| Sl No | Description | Qty | Unit | LAIQUE PP L1 |
|---|---|---|---|---|
| 1.00 | Dismantling 25 mtr high Ground based communication tower, gantry, antenna, platforms and ladders etc. situated at Valiyaparamba(Kasaragod Dt) including cutting bolts or other parts wherever necessary. The dismantled material shall be stacked at the ground as directed by the Engineer in charge. | 5.1 | MT | 12,000 ₹61,200 |
| 2.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 2.2 | Cum | 4,000 ₹8,800 |
| 3.00 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 2.2 | Cum | 500 ₹1,100 |
| 4.00 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete for making template for future foundation bolt alignment for re-erection of Tower. | 90 | Kg | 160 ₹14,400 |
| 5.00 | Supplying and Fixing Mild Steel Anchor Bolts of Required Diameter and Length ( Diameter Varying from 16mm to 32mm ) for Tower Foundation including Making Steel Templates with Necessary Holes to suit the Diameter of the Anchor Bolts including Mechanical threading to the top 15 centimeter length of Bolts , welding with necessary MS Plates at the bottom of independent anchor bolts ,etc. complete .The Anchor Bolts and Template shall be fixed to line and Level keeping the Centre to Centre Distance in tact ,inside the Centering and shuttering of the Tower Beams Before doing concreting of Tower Foundation .( The Rate includes the cost of all Labour involved in the above process of operation inclusive Materials ,Transportation and Fixing Charges and Nothing Extra shall be Paid) | 140 | Kg | 250 ₹35,000 |
| 6.00 | Transportation of the tower materials by mechanical transport from Valiyaparamba to Taliparamba (approximate 42 km) including sorting, loading, unloading and stacking including all incidental charges. | 5.1 | MT | 4,000 ₹20,400 |
| 7.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 11 | Cum | 16,500 ₹1.8 L |
| 8.00Centering and shuttering including strutting, propping etc. and removal of form for: | ||||
| 8.10 | Suspended floors, roofs, landings, balconies and access platform | 23 | Sqm | 800 ₹18,400 |
| 8.20 | Lintels, beams, plinth beams, girders, bressummers and cantilevers. | 37 | Sqm | 850 ₹31,450 |
Tender Value
₹8.9 L
EMD Value
₹17,800
Closing Date
23 Mar 2026, 6:00 pmClosed
EE (CIVIL)
BSNL CIVIL DIVISION KANNUR
Construction of 25mtr roof top tower including foundation, erection, painting, earthing etc. at MANNA, Thaliparamba, Kannur using available tower at Valiyaparamba, Kasaragod
2026_BSNL_271585_1
27/NIT/EE-KNR/2025-26
Open Tender
Civil Works
90 days
Manna, Thaliparamba
Please refer Tender Documents.
2 documents required · 2 mandatory
₹590
Accounts Officer (Cash), BSNL, Kannur.
₹17,800
28 Mar 2026
16 Mar 2026
25 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
Dismantling 25 mtr high Ground based communication tower, gantry, antenna, platforms and ladders etc. situated at Valiyaparamba(Kasaragod Dt) including cutting bolts or other parts wherever necessary. The dismantled material shall be stacked at the ground as directed by the Engineer in charge.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete for making template for future foundation bolt alignment for re-erection of Tower.
Supplying and Fixing Mild Steel Anchor Bolts of Required Diameter and Length ( Diameter Varying from 16mm to 32mm ) for Tower Foundation including Making Steel Templates with Necessary Holes to suit the Diameter of the Anchor Bolts including Mechanical threading to the top 15 centimeter length of Bolts , welding with necessary MS Plates at the bottom of independent anchor bolts ,etc. complete .The Anchor Bolts and Template shall be fixed to line and Level keeping the Centre to Centre Distance in tact ,inside the Centering and shuttering of the Tower Beams Before doing concreting of Tower Foundation .( The Rate includes the cost of all Labour involved in the above process of operation inclusive Materials ,Transportation and Fixing Charges and Nothing Extra shall be Paid)
Transportation of the tower materials by mechanical transport from Valiyaparamba to Taliparamba (approximate 42 km) including sorting, loading, unloading and stacking including all incidental charges.
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for:
Suspended floors, roofs, landings, balconies and access platform
Lintels, beams, plinth beams, girders, bressummers and cantilevers.
Columns, Pillars, Piers, Abutments, Posts and Struts
Reinforcement for reinforced cement concrete works including straightening, cutting, bending, binding and placing in position all complete.
Thermo Mechanically Treated Bars
Providing and laying cement concrete masonry blocks masonry 150 mm thick in super structure, above plinth level up to floor V level in cement mortar 1:6 (1 cement : 6 coarse sand )
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).
Finishing walls with Acrylic Smooth exterior paint of required shade.
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)
Supply of missing tower materials conforming to ISRC Specifications using MS hot dipped galvanized angle sections conforming to specification attached to the respective towers including ladder, working platform, antenna fixtures, GI Nut and bolts etc. MS angles of Yst 22/210 grade and conforming to IS 1161 etc. complete
Erection of Ground Based Communication tower including assembling the Structural Members of the Tower ,tightly connecting with GI nuts, bolts ,plate washers ,ring washers etc. including making use of necessary hoisting / climbing arrangements , safety belts and all necessary precautionary measures to safeguard the building , working labours and general public etc. to form the Finished Tower to Conform the Standard Drawings /Design/Alignment etc. complete
25 mtr Tower
Providing and applying Synthetic Enamel paint of approved Brand and Manufacture over the Ground Based communication tower ( NB ) . One coat of Etch Primer (MRF, Asian paint or equivalent) should be applied first followed by one coat of zinc chromate primer .Over that two or more coats of enamel paint Orange/ White ( Standard Colors Specified for Communication Towers ) of approved brand and manufacture should be applied.) All works to be completed as per the Standard Specifications and according to the directions of the Engineer in charge.
25 mtr Tower
Providing GI plate earth including excavation of pit of size 2000x2000x3000mm depth in all kinds of soils and placing four numbers of G I plates of size 600x600x6 mm thick vertically at diagonally opposite ends in the excavated pit and inter connecting the plates with 4 Nos. of 50x3mm G I strips with 2 no.s of G I bolts and nuts of 10mm dia at each connection and covering the joints with bitumen, placing G I pipe of 50mm internal dia ( B Class) and 3000mm length at the center of the plate grid for watering and filling the pit with fine ash and / or finally sieved good quality soil including ramming in 20 cm layers etc. complete and cover the pit with 750x750x50mm thick precast reinforced cement concrete slab having 100mm dia hole at the centre to pass the GI pipe and construct a chamber having:
Internal size not less than 280x280x250mm with half brick wall including fixing CI manhole cover of size 300x300mm of weight not less than 7.20 Kg. (cover & frame) and plastering the chamber on all sides with cement mortar 1:4 of 12mm thick (1 cement : 4 fine sand) and including disposal of surplus excavated earth if any within a distance of 5 Km lead as directed by the Engineer-in-Charge.
Providing G I strips of size 50x3 mm one end connected to the tower leg with G I bolts and nuts [with lead sheath in between] including providing and connecting the legs at the bottom of tower and the other end shall be connected to the G I plate earth/ring earth with G I bolts and nuts [with lead sheath in between] including clamping the down lead flat to walls/stems without any sharp bends using necessary clamps and screws as directed by the Engineer-in-Charge. (All joints should be covered by Shalimar or equivalent water proof tape and made air tight)
Providing and fixing copper lightning conductor of 1500mm length, 25mm dia hollow tube of wall thickness not less than 1.6mm…including tinning the bottom portion of the spike for a length not less than 150 mm (lightning conductor to be fixed at the top of the tower) and connecting the GI bus bar to the lightning arrester using 2 Nos. 10 mm dia brass bolts and nuts all complete as directed by the Engineer-in-charge. (All joints should be covered by Shalimar or equivalent water proof tape and made air tight)
Providing GI bus bar of 50 x 3 mm connected to the tinned bottom portion of lightning conductor and to the ring earth/plate earth with 2 no.s of 10 mm dia GI nuts & bolts [with lead sheath in between] at each connection. The bus bar shall be drawn through heat shrink sleeve and shall be shrunk properly. The bus bar shall be clamped to the tower/ building walls at uniform interval of 1.5 Mt.. using proper GI clamps and ceramic insulators such that the bus bar shall be well insulated from the tower building walls all complete as directed by the Engineer-in-charge. (All joints should be covered by Shalimar or equivalent water proof tape and made air tight)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
technical_316682.pdf
techsummary_316682.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
NITRTTMANNA.pdf
Tender Documents • 1.22 MB
BOQ_316682.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid