Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-Finance HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171002 | ₹2.4 L | L1 | Accepted-Finance LOWEST BIDDER |
| 2 | L2₹2.6 LRejected-Finance | ₹2.6 L | L2 | Rejected-Finance OTHER THAN LOWEST BIDDER |
| 3 | L3₹2.7 LRejected-Finance SHYAM COTTAGE RAM NAGAR SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹2.7 L | L3 | Rejected-Finance OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | JASWANT SINGH L2 | Hem Raj L3 | HET RAM L1 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earthwork in all kind of soil such aspick work,jumper work, blasting and chiselling soft/hard rocks where blasting is prohibited and disposal of excavated earth up to all leads and lifts complete as per entire satisfaction of Engineer in Charge. | 8.1 | Cum | 255 ₹2,065.50 | 350 ₹2,835 | 300 ₹2,430 |
| 2.00 | Excavation in foundations trenches etc. (for pipes and pits ) upto all depths in all kinds of soil such as pick work,jumper work, blasting and chiselling soft/hard rocks where blasting is prohibited in all leads and lifts including trimming and dressing of sides levelling of bed to correct excavation and returning the stacked soil after laying jointing and testing of G.I.Pipes in trenches in 15 cm. layers including consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting/timbering and dewatering where ever required including restoration of un-metalled/metalled paved surface of its original conditions including cost of diversion for traffic night signals fixing caution boards and fencing etc.complete in all respects. | 8.1 | Cum | 260 ₹2,106 | 470 ₹3,807 | 400 ₹3,240 |
| 3.00 | Providing and laying cement concrete 1:4:8(1cement:4 sand:8 crushed stone agg. 40mm nominal size)and curing complete excluding cost of form work in foundation and plinth in all leads and lifts. | 3.11 | Cum | 5,000 ₹15,550 | 7,100 ₹22,081 | 5,500 ₹17,105 |
| 4.00Providing and laying cement concrete 1:1.5:3(1cement:1.5 sand:3 crushed stone agg.20mm nominal size )& curing complete excluding the cost of form work and reinforcement for reinforced concrete work in: | ||||||
| 4.01 | In foundation and plinth in all leads and lifts. | 3.38 | Cum | 8,500 ₹28,730 | 9,000 ₹30,420 | 7,500 ₹25,350 |
| 4.02 | Walls ( any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level in all leads and lifts | 8.85 | Cum | 7,500 ₹66,375 | 9,200 ₹81,420 | 7,500 ₹66,375 |
| 5.00Providing form work with steel plates 3.15 mm thick welded with angle iron in frames 30x30x5 mm, so as to give a fair finish including centering ,shuttering, propping etc.with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for-in-situ reinforced concrete and plain concrete work in:- | ||||||
| 5.01 | Flat surfaces such as soffits of suspended floors,roofs,landings and the like floors etc.upto 200mm in thickness in all leads and lifts. | 7.95 | Sqm. | 410 ₹3,259.50 | 310 ₹2,464.50 | 300 ₹2,385 |
| 5.02 | Walls ( any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level in all leads and lifts | 93.81 | Sqm. | 363 ₹34,053.03 | 390 ₹36,585.90 | 300 ₹28,143 |
| 6.00 | Providing Mild/TOR steel reinforcement for RCC work including bending,binding and placing in position compete upto floor two level (TOR /HYSD/Mild steel)in all leads and lifts. | 1,100.25 | kg | 98 ₹1.1 L | 84 ₹92,421 | 87 ₹95,721.75 |
Tender Value
₹3.0 L
EMD Value
₹6,100
Closing Date
12 Aug 2025, 5:00 pmClosed
Executive Engineer Jal Shakti Division
O/O Executive Engineer Jal Shakti Division Thunag Distt Mandi HP
CO Crate wall and RCC wall near Bhueka Bride) (DC Deposit) SDP 2024 645
2025_HPIPH_111303_3
2542-72 DT 29/07/2025
Open Tender
Civil Works - Water Works
90 days
Balichowki
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
₹6,100
Yes
20 May 2026
30 Jul 2025
13 Aug 2025
30 Jul 2025
12 Aug 2025
30 Jul 2025
Amount
Cutting in earthwork in all kind of soil such aspick work,jumper work, blasting and chiselling soft/hard rocks where blasting is prohibited and disposal of excavated earth up to all leads and lifts complete as per entire satisfaction of Engineer in Charge.
Excavation in foundations trenches etc. (for pipes and pits ) upto all depths in all kinds of soil such as pick work,jumper work, blasting and chiselling soft/hard rocks where blasting is prohibited in all leads and lifts including trimming and dressing of sides levelling of bed to correct excavation and returning the stacked soil after laying jointing and testing of G.I.Pipes in trenches in 15 cm. layers including consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting/timbering and dewatering where ever required including restoration of un-metalled/metalled paved surface of its original conditions including cost of diversion for traffic night signals fixing caution boards and fencing etc.complete in all respects.
Providing and laying cement concrete 1:4:8(1cement:4 sand:8 crushed stone agg. 40mm nominal size)and curing complete excluding cost of form work in foundation and plinth in all leads and lifts.
Providing and laying cement concrete 1:1.5:3(1cement:1.5 sand:3 crushed stone agg.20mm nominal size )& curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:
In foundation and plinth in all leads and lifts.
Walls ( any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level in all leads and lifts
Providing form work with steel plates 3.15 mm thick welded with angle iron in frames 30x30x5 mm, so as to give a fair finish including centering ,shuttering, propping etc.with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for-in-situ reinforced concrete and plain concrete work in:-
Flat surfaces such as soffits of suspended floors,roofs,landings and the like floors etc.upto 200mm in thickness in all leads and lifts.
Walls ( any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level in all leads and lifts
Providing Mild/TOR steel reinforcement for RCC work including bending,binding and placing in position compete upto floor two level (TOR /HYSD/Mild steel)in all leads and lifts.
JASWANT SINGH (BID ID -543625)
Hem Raj (BID ID -543642)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
tc.pdf
Tender Documents • 0.23 MB
form_8.pdf
Tender Documents • 1.01 MB
BOQ_162345.xls
BOQ • 0.28 MB
form6.pdf
Tender Documents • 0.87 MB
Download all tender documents and submit your bid