Loading…
Loading…
Tender Value
₹5.8 L
EMD Value
₹30,000
Closing Date
20 Jun 2026, 4:00 pmClosed
DEPUTY EXECUTIVE ENGINEER, CAPITAL PROJECT ELECTRICAL SUB DN NO 23, GANDHINAGAR
All in Comprehensive Maintenance of VRV and split AC machine Installed at staff training college,Sector -17 ,Gandhinagar.(for One year) [2nd attempt]
314676
04/03 OF 2026/2027
Open
Electrical - AC Maintenance
Works
Gandhinagar
9 documents required · 9 mandatory
₹900
Dy. Executive Engineer, Capital Project Electrical Sub Division No 23, Gandhinagar.
₹30,000
16 Jun 2026
16 Jun 2026
16 Jun 2026
20 Jun 2026
16 Jun 2026
All in Comprehensive Maintenance of VRV and split AC machine Installed at staff training college,Sector -17 ,Gandhinagar.(for 1 year) [2nd
Fund Head : 4059 PW - M&R -SR
Sr. No. Item No. Particulars. Qty. Rate Amount
Signature of Contractor Deputy.Executive.Engineer Executive Engineer
C.P.Electrical. R & B Sub Dn 23 C.P Electrical R & B Division
Gandhinagar Gandhinagar.
All in Comprehensive Maintenance of VRV and split AC machine Installed at staff training college,Sector -17
,Gandhinagar.(for One year) [2nd atttempt]
Estimated Quantity Item Description Unit Amount in Rs.
No. in Figure In Word
All inclusive comprehensive maintenance cost for the period of one
year for the VRV Air-conditioning system of following Capacity.
(Note:- (1) The All inclusive comprehensive maintenance cost
covers the yearly maintenance cost of the electrical machineries with
material & Labour cost including preventive maintenance. The cost
covers entire installation from outlet of main switch to electrical
machine.(2) All inclusive comprehensive maintenance cost of VRV
Air conditioners covers the yearly maintenance & preventive
1 maintenance with all required painting materials & labours. including
sheet metal work, refrigerant gas , compressor & all the contains
parts. The cost covers entire installation from outlet of main switch
to the Unit.(3) All inclusive comprehensive maintenance cost of VRV
Air conditioners covers all the indoors,outdoors, copper tubing, drain
pipe, remote control,wiring etc.)
Fifty five thousand
a 1 Job ( A ) 70 HP VRV System 155434.7 four hundred thirty Job
four Paise seven
Rupees Three Lac
fifty five thousand
b 1 Job (B )134 HP VRV System 355333 Job
three hundred thirty
All inclusive comprehensive maintenance cost for the period of one
year for the Inverter Based Split type Air-conditioning Unit of
following Capacity (B) 1.5 ton capacity. ..Note: (1) The All inclusive
comprehensive maintenance cost covers the yearly maintenance
cost of the electrical machineries with material & Labour cost
including preventive maintenance. The cost covers entire installation Rupees Two
from outlet of main switch to electrical machine.(2) All inclusive Thousand Two
2A 3.00 Ea comprehensive maintenance cost of Split type Air conditioners &
Hundred Eighty Two
Water coolers covers the yearly maintenance & preventive Paise six only.
maintenance with all required painting materials & labours. including
sheet metal work, refrigerant gas , compressor & all the contains
parts. The cost covers entire installation from outlet of main switch
to the Unit. (A) Charges for breakdown Maintenance as per
requirement throughout the year.
(B) Charges for 1st Routine Maintenance of Dry Rupees Two
Hundred Sixty seven
2B 3.00 Ea Services between date of commencement to 3rd Months 267.65 Ea
Paise Sixty Five
from date of issue of work order. only.
(C) Charges for 2nd Routine Maintenance of wet
Services with water or Chemical as per site requirement
2C 3.00 Ea 494.9 Hundred Ninety Four Ea
Services between 3rd months to 6th Months from date Paise nine only.
of issue of work order.
(D) Charges for 3rd Routine Maintenance of Dry Rupees Two
Hundred Sixty seven
2D 3.00 Ea Services between 6th months to 9th Months from date 267.65 Ea
Paise Sixty Five
of issue of work order. only.
(E) Charges for 4th Routine Maintenance of wet Services
with water or Chemical as per site requirement Services
2E 3.00 Ea 494.9 Hundred Ninety Four Ea
between 9th months to 12th Months from date of issue Paise nine only.
of work order. .
All inclusive comprehensive maintenance cost for the
period of one year for the Inverter Based Split type Air-
conditioning Unit of following Capacity (C) 1.7 to 2.0 ton
capacity..Note: (1) The All inclusive comprehensive
maintenance cost covers the yearly maintenance cost of
the electrical machineries with material & Labour cost
including preventive maintenance. The cost covers entire
installation from outlet of main switch to electrical Rupees Two
machine.(2) All inclusive comprehensive maintenance Thousand Eight
3A 13.00 Ea 2829.01 Hundred Twenty Ea
cost of Split type Air conditioners & Water coolers covers Nine Paise zero one
the yearly maintenance & preventive maintenance with all only.
required painting materials & labours. including sheet
metal work, refrigerant gas , compressor & all the
contains parts. The cost covers entire installation from
outlet of main switch to the Unit. (A) Charges for
breakdown Maintenance as per requirement throughout
(B) Charges for 1st Routine Maintenance of Dry Rupees Three
Hundred Thrirty
3B 13.00 Ea Services between date of commencement to 3rd Months 330.27 Ea
Paise Twenty Seven
from date of issue of work order. only.
(C) Charges for 2nd Routine Maintenance of wet
Rupees Six Hundred
Services with water or Chemical as per site requirement
3C 13.00 Ea 612.06 twelve paise zero six Ea
Services between 3rd months to 6th Months from date only.
of issue of work order.
(D) Charges for 3rd Routine Maintenance of Dry Rupees Three
Hundred Thrirty
3D 13.00 Ea Services between 6th months to 9th Months from date 330.27 Ea
Paise Twenty Seven
of issue of work order. only.
(E) Charges for 4th Routine Maintenance of wet Services
Rupees Six Hundred
with water or Chemical as per site requirement Services
3E 13.00 Ea 612.06 twelve paise zero six Ea
between 9th months to 12th Months from date of issue only.
of work order. .
RUPEES IN WORDS : Rupees Five Lacs Eighty three thousand four hundred sixty eight Paise five only.
Signature of Contractor Deputy.Executive.Engineer Executive.Engineer.
C.P.Electrical. R & B Sub Div-23 C.P.Electrical R & B Division
Gandhinagar Gandhinagar
I/We am/are willing to carry out the work at(No above rates allowed) ____________% below ___________________________________
__________________percent (Should be written in figures and words) below the tendered rates mentioned above.
Amount of my/our tender works out as under :
Put to Tender Rs. 583,468.51 Put to Tender Rs.
(Please strike out whichever is not applicable)
1 I/We hereby declare that I/We have visited the site, fully exquisite myself/ourselves with the local situation regarding materials and other factors pertaining
to the work before submitting this tender.
2 I/we hereby declare that I/We carefully studied the conditions of specifications and other tender documents of this work and agree to execute the same
3 A tender with any overwriting in percentage (should both in word and figures) rejected out right.
4 Insertions and/or corrections in the percentage quoted ( both in word and figures) resulting into increase in the value of the work shall be rejected outright
unless it is authenticated by the office opening the tender at the time of opening of tender.
Signature of Contractor Deputy.Executive.Engineer Executive Engineer
C.P.Electrical R & B Sub Dn 23 C.P Electrical R & B Division
Gandhinagar Gandhinagar.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Condition - AMC - A.C. - STC - Sector 17 .pdf
G S T LTR.pdf
GR.pdf
SBD Document.pdf
schedule a b and c.pdf
DocScanner 16 Jun 2026 2-27 pm.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .