Tender Value
₹35.4 L
EMD Value
₹35,500
Closing Date
31 Oct 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
DEO-CUM-DPC, SAMAGRA SHIKSHA, KANDHAMALA
District Project Coordinator, Samagra Shiksha, Kandhamala, Phulbani
Construction of Kitchen-cum-Dining Hall at Govt. UGHS, Tilakpanga in K.Nuagaon Block
2026_OPEPA_143561_15
Bid Identification No-DPC (K)-04/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Tilakapanga
Please refer tender documents
2 documents required · 2 mandatory
₹6,000
₹35,500
Yes
15 Oct 2026
15 Oct 2026
2 Nov 2026
15 Oct 2026
31 Oct 2026
15 Oct 2026
15 Oct 2026 - 31 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in hard soil with initial lead and lift except sheet rock and boulders (requiring blasting) including dressing and leveling the bed upto the required depth and depositing the excavated materials away form the site with all leads and lifts. T & P shoring and shuttering if required etc. complete as directed by engineer- in charge. | 119.13 | Cum | 282.89 | ₹33,700.69 |
| 2 | Supplying and filling in foundation and ditches with sand well watered and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost, conveyance, loading and unloading , royalties and taxes of all materials and cost of all labour, sundries. T & P required for the work etc complete in all respect as per direction of Engineer incharge. | 114.87 | Cum | 553.93 | ₹63,629.94 |
| 3 | Providing & laying plain cement concrete 1:3:6 ( 1 cement 3 coarse and 6 graded stone aggregate fo 40 mm nominal size) in foundation and pinth including cost of hoisting, lowering laying concrete, ramming , watering and curing etc. complete to required levels laid in layers not exceeding 15cm thick including cost. Conveyance, loading and unloading, royalties and taxes all materials and cost of all labours, sundnes, T & P required for the work complete including dewatering if required as epr instruciton of Engineer-in- charge. | 13.73 | Cum | 7,945.63 | ₹1,09,093.5 |
| 4 | Fly Ash brick masonay in cemnet mortar of (1.6) with portland slag cement, watering and curing etc. including cost, conveyance, loading and unloading, royalities and taxes of all materials and cost of all lbaour sundries T& P required for the works etc complete in all respect as directed by the Enginner -in-charge. a. In Foundation & Plinth | 16.53 | Cum | 6,309.39 | ₹1,04,294.22 |
| 5 | In Super structure | 39.67 | Cum | 6,342.39 | ₹2,51,602.61 |
| 6 | Plain Cement Concrete (1:4:8) using 40 mm size H.G. metal ( crusser brocken ) well rammed including cost, conveyance, royalty taxes of all metarials, etc completed as per the direction of the Engineer-in-charge. | 17.33 | Cum | 7,529.47 | ₹1,30,485.72 |
| 7 | Providing , lifting hoisting laying Reinforced cement concrete of M20 grade in column footings , as per approved designs and drawings having a munimum compressive strength ( in work test) 200 Kg./ Square cm in 15cm. Cubes at 28 days after mixing and tests conducted in accordance with I.S. 416 using 12mm to 20 mm size black hard crusher broken granite stone ships of approved quality from approved quarry washed and cleaned (20mm size not to exceeds 25%) to be mixed in concrete mixture with ordinary protland cement (OPC) including noisting, lowering lying an dcompacting concrete by susing vibrators, watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth proving grooves or beads wherever necessary including cost conveyance, loading and unloading royalities and taxes of all materials and cost of all labours sunones , T & P required fo rthe work ect complete in all respect excluding cost and conveyance of HYSD/MS steel and binding wires , and labour charges for straightaining, cutting , bending etc of M.S. rods of for steel and binding as directed by engineer- in charge..A.Foundation | 37.9 | Cum | 9,233.16 | ₹3,49,936.76 |
| 8 | B.Column and Beam Super structure | 15.97 | Cum | 17,686.72 | ₹2,82,456.92 |
| 9 | C.Lintel | 2.51 | Cum | 16,067.54 | ₹40,329.53 |
| 10 | D.Chajja & Shelve | 29.08 | sqm | 1,356.48 | ₹39,446.44 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Tendernotice_2.pdf
PDF • 3.16 MB
BOQ_614222.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .