Loading…
Loading…
Tender ID
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
25 Feb 2026, 6:00 pmClosed
Chief General Manager (P), Gujarat Water Infrastructure Limited
Comprehensive Operation, Maintenance & Repair of NC-2 Project Chavand to Amreli & Chavand to Babra to Kotdapitha Bulk Water Transmission Pipeline including all related civil assets with proper supply of water as per demand for 60 months District: Amreli.
264380
05/2026
Open
Civil Works - Water Works
Works
Gandhinagar
3 documents required · 3 mandatory
₹3,600
Chief General Manager (P), Gujarat Water Infrastructure Limited
₹1.7 L
3 Feb 2026
3 Feb 2026
3 Feb 2026
25 Feb 2026
3 Feb 2026
Estimated Cost: Rs.
Chief General Manager (Project)
GUJARAT WATER INFRASTRUCTURE
LIMITED Gandhinagar
Bid Documents for
Five-year O&M of NC-2 Bulk Pipeline Project
SR.NO. PARTICULARS PAGE NO
3 Schedule – A 8-9
Volume-III, PRICE BID NC-2 Pipeline
Name of Work: Comprehensive Operation, Maintenance & Repair of NC-2 Project
Chavand to Amreli & Chavand to Babra to Kotdapitha Bulk Water Transmission
Pipeline including all related civil assets with proper supply of water as per
demand for 60 months District: Amreli.
(1) The bidder shall quote his firm and fixed price for the entire work under
this Contract, defined in more details in various sections of this bid
(2) The rates and prices shall be submitted in the electronic formats given by
n-procure which is called Schedule-B & Schedule-C. Rates and prices
received in any other formats will be rejected and the Bids will be
(3) It will be entirely at the discretion of the Employer to accept or reject the
bidder’s proposal, without giving any reasons whatsoever and the bidder
shall not be permitted to withdraw his bid on this account.
to be free supplied from the by client.
(5) In Schedule-B & Schedule-C the Bidder shall quote prices for the items on
percentage rate as called for against the item.
work. Prices quoted in Schedule-B & Schedule-C only will be considered for
price evaluation & shall form a part of the Contract Agreement.
(7) The Bidder shall quote his prices for Operation & Maintenance for five years
in Schedule-B Bidder.
(8) Each item is to be individually priced online and the amounts shall be added
Schedules of prices shall be left blank except where the item description
requires the item to be priced on "as applicable” basis. The item shall not
be priced if it is “not applicable” to the bidder’s design, in which case the
bidder shall add the words “NOT APPLICABLE”. The wording in the item
description is for subject matter guidance only; clause reference are
indicative only and all other relevant clauses shall also be referred to. The
prices shall allow for all the works covered under the bid and all liabilities
and contractual obligations whether separately specified or not.
Volume-III, PRICE BID NC-2 Pipeline
(9) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for maintenance including temporary bunds, diverting water,
pumping, de-watering etc. for the proper execution of works. The rates
shall also be deemed to include any works and setting out that may be
required to be carried out for laying out of all the works involved.
(10) Prices shall be filled online only.
Contract, the Specifications and other sections of these bid documents and
these documents are to be taken as mutually explanatory of one another.
(12) The bidder shall interpret the data furnished and carry out any additional
survey work, or investigation work required at his own cost.
(13) The bidder should acquaint himself with the site conditions including the
access to Work site. The successful bidder shall have to make suitable access
to work sites at his own cost. These accesses will be used by the other
contractors working for GWIL.
and the prices shall include all the equipment’s / materials / accessories
and services required as per the specifications. The bidder shall fill in the
(15) The amount to be quoted for O & M / year shall be as per Volume-IB, General
Conditions of Contract, Clause No.
(16) 1% of the value of work will be deducted from the Running bill against labor
cess which is nonrefundable.
(17) Any expenditure incurred by inspection/ CSC agency for the work
misinformed by the contractor and charges of inspection/ CSC agency
without any work due to misinformation shall be recovered from the
(18) The prices shall be quoted inclusive of all taxes, royalties and duties
prevailing at the time of submission of the bids. Statutory variation if any
during the currency of contract shall have to borne by the agency which
shall be not reimbursed by the GWIL.
(19) The rates quoted shall be exclusive of GST, but inclusive of all other taxes,
duties which shall not be paid extra. While GST will be paid for admissible
part of actual work done at the approved tender rates and tender conditions
of price variations. GST shall be paid as per prevailing rates at the time of
payment. The TDS shall be deducted at source as per provision of IT rules
Volume-III, PRICE BID NC-2 Pipeline
and GWIL policy.
(20) The rates should be quoted exclusive of GST but inclusive of all other taxes
as per Volume-I (B), General Conditions Contract, Clause No.
(21) The Bidders shall have to quote the rates in this tender keeping in view of
the GST. The Complete responsibility of taxes, duties, levies rests with the
Contractor/Agency only.
(22) The process requires that the bidder shall quote his price for the work
prices shall remain firm and fix during the entire period of performance of
(23) Agency shall have to take Insurance policy and intimate to GWIL along with
the evidence within time limit. In case of noncompliance entire
responsibility shall be rest with the agency and required amount shall be
recovered from any due amount of the agency.
(24) GWIL can recover penalty amount from the agency for not taking the
insurance. Though the penalty amount is recovered, responsibility of the
agency for taking insurance shall be continued and will not be escaped from
the responsibility.
(25) The contractor shall apply fair means of stock maintenance and shall adopt
accounting standard as may be prescribed under GST Act as applicable in
the state of Gujarat. For arriving at the difference in procurement prices
due to introduction of GST it will be open for the Board to ask for original
invoices, lorry receipt, weigh bridge slips, payment details and such other
documents as may be required for the purpose.
(26) The rates to be quoted by the contractor must be exclusive of GST but
inclusive of all other taxes. GST should be paid extra on the admissible
payment as per the approved tender rates and condition of price variation;
GST should be paid as per prevailing rates at the time of payment.
Signature of contractor Senior Manager
Volume-III, PRICE BID NC-2 Pipeline
Bidders are required to fill up all the blank spaces in this Bid Form.
Chief General Manager
1st floor Jivaraj Mehata Bhavan
SUB : Comprehensive Operation, Maintenance & Repair of NC-2 Project Chavand to Amreli
& Chavand to Babra to Kotdapitha Bulk Water Transmission Pipeline including all related
civil assets with proper supply of water as per demand for 60 months District: Amreli.
Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of the
above Contract, we the undersigned offer to design, Engineer, procure, construct,
complete, commission, operate and maintain the whole of the said works for 5 years
from the date of commissioning including defects liability period as given in Conditions
of Contract and in conformity with the drawings, conditions of Contract, specifications,
Nos._ (insert numbers) for Lump sum fixed price of Rs. .Rupees ) for
Construction including free trial run for three months or such other sum as may be
ascertained in accordance with the conditions.
1. I/We agree that,
a) if we fail to provide required facilities to the Employer’s representative or any other
person/Agency by the Employer to perform on his behalf for carrying out the inspection
and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved by the
Engineer’s representative.
c) if we fail to deliver water of required quantity according to the conditions/stipulations
of the Contract, the Engineer will be at liberty to take any action including termination
of Contract and impose at his absolute discretion any penalties, and/or reject the work.
Volume-III, PRICE BID NC-2 Pipeline
2. We undertake, if our Bid is accepted, to complete and deliver the works in accordance
with the Contract within months, inclusive of monsoons, from
the date or receipt of Letter of Acceptance issued to us by you.
3. We agree to abide by this Bid for a period of 180+28 days from the Last date of submission
of the bill and it shall remain binding upon us and may be accepted at any time before the
expiry of that period.
4. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract there to annex but until such agreement
is prepared this Bid together with your written acceptance thereof shall constitute a
binding Contract between us.
5. We agree, if our Bid is accepted, to furnish performance /Security in the forms and of
value specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
6. We have independently considered the amounts of liquidated damages shown in Appendix
to Bid and agree that they represent a fair estimate of the damages likely to be suffered
by you in the event of the work not being completed by us in time.
7. We understand that you are not bound to accept the lowest or any Bid you may receive.
Dated this day of __________________
_(Name of the Person)
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature _
Volume-III, PRICE BID NC-2 Pipeline
NAME OF SCHEME – O&M of NC-2 Bulk Pipeline Project
This is a bid documents for Comprehensive Operation, Maintenance & Repair of NC-2 Project
Chavand to Amreli & Chavand to Babra to Kotdapitha Bulk Water Transmission Pipeline
including all related civil assets with proper supply of water as per demand for 60 months
District: Amreli.
Schedule showing the approximately the materials to be supplied to the contractor from
government stores for the work to be executed and the rate at which they are to be charged.
Rate at which the
Sr. material will be charged Place of
Particular Qty.
No. to the contractor Delivery
All the Spares, Tools & Tackles as available with the department will be handed over to the
agency. The agency has to return all the spares, tools & tackles in good working condition to
the department on termination/completion of the contract.
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled
in by the Engineer in Charge at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his
own cost for loading, unloading, and transporting safety to the site of work the
material stipulated in Schedule-A
3. All the surplus materials supplied by the dept. As mentioned in schedule-A should be
handed over to the Department by the contractor at the Govt. stores as directed.
4. The materials mentioned in schedule-A shall have to be checked for their correctness
and soundness by the contractor before taking the delivery of the materials from the
5. The persons of firm submitting the Tender should see that rates in the above schedule
are filled up by the Senior Manager/Executive Engineer, on the issue of form prior to
the submission of the Tender.
Volume-III, PRICE BID NC-2 Pipeline
6. Loading, Unloading with Carting of above materials should be done by contractor at
7. Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause12 of GCC.
Signature of contractor
Volume-III, PRICE BID NC-2 Pipeline
NAME OF SCHEME : NC-2 BULK PIPELINE PROJECT
Schedule-B1 : Operation & Maintenance (For 1st Year )
Comprehensive Operation, Maintenance & Repair of NC-2 Project Chavand to Amreli & Chavand to Babra to
Kotdapitha Bulk Water Transmission Pipeline including all related civil assets with proper supply of water as per
demand for 60 months District: Amreli.
Description Qty. Unit Rate Amount (Rs)
In Figure In Words
Operation, Maintenance & Repair of Metallic Pipeline
(MS Pipeline) of NC-2 Project from Chavand to Amreli,
Chavand to Babra, Babra to Kotdapitha Bulk Pipeline
Project including proper supply of water as per
demand, operation & maintenance of all types of
Valves, Encasing, Thrust block, utility crossings, Valve
chambers, Flanged Connections etc. including all
accessories installed in Pipeline including keeping
records. As per extent of work and as per directed by
Engineer incharge
Chavand to Amreli - 1200 / 1100 mm dia Pipeline
(35.53 Km), Chavand to Babra - 1000 mm dia
Pipeline (9.97 Km), Babra to Kotdapitha - 1000 /
mm dia Pipeline (16.98 Km)
2 Establishment
2a Maintenance Engineer (Civil) 1 Nos 316,800.00
2b Lineman (Unskilled) 4 Nos 221,222.85
2c Fitter (Skilled) 2 Nos 230,767.60
2d Chowkidar(Unskilled) 1 Nos 221,222.85
Volume-III, PRICE BID NC-2 Pipeline
3 Utility Vehicle 1 Nos 312,480.00
Maintenance of Civil Structures : (RCC U/G Sump of
4.50 ML Capacity at Ishwariya HW)
Insurance of Manpower Insurance Manpower engaged
6 Sump Cleaning 4.50 ML Capacity at Ishwariya HW 1 Job 38,580.00
Total Amount for O, M &R First Year, Rs.
Total Amount for O, M &R First Year, Rs.
Signature of Contractor Senior Manager
Volume-III, PRICE BID NC-2 Pipeline
NAME OF SCHEME : NC-2 BULK PIPELINE PROJECT
Schedule-B2 : Operation & Maintenance (For 2nd Year )
Comprehensive Operation, Maintenance & Repair of NC-2 Project Chavand to Amreli & Chavand to Babra to
Kotdapitha Bulk Water Transmission Pipeline including all related civil assets with proper supply of water as per
demand for 60 months District: Amreli.
Description Qty. Unit Rate Amount (Rs)
In Figure In Words
Operation, Maintenance & Repair of Metallic Pipeline
(MS Pipeline) of NC-2 Project from Chavand to Amreli,
Chavand to Babra, Babra to Kotdapitha Bulk Pipeline
Project including proper supply of water as per
demand, operation & maintenance of all types of
Valves, Encasing, Thrust block, utility crossings, Valve
chambers, Flanged Connections etc. including all
accessories installed in Pipeline including keeping
records. As per extent of work and as per directed by
Engineer incharge
Chavand to Amreli - 1200 / 1100 mm dia Pipeline
(35.53 Km), Chavand to Babra - 1000 mm dia
Pipeline (9.97 Km), Babra to Kotdapitha - 1000 /
mm dia Pipeline (16.98 Km)
2 Establishment
2a Maintenance Engineer (Civil) 1 Nos 335,808.00
Lineman (Unskilled)
2c Fitter (Skilled) 2 Nos 244,614.00
2d Chowkidar (Unskilled) 1 Nos 234,497.00
Volume-III, PRICE BID NC-2 Pipeline
3 Utility Vehicle 1 Nos 331,229.00
4 Maintenance of Civil Structures : (RCC U/G Sump of
4.50 ML Capacity at Ishwariya HW)
5 Insurance of Manpower Insurance Manpower engaged
6a Painting synthetic enamel paint to Air Valve Riser
Pipe, Sluice Valve, Air Valve, Connection tee and
Water Proofing cement paint to RCC column at
different place situated on pipeline including
numbering work to all column, transportation,
loading, unloading etc complete.
6b Painting of all civil structures in the campus by
removing and scraping old paint, Finishing wall with
water proofing cement paint of on wall surfaces (Two
coats) to give an approved brand and manufacture 1 Job 24,024.00
and of required shape even shade after thoroughly
brushing the surface to remove all dirt and remains of
loose powered materials.
Sump Cleaning 4.50 ML Capacity at Ishwariya HW
Total Amount for O, M &R Second Year, Rs.
Total Amount for O, M &R Second Year, Rs.
Signature of Contractor Senior Manager
Volume-III, PRICE BID NC-2 Pipeline
NAME OF SCHEME : NC-2 BULK PIPELINE PROJECT
Schedule-B3 : Operation & Maintenance (For 3rd Year )
Comprehensive Operation, Maintenance & Repair of NC-2 Project Chavand to Amreli & Chavand to Babra to
Kotdapitha Bulk Water Transmission Pipeline including all related civil assets with proper supply of water as per
demand for 60 months District: Amreli.
Description Qty. Unit Rate Amount (Rs)
In Figure In Words
1 Operation, Maintenance & Repair of Metallic Pipeline
(MS Pipeline) of NC-2 Project from Chavand to Amreli,
Chavand to Babra, Babra to Kotdapitha Bulk Pipeline
Project including proper supply of water as per
demand, operation & maintenance of all types of
Valves, Encasing, Thrust block, utility crossings, Valve
chambers, Flanged Connections etc. including all
accessories installed in Pipeline including keeping
records. As per extent of work and as per directed by
Engineer incharge
Chavand to Amreli - 1200 / 1100 mm dia Pipeline
(35.53 Km), Chavand to Babra - 1000 mm dia Pipeline
(9.97 Km), Babra to Kotdapitha - 1000 / 600 mm dia
Pipeline (16.98 Km)
2 Establishment
2a Maintenance Engineer (Civil) 1 Nos 355,957.00
2b Lineman (Unskilled) 4 Nos 248,567.00
2c Fitter (Skilled) 2 Nos 259,291.00
2d Chowkidar (Unskilled) 1 Nos 248,567.00
Volume-III, PRICE BID NC-2 Pipeline
3 Utility Vehicle 1 Nos 351,103.00
4 Maintenance of Civil Structures : (RCC U/G Sump of
4.50 ML Capacity at Ishwariya HW)
5 Insurance of Manpower Insurance Manpower engaged
6 Sump Cleaning 4.50 ML Capacity at Ishwariya HW 1 Job 43,349.00
Total Amount for O, M &R Third Year, Rs.
Total Amount for O, M &R Third Year, Rs.
Signature of Contractor Senior Manager
Volume-III, PRICE BID NC-2 Pipeline
NAME OF SCHEME : NC-2 BULK PIPELINE PROJECT
Schedule-B4 : Operation & Maintenance (For 4th Year )
Comprehensive Operation, Maintenance & Repair of NC-2 Project Chavand to Amreli & Chavand to Babra to
Kotdapitha Bulk Water Transmission Pipeline including all related civil assets with proper supply of water as per
demand for 60 months District: Amreli.
Description Qty. Unit Rate Amount (Rs)
In Figure In Words
Operation, Maintenance & Repair of Metallic Pipeline
(MS Pipeline) of NC-2 Project from Chavand to Amreli,
Chavand to Babra, Babra to Kotdapitha Bulk Pipeline
Project including proper supply of water as per
demand, operation & maintenance of all types of
Valves, Encasing, Thrust block, utility crossings, Valve
chambers, Flanged Connections etc. including all
accessories installed in Pipeline including keeping
records. As per extent of work and as per directed by
Engineer incharge
Chavand to Amreli - 1200 / 1100 mm dia Pipeline
(35.53 Km), Chavand to Babra - 1000 mm dia
Pipeline (9.97 Km), Babra to Kotdapitha - 1000 /
mm dia Pipeline (16.98 Km)
2 Establishment
Maintenance Engineer (Civil)
Volume-III, PRICE BID NC-2 Pipeline
Lineman (Unskilled)
2c Fitter (Skilled) 2 Nos 274,849.00
2d Chowkidar (Unskilled) 1 Nos 263,482.00
3 Utility Vehicle 1 Nos 372,170.00
Maintenance of Civil Structures : (RCC U/G Sump of
4.50 ML Capacity at Ishwariya HW)
Insurance of Manpower Insurance Manpower engaged
Painting synthetic enamel paint to Air Valve Riser
Pipe, Sluice Valve, Air Valve, Connection tee and
Water Proofing cement paint to RCC column at
different place situated on pipeline including
numbering work to all column, transportation,
loading, unloading etc complete.
Painting of all civil structures in the campus by
removing and scraping old paint, Finishing wall with
water proofing cement paint of on wall surfaces (Two
6b coats) to give an approved brand and manufacture 1 Job 24,024.00
and of required shape even shade after thoroughly
brushing the surface to remove all dirt and remains of
loose powered materials.
Sump Cleaning 4.50 ML Capacity at Ishwariya HW
Total Amount for O, M &R Fourth Year, Rs.
Total Amount for O, M &R Fourth Year, Rs.
Signature of Contractor Senior Manager
Volume-III, PRICE BID NC-2 Pipeline
NAME OF SCHEME : NC-2 BULK PIPELINE PROJECT
Schedule-B5 : Operation & Maintenance (For 5th Year )
Comprehensive Operation, Maintenance & Repair of NC-2 Project Chavand to Amreli & Chavand to Babra to
Kotdapitha Bulk Water Transmission Pipeline including all related civil assets with proper supply of water as per
demand for 60 months District: Amreli.
Description Qty. Unit Rate Amount (Rs)
In Figure In Words
1 Operation, Maintenance & Repair of Metallic Pipeline
(MS Pipeline) of NC-2 Project from Chavand to Amreli,
Chavand to Babra, Babra to Kotdapitha Bulk Pipeline
Project including proper supply of water as per
demand, operation & maintenance of all types of
Valves, Encasing, Thrust block, utility crossings, Valve
chambers, Flanged Connections etc. including all
accessories installed in Pipeline including keeping
records. As per extent of work and as per directed by
Engineer incharge
Chavand to Amreli - 1200 / 1100 mm dia Pipeline
(35.53 Km), Chavand to Babra - 1000 mm dia
Pipeline (9.97 Km), Babra to Kotdapitha - 1000 /
mm dia Pipeline (16.98 Km)
2 Establishment
2a Maintenance Engineer (Civil) 1 Nos 399,954.00
Lineman (Unskilled)
2c Fitter (Skilled) 2 Nos 291,340.00
2d Chowkidar (Unskilled) 1 Nos 279,291.00
Volume-III, PRICE BID NC-2 Pipeline
3 Utility Vehicle 1 Nos 394,501.00
4 Maintenance of Civil Structures : (RCC U/G Sump of
4.50 ML Capacity at Ishwariya HW)
5 Insurance of Manpower Insurance Manpower engaged
6 Sump Cleaning 4.50 ML Capacity at Ishwariya HW 1 Job 48,707.00
Total Amount for O, M &R Fifth Year, Rs.
Total Amount for O, M &R Fifth Year, Rs.
Signature of Contractor Senior Manager
Volume-III, PRICE BID NC-2 Pipeline
Name of Project: NC-2 Bulk Pipeline Project
Design And Construction of Security Room at Babra Headwork
Description Qty. Unit Rate Amount (Rs)
In figure in words
1 Designing (asthetically) and constructing Security
room at Babra HW. (1) minimum 15 % opening for
ventilation should be provided. (2) Wooden door
and windows of aluminium section and window
grill of iron should be provided. (3) Plinth level
should be minimum 1 meter above G.L.
Security Room at Babra HW as per direction of EIC
(Note: Washroom/Toilet Block should be provided)
Signature of Contractor Senior Manager
Volume-III, PRICE BID NC-2 Pipeline
Name of Project: NC-2 Bulk Pipeline Project
Removing and Replacement of Existing Old MS Pipeline with Providing, Supplying, Lowering, Laying and Jointing of
New MS Pipeline between Babra to Kotdapitha Section
Description Qty. Unit Rate Amount (Rs)
In figure in words
1 Removing of existing pipeline incl. removal of specials,
valves jointing material including carting and stacking
of removed material from site of work to the
department store as directed excl. excavation and
1016 mm dia MS Pipe 20.00 RMT 158.00
610 mm dia MS Pipe 50.00 RMT 262.00
2 Manufacture, Supply & Delivery of Electric Resistance
Welded (Up to 400mm)/Submerged Arc Welded(Above
400mm) M.S. Pipe having beveled ends plate or coil
conforming to IS-3589-2001 or its latest
revision/amendment for following thickness outside
diameter at GWSSB store or site anywhere in Gujarat
State including all taxes, insurance, transportation,
freight charges, octroi, inspection charges, loading,
unloading conveyance to Departmental stores, stacking
etc. all complete. (Rate for MS Pipe based on the ex.
works price of HR Coil as Rs.58500 per MT - without GST
(Above 3.15 mm to 10 mm) & Rs. 59000.00 per MT
without GST (Above 10 mm) as onJan-23.( WPI Index of
H. R Coil of Dec-22 is 144)
I/S Solvent free Liquid Epoxy Lining (406 micron) + O/S
3 LPE Coated M. S. Pipe
1016 mm MS Pipe 8.8 mm thick 70.00 RMT 19,024.00
Volume-III, PRICE BID NC-2 Pipeline
3 Excavation for pipeline trenches for water supply,
sewerage line, manhole etc. all with shoring and
struting if required as per required gradient and line
including safety provisions using site rails and stacking
excavated stuff including up to all required lead
cleaning the site etc. complete for all lifts and strata
as specified. (1) Upto 1.50 mt depth
(1) In all sorts of soil & soft murrum 168.00 Cu.m. 89.00
(2) Upto 1.50 mt to 3.00 mt depth
(1) In all sorts of soil & soft murrum 152.00 Cu.m. 98.00
4 Lowering, laying, jointing and welding in position to
correct line & level M.S. Pipe with outer coating &
inside lining/Epoxy painting on pedestal or chairs upon
prepared formation or prepared bedding in trenches
the rates include conveyance from store to site of work
loading, unloading, joint plastering, hydrotesting
1016 mm MS Pipe 8.8 mm thick 70.00 RMT 1,300.00
5 Job connection of Old Existing pipeline with New
Pipeline as per instructions of EIA 1 No
6 Providing C.C.M.:100 for encasing pipes using trap
metal size 12 mm to 50 mm incl. form work curing
consolidation etc. complete for various location on
pipe line, using trap metal 20 mm nominal size.
7 Refilling the pipe line trenches including ramming
watering consolidating, disposal of surplus stuff as 203.00 Cu.m. 22.00
directed within a radius of 3.0 Km.
MS Specials flanged ends above 300 mm dia (1000 ×
mm dia Reducer)
MS Specials flanged ends upto 300 mm dia for Scour
9 Providing and supplying ISI mark CI D/F Sluice Valves as
per IS:14846 (Latest Edition) of following class and
diameter including all taxes, insurance, transportation,
freight charges, octroi, inspection charges, loading,
Volume-III, PRICE BID NC-2 Pipeline
unloading, conveyance to departmental stores,
stacking etc. complete.
PN-1 with Hand Wheel / Cap Operated (PD type short
250 mm dia Sluice Valve as Scour Valve 1.00 No. 15,920.00
10 Lowering, laying and jointing in position following C. I.
/ D/F Reflux valves, Butterfly valves, Sluice valves and
Air valves including cost of all labour, jointing material,
including nut bolts and giving satisfactory hydraulic
testing, etc. complete.
250 mm dia Sluice Valve 1.00 No. 946.00
Volume-III, PRICE BID NC-2 Pipeline
Sr. No. Schedule-B
In Rs. Per Year
1 Schedule B-1 (First Year)
2 Schedule B-2 (Second Year)
3 Schedule B-3 (Third Year)
4 Schedule B-4 (Fourth Year)
5 Schedule B-5 (Fifth Year)
Total Amount Rs.
Total Amount Rs.
Note: The rates to be quoted by the contractor must be exclusive of GST but
inclusive of all other taxes. GST should be paid extra on the admissible payment
as per the approved tender rates; GST should be paid as per prevailing rates at
the time of payment.
I / we am / are willing to carry out the work at ……………. % above / below –
percentage (should be written in figure and words) above / below the estimated
rate mention above.
Estimated cost put to tender Rs. Estimated cost put to tender Rs.
Rs. Add % Rs. Deduct %
Above Rs Below Rs.
Total Rs. Total Rs.
In words Rs. In words Rs.
Signature of Contractor Senior Manager
1. The rates to be quoted by the contractor must be exclusive of GST but inclusive of all
other taxes. GST should be paid extra on the admissible payment as per the approved
tender rates; GST should be paid as per prevailing rates at the time of payment.
2. Schedule B-1 to B-5 is payable on monthly basis. Schedule - C is payable as per Breakup
for Interim Payment as per schedule - D
Volume-III, PRICE BID NC-2 Pipeline
3. The bidders should strictly note that rate will be fixed and firm. No escalation will be
given during the maintenance period.
4. The work should be carried out as per the terms and conditions laid down in the
tender specification.
5. The cost of raw water, electricity will be borne by GWIL. All other required material
for O&M work shall be brought by the contractor at his own cost including loading,
unloading and carting and the same material shall get approval from the Engineer-in-
charge before use in the work.
6. The cost is including all type of taxes (other than GST), octroi, freight, loading,
unloading, carting labor charges payment to labor including insurance, P.F. and all
other liabilities for the staff engaged for the O&M work.
7. Salary of staff shall have to be done through Bank and P.F. shall have to be deducted
from the salary of employees as per prevailing rules and regulations.
8. All replaced material (provided from the department’s store) shall be returned to
department store by the contractor at his own cost.
9. All works specified in schedule-C-1 and Schedule C-2 shall be completed within
Days, failing to which the same shall be carried out by department and recovery shall
be made from Running Bill at double of the quoted rate.
Volume-III, PRICE BID NC-2 Pipeline
SCHEDULE-D: BREAK UP FOR INTERIM PAYMENTS
Percentage Payment to
Item Description of Items
a On approval of Designs
2.0 % of Quoted rate
b On completion of Excavation & base Footings
18.0 % of Quoted rate
c On completion of vertical wall up to plinth
20.0 % of Quoted rate
d Full supporting structure incl. ring beam and top slab
15.0 % of Quoted rate
e Plastering inside & outside with epoxy paint etc.
10.0 % of Quoted rate
(completed with all respects)
f On completion of Security Room incl. fixing doors
10.0 % of Quoted rate
Windows, all sanitary and plumbing fittings
15.0 % of Quoted rate
h After Completion 10.0 % of Quoted rate
Percentage Payment to be
Item Description of Items
a On receipt of materials at project site 65 % of Quoted rate
b On Excavation, Lowering, laying and Jointing 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d On refilling and disposal of surplus stuff 5 % of Quoted rate
e After completion 5 % of Quoted rate
Volume-III, PRICE BID NC-2 Pipeline
Percentage Payment to be
Item Description of Items
a On receipt of materials on site 70 % of Quoted rate
b On erection 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d After completion 5 % of Quoted rate
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. VOL 1A Tech Bid NC-2 Pipeline.pdf
2. VOL 1B GCC NC-2 Pipeline.pdf
3. VOL 1B PART-2 NC-2 Pipeline.pdf
4. VOL 1B PART-3 NC-2 Pipeline.pdf
5. VOL 1B PART-4 EMD GR..pdf
6. VOL 1B PART-5 GST circular.pdf
7. VOL IIA Extent of work NC-2 Pipeline.pdf
8. VOL IIB Civil Tech. Specification NC-2 Pipeline 3.2.26.pdf
9. Volume III Price Bid NC-2 Pipeline.pdf
10. O N M Colour work related.pdf
11. VOL IV General Condition of OM Contract NC-2.pdf
12. Reference Map for tender.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .