JOINTING OF 300MM DIA. RCC (NP3)
LOCATION : Mani Bazar, Gandhi Complex To Police Station, Sihor.
SCHEDULE - "B-2"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Providing and supplying ISI Standard R.C.C. pipes in standard lengths
of following class and diameter suitable for either collar joints or rubber
ring joints including all taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. Note: One collar should be
supplied with each full length plain ended RCC pipe, cost included in
rates below. One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below.10.1 (D) Class NP-3 Test
Pressure 0.7 kg/Sqcm. 300mm dia 375.00 755.00 Rmt
Providing and constructing Sewer manholes, scraper manholes and unit
house connection chamber, as per the type design in brick masonary in
C. M. 1:5 and outsice plastering in C. M. 1:3 necessary 100mm coping
with reinforcement in R.C.C. M-200 fixing C.I. steps and fixing manhole
frame and covers (But excluding supply of manhole frame and covers)
over manholes and house connection chambers and fixing Manhole
covers (but excluding supplying of manhole covers) over scraper
manhole etc. complete, providing and fixing safety chain wherever
necessary as per the stipulations in the type desing comp. as per latest
CPHEEO manual (incl. excavation) a) Manhole type 'A' - Circular,
having inside diameter of 1200mm for depth up to 1.50m (For
mm to 500mm dia. sewers).1. Manhole type "A" as above but upto
a) Manhole type 'B' - Circular, type having inside diameter of
1500mm and for depth up to 1.50m to 4.0m. (For 150 mm to 600mm
dia. sewers). 1. Manhole type "B" as above but upto 1.5m depth
RCC precast M.H. Frame & Cover Manufacture, supply & Delivery at
store or at site of work precast RCC M.200 Frame & cover suitable to
drainage M.H. and as per type design & Drawing including cost of
reinforcement M.S. Angles or Flate, curring mold work etc. Heavy Duty
Frame Suitable for 50cm opening of MH 13.00 1121.00 No
Cover Suitable for 50cm opening of MH 13.00 1173.00 No
Excavation for pipe line trenches incl. all safety provisions using site rails
and stacking excavated stuff up to a lead of 90 mts. cleaning the site
etc. complete for lifts and strata as specified. # 0.00 to 1.50m 300mm
Dia a) In all sorts of soil and soft murrum (20%) 114.38 89.00 M3
b) In hard murrum, boulders Incl. macadam road (50%) 285.94 135.00 M3
c) In soft rock and / or masonry in CM or L M or (30%) 171.56 163.00 M3
Providing bedding incl. ramming, watering, levelling, consolidationg etc..
Complete as per standard and instruction of engineer in charge
Lowering, laying and jointing R.C.C. pipes with gasket joint of following
diameters in proper position, grade and alignment as directed by
Engineer-in-charge including conveyance from stores to site of work,
labour, giving hydraulic testing as per ISI code, etc complete including
cost of jointing materials.R.C.C. NP-3 300mm Dia 375.00 119.00 Rmt
Refilling the pipe line trenches including ramming, watering,
consolidating & disposal of surplus stuff as directed within a radius of
Total Amounts Rs…….
Total Amounts Rs…….
Stamp with Signature of Contractor
Consl. Engineer Municipal Engineer
"DESIGN POINT" Sihor Nagarpalika
Chief Officer President
Sihor Nagarpalika Sihor Nagarpalika
SIHOR NAGARPALIKA - SIHOR
DIST. : BHAVNAGAR
SCHEME :- 15% VIVEKADHIN GRANT YEAR-2023-24
NAME OF WORK :- PROVIDING, SUPPLYING, LOWERING, LAYING AND JOINTING OF PVC PIPE LINE
LOCATION : Ward No. 1, Ramnagar Area, Rajvadi Mistri's House To Nagarbhai's House, Sihor.
SCHEDULE - "B-3"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Providing and supplying in standard length ISI mark rigid unplasticised PVC
pipe suitable for potable water with ringfit joint including cost of ring as per
IS specification no. 4985/1988 including all local and central taxes,
transportation, freight charges, octrol, inspection charges, loading,
unloading conveyance to the departmental stores and incl. cost jointing
material etc. complete Test Pressure 6 Kg/cm² 90mm Ø PVC Pipe Line 240.00 139.00 Rmt
Providing and supplying at store or site of work incl. freight, loading,
unloading, stacking, insurance and all taxes etc. complete PVC Bend
(Moulded) Heavy 90mm 1.00 318.00 No
PVC Reducer (Moulded) 160 x 90mm 1.00 304.00 No
PVC Tail piece with P.V. C. Flange (ISI) Heavy duty (Moulded) 90mm 1.00 236.00 No
Excavation for pipe line trenches incl. all safety provisions using site rails
and stacking excavated stuff up to a lead of 90 mts. cleaning the site etc.
complete for lifts and strata as specified. # 0.00 to 1.50m 90mm Ø PVC
Pipe Line a) In all sorts of soil and soft murrum (20%) 40.32 89.00 M3
b) In hard murrum, boulders Incl. macadam road (50%) 100.80 135.00 M3
c) In soft rock and / or masonry in CM or L M or (20%) 40.32 163.00 M3
d) In hard rock / or in c.c. 1:2:4 or RCC with blasting, chiseling or by
chiseling/breaking (10%) 20.16 372.00 M3
Providing bedding incl. ramming, watering, levelling, consolidationg etc..
Complete as per standard and instruction of engineer in charge As above
with selected excavated earth available near site 16.80 60.00 M3
Lowering, laying and jointing PVC pipes and specials of following class and
diameter includind coat of converyance from store to site of works including
cost of labour, material, cement solvent, giving satisfactory hydraulic testing
as per ISI code. 90mm Ø PVC Pipe Line 240.00 17.00 Rmt
M.S. specials flanged ends Upto 300mm dia 50.00 98.00 Kg
Refilling the pipe line trenches including ramming, watering, consolidating &
disposal of surplus stuff as directed within a radius of 3km. 183.27 22.00 M3
Making job connection for old pipes in connecting the pipe line with existing
main and inserted of special incl. Cost of excavation cutting of pipes,
dewatering testing refitting etc. complete incl. all jointing materials etc.
comp. (excl. cost of specials pipes and fittings) 1.00 850.00 No
Total Amounts Rs..……
Total Amounts Rs..……
Stamp with Signature of Contractor
Consl. Engineer Municipal Engineer
"DESIGN POINT" Sihor Nagarpalika
Chief Officer President
Sihor Nagarpalika Sihor Nagarpalika
Sihor Sihor Sche
SIHOR NAGARPALIKA - SIHOR
DIST. : BHAVNAGAR
SCHEME :- 15% VIVEKADHIN GRANT YEAR-2023-24
NAME OF WORK :- PROVIDING, SUPPLYING, LOWERING, LAYING AND JOINTING OF PVC PIPE LINE
LOCATION : Ward No. 5, Karmchari Vasaht, Common Plot TO Pravinaba Mangal Singh Gohil's House, Sihor.
SCHEDULE - "B-4"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Providing and supplying in standard length ISI mark rigid unplasticised PVC
pipe suitable for potable water with ringfit joint including cost of ring as per IS
specification no. 4985/1988 including all local and central taxes,
transportation, freight charges, octrol, inspection charges, loading, unloading
conveyance to the departmental stores and incl. cost jointing material etc.
complete 90mm Ø PVC Pipe Line 230.00 139.00 Rmt
Providing and supplying at store or site of work incl. freight, loading,
unloading, stacking, insurance and all taxes etc. complete PVC Reducer
(Moulded) 160 x 90mm 1.00 304.00 No
PVC Tail piece with P.V. C. Flange (ISI) Heavy duty (Moulded) 90mm 1.00 236.00 No
Excavation for pipe line trenches incl. all safety provisions using site rails and
stacking excavated stuff up to a lead of 90 mts. cleaning the site etc. complete
for lifts and strata as specified.# 0.00 to 1.50m 90mm Ø PVC Pipe Line a) In
all sorts of soil and soft murrum (20%) 38.64 89.00 M3
b) In hard murrum, boulders Incl. macadam road (50%) 96.60 135.00 M3
c) In soft rock and / or masonry in CM or L M or (20%) 38.64 163.00 M3
d) In hard rock / or in c.c. 1:2:4 or RCC with blasting, chiseling or by
chiseling/breaking (10%) 19.32 372.00 M3
Providing bedding incl. ramming, watering, levelling, consolidationg etc.
Complete as per standard and instruction of engineer in charge As above with
selected excavated earth available near site 16.10 60.00 M3
Lowering, laying and jointing PVC pipes and specials of following class and
diameter includind coat of converyance from store to site of works including
cost of labour, material, cement solvent, giving satisfactory hydraulic testing
as per ISI code. 90mm Ø PVC Pipe Line 230.00 17.00 Rmt
M.S. specials flanged ends Upto 300mm dia 50.00 98.00 Kg
Refilling the pipe line trenches including ramming, watering, consolidating &
disposal of surplus stuff as directed within a radius of 3km. 175.64 22.00 M3
Making job connection for old pipes in connecting the pipe line with existing
main and inserted of special incl. Cost of excavation cutting of pipes,
dewatering testing refitting etc. complete incl. all jointing materials etc. comp.
(excl. cost of specials pipes and fittings) 1.00 850.00 No
Total Amounts Rs..……
Total Amounts Rs..……
Stamp with Signature of Contractor
Consl. Engineer Municipal Engineer
"DESIGN POINT" Sihor Nagarpalika
Chief Officer President
Sihor Nagarpalika Sihor Nagarpalika
SIHOR NAGARPALIKA - SIHOR
DIST. : BHAVNAGAR
SCHEME :- 15% VIVEKADHIN GRANT YEAR-2023-24
NAME OF WORK :- PROVIDING, SUPPLYING, LOWERING, LAYING AND JOINTING OF PVC PIPE LINE
LOCATION : Navagam Rail Way Nala To Ghanshyambhai Chauhan's House To Common Plot, Sihor.
SCHEDULE - "B-5"
PERCENTAGE RATE TENDER
Item No. & Description Quantity Rate Per Amount
Providing and supplying in standard length ISI mark rigid unplasticised PVC
pipe suitable for potable water with ringfit joint including cost of ring as per IS
specification no. 4985/1988 including all local and central taxes,
transportation, freight charges, octrol, inspection charges, loading, unloading
conveyance to the departmental stores and incl. cost jointing material etc.
complete Test Pressure 6 Kg/cm² 90mm Ø PVC Pipe Line 275.00 139.00 Rmt
Providing and supplying at store or site of work incl. freight, loading,
unloading, stacking, insurance and all taxes etc. complete PVC Reducer
(Moulded) 160 x 90mm 1.00 304.00 No
PVC Tail piece with P.V. C. Flange (ISI) Heavy duty (Moulded) 90mm 1.00 236.00 No
Excavation for pipe line trenches incl. all safety provisions using site rails and
stacking excavated stuff up to a lead of 90 mts. cleaning the site etc.
complete for lifts and strata as specified. # 0.00 to 1.50m 90mm Ø PVC Pipe
Line a) In all sorts of soil and soft murrum (20%) 46.20 89.00 M3
b) In hard murrum, boulders Incl. macadam road (50%) 115.50 135.00 M3
c) In soft rock and / or masonry in CM or L M or (20%) 46.20 163.00 M3
d) In hard rock / or in c.c. 1:2:4 or RCC with blasting, chiseling or by
chiseling/breaking (10%) 23.10 372.00 M3
Providing bedding incl. ramming, watering, levelling, consolidationg etc..
Complete as per standard and instruction of engineer in charge As above with
selected excavated earth available near site 19.30 60.00 M3
Lowering, laying and jointing PVC pipes and specials of following class and
diameter includind coat of converyance from store to site of works including
cost of labour, material, cement solvent, giving satisfactory hydraulic testing
as per ISI code. 90mm Ø PVC Pipe Line 275.00 17.00 Rmt
M.S. specials flanged ends Upto 300mm dia 50.00 98.00 Kg
Refilling the pipe line trenches including ramming, watering, consolidating &
disposal of surplus stuff as directed within a radius of 3km. 209.95 22.00 M3
Making job connection for old pipes in connecting the pipe line with existing
main and inserted of special incl. Cost of excavation cutting of pipes,
dewatering testing refitting etc. complete incl. all jointing materials etc. comp.
(excl. cost of specials pipes and fittings) 1.00 850.00 No
Total Amounts Rs..……
Total Amounts Rs..……
Stamp with Signature of Contractor
Consl. Engineer Municipal Engineer
"DESIGN POINT" Sihor Nagarpalika
Chief Officer President
Sihor Nagarpalika Sihor Nagarpalika
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Tender.pdf
02 Form B-1.pdf
03 Schedule B.pdf
04 Dwg And Section.pdf
05 Terms and Conditions.pdf
06 Tech. Spe. (Item Wise) Drian.pdf
07 Technical Specification (Civil).pdf
08 Vendor list - Civil as on Dt. 10.10.2025.pdf
09 Vendor Civil work.pdf
10 Test Require For Construction Material.pdf
11 GR All.pdf
11.1 DMO_2876_01-May-2025_273.pdf
12 GR Affidavit GR_240217_161336.pdf