Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹6.8 L
EMD Value
₹16,946
Closing Date
6 Jan 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer LID and EW
Office of the Assistant Engineer, LIDEW Section, Peruvemba Grama Panchayat
Pno195/23-24 Chorakkode Mariyan Collage road retarring
2023_LSGD_637377_1
ET2/2023-24/AE/LIDEW/PVMB
Open Tender
Civil Works - Roads
Item Rate
180 days
Peruvemba GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,495
Yes
₹16,946
Yes
19 Feb 2024
29 Dec 2023
9 Jan 2024
29 Dec 2023
6 Jan 2024
29 Dec 2023
Amount
RETARRING
OD299765/2023-2024:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material within all lifts and lead upto 1 km ( by mechanical means).
3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil.
4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
OD29858/2022-2023:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface
75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.2.2pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.9.3.pb.pa:Plastic roads- Packed Bitumen Rate 20mm thick Open-Graded Premix Carpetusing Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 -Packed Bitumen and Shredded Plastic Providing, laying and rolling of opengradedpremix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregateseither using penetration grade bitumen or emulsion to required line, grade and level toserve as wearing course on a previously prepared base, using HM Plant attached withopen pugmilll.Heating of aggregate at 150 degree Celsius to 170 degree Celsius, thentransferring the hot aggregate to pugmill and add shredded plastic @10.22 kg/100m2mixing well to form a uniform thin layer of plastic over - hot aggregate and adding hotbitumen (150 to 165 degree Celsius) @ 13.578 Kg/10m2 and mix well, laying and rollingwith a. three wheel 80-100 kN static roller capacity, finished to required level and gradesto be- followed by seal coat of either Type A or Type B or Type C as per TechnicalSpecification Clause 508 Case - I By Manual Means (II) Bitumen (S-65),including supplying and stacking of materials.
75.5.12.A.3.2pb:Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 A. By Manual Means Case III : Type C (II) Bitumen (S-65)
Name board
OD244411/2023-2024:Supplyinng and providing readymade GI name board with all conveyance , labour and hire charges etc. complete using GI hollow tube of size 80*40*1.4mm post , 40*20*1.4mm outer frame , 0.6mm thick Iron sheet of size 90*60cm with two coat of enamel painting over a coat of primer , lettering with suitable colour and size ,fixing the post in ground with cc 1:2:4 etc complete
Subhash A
Bidder Name
Manoj A
Subhash A
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_969106.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .