Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st rank₹3.7 LAccepted-AOC | 1st rank | Accepted-AOC 1st | |
| 2 | 2nd₹3.8 L+₹11,396.50 (3.05%)Rejected-AOC CONTRACTOR LSGD PATHANAPURAM PUNALUR KERALA | KOLLAM | KERALA | 689695 | 2nd | Rejected-AOC 2nd | |
| 3 | 3rd rank₹4.0 L+₹24,389.34 (6.53%)Rejected-AOC | 3rd rank | Rejected-AOC 3rd | |
| 4 | 4th₹4.0 L+₹24,389.34 (6.53%)Rejected-AOC | 4th | Rejected-AOC 4th | |
| 5 | 5th₹4.0 L+₹26,283.79 (7.04%)Rejected-AOC PARAVAN VILA VEEDU MELAMMAKAM MARIYAPURAM | 5th | Rejected-AOC 5th |
Tender Value
₹4.7 L
EMD Value
₹11,850
Closing Date
6 Sept 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
O/o the Assistant Executive Engineer, Channel Sub Division, Neyyattinkara
Reformation works
2024_Irrig_688523_1
IRR/IA/TR/4075/2024_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Poovar east branch channel near chainage 2250m
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,045
Yes
₹11,850
Yes
24 Oct 2024
31 Aug 2024
9 Sept 2024
31 Aug 2024
6 Sept 2024
31 Aug 2024
Amount
DETAILED ESTIMATE
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
MANOJ M
Albert S
RAVIDAS M
AJEESH KUMAR AR
RAJEESH M R
JOSE R S
Bidder Name
K V SHIBU
RAVIDAS M
AJEESH KUMAR AR
RAJEESH M R
Albert S
MANOJ M
JOSE R S
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1071496.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .