Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹1.0 Cr | L1 | Accepted-AOC Award |
| 2 | L2₹1.1 Cr+₹10.5 L (10.2%)Rejected-Finance | ₹1.1 Cr+₹10.5 L (10.2%) | L2 | Rejected-Finance Lowest 2 |
| 3 | Rejected-Technical NO 1 HPPWD DIVISION DHARAMSHALA HIMACHAL PRADESH | - | - | Rejected-Technical Document not received as per requirment |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
21 Apr 2026, 5:00 pmClosed
Executive Engineer
EE HP PWD Division Tanda at Nagrota Bagwan
Construction of Primary Health Centre (PHC) level-II Building at Serathana in Tehsil Nagrota Bagwan Distt Kangra (HP)(SH-Construction of main building including WS and SI, septic Tank and rain water Harvesting System etc)
2026_PWD_133438_1
Nagrota 09.04.2026
Open Tender
Civil Works - Buildings
Percentage
180 days
Nagrota Bagwan
Please refer Tender documents.
14 documents required · 14 mandatory
₹5,000
₹2.4 L
18 Jul 2026
9 Apr 2026
22 Apr 2026
9 Apr 2026
21 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains etc. in all kind of soil (not exceeding 1.5 m (one point five Metre) in width or 10 Per Square Metre (ten square Metre) on plan), including dressing of sides and ramming of bottoms, lift upto any height, including getting out the excavated soil and disposal of surplus excavated soil asdirected, within a lead from the edge of excavation . All kind of soil complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, GST and all type of other taxes imposed by the Government. | - | Per Cubic Metre | - | - |
| - | Excavation in drains and channels etcetera; in earth work in all kind of classification of soil, such as pick work, jumper work, pick jumper work, blasting work, hard and soft blasting and work doing in saturated soil including chiseling or welding out works where blasting work is prohibited including shoring, strutting and pumping or bailing out water (Surface and sub soil water) upto any depth or any height / quantum of water including slush which may arrise during dewatering removal of slush and any other mixed variety of soil, stacking the excavated soil for all heights clear from the edge of excavation and then returning the stacked soil in 15cm (Fifteen centimeter) layer when required into plinth sides of foundations etcetera. Consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated earth as per approved drawing, design, specification and as per the entire satisfaction of the Engineer-Incharge including carriage of material within all leads, lifts of and other incidentals. The rate is inclusive of octroi, royality, Malkana, Toll tax, sale tax, GST and any other taxes imposed by the Government. | - | Per Cubic Metre | - | - |
| - | Supplying and filling in plinth with sand under floors,including watering, ramming, consolidating and dressing complete including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, GST and all type of other taxes imposed by the Government. | - | Per cubic metre | - | - |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm (Twenty centimetres) in depth, consolidating each deposited layer by ramming and watering, upto any lead and lift complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, GST and all type of other taxes imposed by the Government. | - | Per Cubic Metre | - | - |
| - | Providing form work with steel plates 3.15 mm (three point fifteen millimeter) thick welded with angle iron frame 30 X 30 X 5 mm (thirty into thirty into five millimeter) so as to give a fair finish including centering, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centering below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Foundation, footings basis of columns etcetera and mass concrete including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, GST and all type of other taxes imposed by the Government. | - | Per Square Metre | - | - |
| - | Providing form work with steel plates 3.15 mm (three point fifteen millimeter) thick welded with angle iron frame 30 X 30 X 5 mm (thirty into thirty into five millimeter) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centering below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Flat surfaces such as soffits of suspended floors, roofs, landings and the like floor etcetera upto any thickness including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, GST and all type of other taxes imposed by the Government. | - | Per Square Metre | - | - |
| - | Providing form work with steel plates 3.15 mm (three point fifteen millimeter) thick welded with angle iron frame 30 X 30 X 5 mm (thirty into thirty into five millimeter) so as to give a fair finish including centering, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Beams, cantilever, girders and lintels. Sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels upto all depth and in all heights including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, GST and all type of other taxes imposed by the Government. | - | Per Square Metre | - | - |
| - | Providing form work with steel plates 3.15 mm (three point fifteen millimeter) thick welded with angle iron frame 30 X 30 X 5 mm (thirty into thirty into five millimeter) so as to give a fair finish including centering, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Columns, Pillars, Piers, Abutments, Posts and Struts up to all width and heights including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, GST and all type of other taxes imposed by the Government. | - | Per Square Metre | - | - |
| - | Providing form work with steel plates 3.15 mm (three point fifteen millimeter) thick welded with angle iron frame 30 X 30 X 5 mm (thirty into thirty into five millimeter) so as to give a fair finish including centering, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centering below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Edges of slabs and breaks in floors and walls up to all width and heights including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, GST and all type of other taxes imposed by the Government. | - | Per Running Metre | - | - |
| - | Providing form work with steel plates 3.15 mm (three point fifteen millimeter) thick welded with angle iron frame 30 X 30 X 5 mm (thirty into thirty into five millimeter) so as to give a fair finish including centering, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centering below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Stairs, (excluding landings) except spiral-staircasesup to all width and heights including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, GST and all type of other taxes imposed by the Government. | - | Per Square Metre | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Sbd.pdf
Tender Documents • 13.65 MB
BOQ_197297.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .