| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC KERALA | IDUKKI | KERALA | 685533 | ₹3.2 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹3.2 Cr+₹56,520 (0.18%)Rejected-AOC | ₹3.2 Cr+₹56,520 (0.18%) | L2 | Rejected-AOC Second lowest |
Tender Value
₹3.0 Cr
EMD Value
₹1 L
Closing Date
23 Apr 2020, 3:00 pmClosed
Superintending Engineer, PWD, Roads ,South Circle,
Office of the Superintending Engineer, PWD ,Roads, South Circle, TVPM
Budget Work 2019-20 Chengannur Flood Relief Road reconstruction in Mulakkuzha Grama Panchayat
2020_PWD_353085_1
PWD/2020-21/11731/SOUTHCIR
Open Tender
Civil Works - Roads
Item Rate
270 days
Mulakkuzha Grama Panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,759
Yes
online
₹1 L
Yes
5 Aug 2020
3 Apr 2020
27 Apr 2020
3 Apr 2020
23 Apr 2020
3 Apr 2020
Amount
A1 kidangilthundi- Gurumandiram- Uchikkalpadi Road in ward 9
od33958/2019_2020 : Dismantling of flexible pavements and sectioning the dismantled material and re rolling
4.1.B.1 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. <br> Grading-V - For sub base cum drainage layer - Mix in Place MethodConstruction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub base cum drainage layer - Mix in Place Method
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
od33963/2019_2020 : Mix Seal Surfacing: Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 of MORD.(Total usage of bitumen is 22.00kg/10m2) :-By Manual Means
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.B : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
od33960/2019_2020 : Dry Rubble masonry for foundation and super structure of retaining wall including all cost as per design and drawings
12.8.B.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20<br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20
3.18 : Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
A2 - Vattayathilpadi - Parayan veettilpadi - Girijalayam- Gurumandiram- Vettikkala Road in ward 16
4.1.B.1 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. <br> Grading-V - For sub base cum drainage layer - Mix in Place MethodConstruction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub base cum drainage layer - Mix in Place Method
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
od33961/2019_2020 : Mix Seal Surfacing: Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and nishing to required level and grades as per Technical Specication Clause 509 of MORD.(Total usage of bitumen is 22.00kg/10m2) :-By Manual Means
3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.B : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
A-3-Mekkattil- Kodanthuruthu Road in ward 2
3.18 : Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
4.1.B.1 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. <br> Grading-V - For sub base cum drainage layer - Mix in Place MethodConstruction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub base cum drainage layer - Mix in Place Method
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
od33961/2019_2020 : Mix Seal Surfacing: Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and nishing to required level and grades as per Technical Specication Clause 509 of MORD.(Total usage of bitumen is 22.00kg/10m2) :-By Manual Means
A-4-Ambazhathara-Kochayyathil Road in ward 12
3.18 : Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
4.1.B.1 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. <br> Grading-V - For sub base cum drainage layer - Mix in Place MethodConstruction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub base cum drainage layer - Mix in Place Method
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.B : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
od33960/2019_2020 : Dry Rubble masonry for foundation and super structure of retaining wall including all cost as per design and drawings
12.8.B.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20<br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
9.2.B : Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . <br> 1200 mm dia <br>Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 1200 mm dia
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
A5- Kadampinal padi - R K Industries Road in ward 9
3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.B : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
4.1.B.1 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. <br> Grading-V - For sub base cum drainage layer - Mix in Place MethodConstruction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub base cum drainage layer - Mix in Place Method
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
od33961/2019_2020 : Mix Seal Surfacing: Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and nishing to required level and grades as per Technical Specication Clause 509 of MORD.(Total usage of bitumen is 22.00kg/10m2) :-By Manual Means
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
od33960/2019_2020 : Dry Rubble masonry for foundation and super structure of retaining wall including all cost as per design and drawings
12.8.B.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20<br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20
A -7- Evershine Road (Near MMAR) in ward 18
3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
4.1.B.1 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. <br> Grading-V - For sub base cum drainage layer - Mix in Place MethodConstruction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub base cum drainage layer - Mix in Place Method
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.B : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
A 8 - Eppachan Padi - karippacheril- Kappimala Road in ward 18
od33998/2019_2020 : Dismantling of flexible pavements and sectioning the dismantled materials and re rolling
4.1.B.1 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. <br> Grading-V - For sub base cum drainage layer - Mix in Place MethodConstruction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub base cum drainage layer - Mix in Place Method
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
od34000/2019_2020 : Mix Seal Surfacing Providing , Laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2 mm to 0.9mm Type A aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant , laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical Specification Clause 509 of MORD (Usage of bitumen is 22.00kg/10m2) By Manual Means
3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.B : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
A-12-Aranthakkadu - Kidangilthundil Road in ward 9
od35271/2019_2020 : Dismantling of flexible pavements and sectioning the dismantled material and rerolling
4.1.B.1 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. <br> Grading-V - For sub base cum drainage layer - Mix in Place MethodConstruction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub base cum drainage layer - Mix in Place Method
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
od34000/2019_2020 : Mix Seal Surfacing Providing , Laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2 mm to 0.9mm Type A aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant , laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical Specification Clause 509 of MORD (Usage of bitumen is 22.00kg/10m2) By Manual Means
3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.B : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
A 13- Aranthakadu - Koippurathu - Chempakassery Road in ward 10
od35271/2019_2020 : Dismantling of flexible pavements and sectioning the dismantled material and rerolling
4.1.B.1 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. <br> Grading-V - For sub base cum drainage layer - Mix in Place MethodConstruction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub base cum drainage layer - Mix in Place Method
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
od34000/2019_2020 : Mix Seal Surfacing Providing , Laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2 mm to 0.9mm Type A aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant , laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical Specification Clause 509 of MORD (Usage of bitumen is 22.00kg/10m2) By Manual Means
3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.B : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
P H Ilyas
Bidder Name
P H Ilyas
AZEEZ M .M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .