| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | ₹16.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹16.8 LRejected-Finance | ₹16.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹17.5 LRejected-Finance GHUMARWIN DIVISION HP PWD GHUMARWIN | ₹17.5 L | L3 | Rejected-Finance L3 |
| 4 | L4₹20.7 LRejected-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | ₹20.7 L | L4 | Rejected-Finance L4 |
| 5 | L5₹22.5 LRejected-Finance VILLAGE P O AMARPUR TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | ₹22.5 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | ARVIND KUMAR L3 | Manoj Kumar L4 | Arun Chaudhary L2 | RAKESH KUMAR L1 | Manohar Lal L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction and fabrication of steel truss bridge of 20mtr.span as per approved/vetted design / drawing of reputated institute like IIT Mandi & NIT Hamirpur in built up sections,trusses & framed work,i/c cutting,hoisting & fixing in position & applying a priming coat of red paint :-In grating, framed ,guards,bars,ladders, railing,brackets & similar works and as per entire satisfaction of Engineer - In- Charge. | 8,693.1 | Kg | 150 ₹13,03,965 | 180 ₹15,64,758 | 150 ₹13,03,965 | 135 ₹11,73,568.5 | 190 ₹16,51,689 |
| 2.00 | Excavation in foundation, trenches etc. in earthwork in all kind of soil such as pick work, jumper work , blasting hard or soft soil , lift up to 1.50 mtr. Stacking the excavated soil not more than 3 mtr. Clear from the edge of the excavation and then returning the stacked soil in 15 cm layers, when required in to plinth side of foundation etc. consolidating each deposited layer by ramming watering and then disposing of all surplus excavated earth as directed with in a lead of 20 mtrs and as per entire satisfaction of Engineer - In- Charge. | 41.07 | Cum | 300 ₹12,321 | 480 ₹19,713.6 | 206.15 ₹8,466.58 | 350 ₹14,374.5 | 500 ₹20,535 |
| 3.00 | Providing and laying cement concrete 1:3:6 (1cement: 3sand: 6 graded stone agg. 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts and as per entire satisfaction of Engineer - In- Charge. | 2.15 | Cum | 6,000 ₹12,900 | 11,000 ₹23,650 | 3,050 ₹6,557.5 | 8,200 ₹17,630 | 11,500 ₹24,725 |
| 4.00 | Providing and laying cement concrete 1:1:2 (1 cement: 1 sand: 2 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work & reinforcement for reinforced concrete work in:- foundation and plinth in all leads and lifts and as per entire satisfaction of Engineer - In- Charge. | 22 | Cum | 9,000 ₹1,98,000 | 11,500 ₹2,53,000 | 4,000 ₹88,000 | 9,500 ₹2,09,000 | 12,000 ₹2,64,000 |
| 5.00 | Providing form work with steel plates 3.15 mm thick welded with angle iron in frames 30x30x5 mm so as to give a fair finish i/c centring, shuttering, strutting and propping etc. with wooden battens & ballies, ht. of propping & centring below supporting floor to ceiling not exceeding 4 mtrs. & removal of the same for insitu-reinforced concrete work in:Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses in all leads and lifts and as per entire satisfaction of Engineer - In- Charge. | 52.5 | Sqmt | 450 ₹23,625 | 470 ₹24,675 | 320 ₹16,800 | 300 ₹15,750 | 500 ₹26,250 |
| 6.00 | Providing mild steel/tor Steel reinforcement for R.C.C work including bending, binding and placing in position complete up to floor two level in all leads and lifts and as per entire satisfaction of Engineer - In- Charge. | 1,870 | Kg | 109 ₹2,03,830 | 100 ₹1,87,000 | 137 ₹2,56,190 | 90 ₹1,68,300 | 140 ₹2,61,800 |
Tender Value
₹19.1 L
EMD Value
₹38,200
Closing Date
28 Apr 2026, 3:00 pmClosed
EE JSV Division Jagatkhana
EE JSV Division Jagatkhana
(SH Steel truss bridge for crossoing of 400 mm dia MSERW pipe and 250 mm dia DI pipe with RCC Anchorage Blocks on both ends). (RVNL Deposit)
2026_HPIPH_134676_1
NIT 1620-1719 Dt 18.04.2026
Open Tender
Civil Works - Others
90 days
Bassi
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Yes
₹38,200
Yes
23 Jun 2026
20 Apr 2026
28 Apr 2026
20 Apr 2026
28 Apr 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction and fabrication of steel truss bridge of 20mtr.span as per approved/vetted design / drawing of reputated institute like IIT Mandi & NIT Hamirpur in built up sections,trusses & framed work,i/c cutting,hoisting & fixing in position & applying a priming coat of red paint :-In grating, framed ,guards,bars,ladders, railing,brackets & similar works and as per entire satisfaction of Engineer - In- Charge. | - | Kg | - | - |
| 2 | Excavation in foundation, trenches etc. in earthwork in all kind of soil such as pick work, jumper work , blasting hard or soft soil , lift up to 1.50 mtr. Stacking the excavated soil not more than 3 mtr. Clear from the edge of the excavation and then returning the stacked soil in 15 cm layers, when required in to plinth side of foundation etc. consolidating each deposited layer by ramming watering and then disposing of all surplus excavated earth as directed with in a lead of 20 mtrs and as per entire satisfaction of Engineer - In- Charge. | - | Cum | - | - |
| 3 | Providing and laying cement concrete 1:3:6 (1cement: 3sand: 6 graded stone agg. 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts and as per entire satisfaction of Engineer - In- Charge. | - | Cum | - | - |
| 4 | Providing and laying cement concrete 1:1:2 (1 cement: 1 sand: 2 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work & reinforcement for reinforced concrete work in:- foundation and plinth in all leads and lifts and as per entire satisfaction of Engineer - In- Charge. | - | Cum | - | - |
| 5 | Providing form work with steel plates 3.15 mm thick welded with angle iron in frames 30x30x5 mm so as to give a fair finish i/c centring, shuttering, strutting and propping etc. with wooden battens & ballies, ht. of propping & centring below supporting floor to ceiling not exceeding 4 mtrs. & removal of the same for insitu-reinforced concrete work in:Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses in all leads and lifts and as per entire satisfaction of Engineer - In- Charge. | - | Sqmt | - | - |
| 6 | Providing mild steel/tor Steel reinforcement for R.C.C work including bending, binding and placing in position complete up to floor two level in all leads and lifts and as per entire satisfaction of Engineer - In- Charge. | - | Kg | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
PWD6.pdf
Tender Documents • 0.65 MB
PWD8.pdf
Tender Documents • 1.30 MB
TC.pdf
Additional Documents • 0.50 MB
BOQ_199302.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid